• Hinkley Point delayed another year as costs rise by £3bn

    Hinkley Point delayed another year as costs rise by £3bn
    Completion of Hinkley Point C has been delayed by another year as the cost of building the giant nuclear plant is estimated to have risen by an extra £3bn.
    Client EDF has confirmed the targeted start of electricity generation has been pushed back to June 2027 while final construction costs are estimated at between £25bn and £26bn.
    Stuart Crooks, Managing director of Hinkley Point C said in a message: “You will all have experienced the severe impact of Covid-19 on the proj
  • ISG starts £28m duo of Yorkshire leisure centre jobs

    ISG starts £28m duo of Yorkshire leisure centre jobs
    ISG is starting building work on two leisure centres in Yorkshire for Harrogate Borough Council and Alliance Leisure.
    In Harrogate, the existing Hydro centre will be extended and refurbished to include a 400 sq m fitness suite, a new sauna and steam suite and overhaul of the existing pool and leisure facilities.
    Externally, the building will be remodelled to complement the surrounding environment
    Energy-efficient, air source heat pumps will replace the existing gas boilers.The project will be ca
  • DfE to unveil plans for school procurement shake-up

    DfE to unveil plans for school procurement shake-up
    The Department for Education is a shake-up of school and college procurement ahead of its existing construction and offsite frameworks coming up for renewal.
    Procurement chiefs aim to reshape future procurement strategy to bring it into step with the Government’s Construction Playbook priorities and the Transforming Infrastructure Performance Roadmap to 2030.
    They also aim to build on the new specification for more sustainable school buildings and see the supply chain rise to the challenge
  • Former Mace boss joins Taylor Wimpey board

    Former Mace boss joins Taylor Wimpey board
    Former Mace chief operations officer Mark Castle has joined Taylor Wimpey as a non-executive director.
    Castle stepped down as Mace COO last April after 16 years in the role and previously held executive roles at Structuretone and Wates.
    He is a non executive director at Mace, digital business Eleco and recently became Non Executive Chairman of Triangle Group – the private equity backed fire safety business.Taylor Wimpey chairman Irene Dormer said: “Mark’s deep operational knowl
  • Advertisement

  • Plan for £100m clifftop hotel and flats in Newquay

    Plan for £100m clifftop hotel and flats in Newquay
    Developer Salboy has revealed plans for a landmark £100m redevelopment of Narrowcliff in the Cornish seaside town of Newquay.
    The seafront development would involve construction of a new four to five star 77-bedroom hotel, 168 new apartments and space for five commercial units.
    This will replace the existing Narrowcliff hotel, Hotel Bristol and two residential properties, as well as the Narrowcliff GP surgery which is relocating.The new hotel will contain a gym, swimming pool, spa with tre
  • Top 30 M&E contractors set for growth – ranking

    Top 30 M&E contractors set for growth – ranking
    The country’s leading M&E contractors have weathered the pandemic suffering an average revenue fall of just 4% among the top 30 specialists.
    Most are now looking forward to a return to revenue growth even in the face of unpredictable market conditions around labour and availability of air source heat pumps in particular but also sprinkler pumps and transformers.
    The challenging trading environment did see a few casualties over the last 12 months with the collapse of MechFS and Kershaw
  • Green light for 1.4m sq ft Yorkshire logistic hub

    Green light for 1.4m sq ft Yorkshire logistic hub
    Detailed planning has been granted for 1.1m sq ft of speculatively built warehouse space in Yorkshire, being delivered by joint venture partners Henderson Park and Cole Waterhouse.
    Konect 62, a 136-acre tri-modal logistics development, was acquired with outline planning consent for 1.4m sq ft of prime logistics accommodation.
    Aerial view of phase 1 plan
    At 735,000 sq ft, ‘Big K’ is the largest of four units that will be delivered as part of the 1.1m sq ft phase 1.
    The development rep
  • HS2 workforce surges to 25,000 jobs milestone

    HS2’s workforce increased by more than 2,000 in the last quarter, with the construction of Britain’s new railway now supporting a record 24,800 jobs.
    HS2’s latest reporting figures also show it has smashed the 900 new apprentice starts milestone, just 20 months since full construction works began on first phase of the project.
    It isand HS2 is well on track to reach its target of 2,000 apprenticeships. 923 apprentices have now benefitted from HS2’s investment in their care
  • Advertisement

Follow @new_constructio on Twitter!