<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title><![CDATA[Construction  - Newslocker]]></title><link>https://www.newslocker.com/en-us/profession/construction_news/</link><atom:link rel="self" href="https://www.newslocker.com/en-us/profession/construction_news/rss/1000/" /><atom:link rel="hub" href="http://pubsubhubbub.appspot.com" /><description><![CDATA[Find your latest Construction  news with just one click. Don't miss out on anything happening in your profession!]]></description><language>en-us</language><copyright>Copyright (C) 2026 newslocker.com</copyright><lastBuildDate>Thu, 03 Sep 2026 16:47:00 +0200</lastBuildDate><item><title><![CDATA[Mace and Arcadis land lead role on £2.5bn Luton Airport expansion]]></title><description><![CDATA[A team of Mace Consult and Arcadis have landed the lead programme management role on the &pound;2.5bn-plus expansion of London Luton Airport.<br />
Airport owner Luton Rising has brought in the consultants to provide programme, project, cost and commercial management services as the major expansion moves into its delivery phase.<br />
The team will establish the programme schedule, systems, controls and decision-making framework for the phased growth plan, which will increase airport capacity to 32 million]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-and-arcadis-land-lead-role-on-25bn-luton-airport-expansion/</link><pubDate>Thu, 03 Sep 2026 16:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-and-arcadis-land-lead-role-on-25bn-luton-airport-expansion/</guid></item><item><title><![CDATA[McLaren starts on industrial site at Hinckley]]></title><description><![CDATA[McLaren Construction Midlands &amp; North has started work on two new logistics units at the &pound;48m Mountpark Hinckley site in Leicestershire.<br />
Construction of the steel frames is set to start later this month on the two high-specification warehouse distribution units totaling 772,340 sq ft.<br />
McLaren&rsquo;s contract also includes the delivery of hardstanding, service yards, car parking, landscaping, mains services and drainage across the site.Gary Cramp, Managing Director at McLaren Construct]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-starts-on-industrial-site-at-hinckley/</link><pubDate>Thu, 03 Sep 2026 09:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-starts-on-industrial-site-at-hinckley/</guid></item><item><title><![CDATA[Crest Nicholson issues profit warning as lender talks slip]]></title><description><![CDATA[Crest Nicholson has issued a profit warning after weaker summer trading pushed the house builder from an expected profit into a forecast &pound;10m operating loss.<br />
The group had previously guided to EBIT profit of between &pound;5m and &pound;10m for the year.<br />
It has also cut its completions forecast to 1,350-1,400 homes from 1,400-1,500 as affordability pressures and competitive pricing continue to hit sales.The warning came as Crest revealed talks with lenders over amendments to its banking co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/crest-nicholson-issues-profit-warning-as-lender-talks-slip/</link><pubDate>Thu, 03 Sep 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/crest-nicholson-issues-profit-warning-as-lender-talks-slip/</guid></item><item><title><![CDATA[Galliford Try wins £110m Leicestershire pipeline job]]></title><description><![CDATA[Severn Trent has awarded Galliford Try a &pound;110m contract to build a major cross-country pipeline taking treated foul water out of the protected River Mease catchment.<br />
Galliford Try&rsquo;s Environment business will deliver the River Mease Improvement project, including a 23km pipeline carrying treated flows from Packington and Measham sewage treatment works towards the River Tame, near Elford, Staffordshire<br />
The scheme is being driven by Water Industry National Environment Programme requirem]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-wins-110m-leicestershire-pipeline-job/</link><pubDate>Thu, 03 Sep 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-wins-110m-leicestershire-pipeline-job/</guid></item><item><title><![CDATA[Restructuring costs see Eurocell make a loss]]></title><description><![CDATA[Restructuring costs saw UPVC materials supplier Eurocell slump to a pre-tax loss of &pound;1.4m during the six months to June 30 2026 from a &pound;3.8m profit last time as turnover increased to &pound;205.2m from &pound;193.2m.<br />
Exceptional costs of &pound;9.6m hit the bottom line as adjusted pre-tax profits edged up to &pound;8.2m from &pound;7.8m.<br />
Restructuring moves to adjust to a subdued market included the closure of ten branches this summer and consolidating two recycling plants into one.R]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/restructuring-costs-see-eurocell-make-a-loss/</link><pubDate>Thu, 03 Sep 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/restructuring-costs-see-eurocell-make-a-loss/</guid></item><item><title><![CDATA[New app sees AI and humans work together on construction quality]]></title><description><![CDATA[A new AI and human-led app has been launched to help end avoidable errors in construction.<br />
QualiT is designed to improve quality across the construction lifecycle &mdash; helping teams prevent defects, reduce rework and deliver projects to the highest standard every time, first time.<br />
The digital quality tool combines AI with HI (Human Intelligence) &mdash; turning frontline knowledge into consistent, high-quality delivery.<br />
Duane McCreadie, Founder and Director of QualiT, has over 20 years experi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/new-app-sees-ai-and-humans-work-together-on-construction-quality/</link><pubDate>Wed, 02 Sep 2026 21:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/new-app-sees-ai-and-humans-work-together-on-construction-quality/</guid></item><item><title><![CDATA[Go-ahead for 200 council homes at Battersea Power Station]]></title><description><![CDATA[Planning permission has been granted for 200 council homes on the next phase of the Battersea Power Station regeneration in London.<br />
The homes will be delivered by Battersea Power Station Development Company in partnership with Wandsworth Council on an undeveloped brownfield plot within Phase 5 of the 42-acre masterplan.<br />
All 200 homes will be operated by the council, with properties including family housing available at social rent levels under its Homes for Wandsworth programme.<br />
Construction is]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-200-council-homes-at-battersea-power-station/</link><pubDate>Wed, 02 Sep 2026 17:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-200-council-homes-at-battersea-power-station/</guid></item><item><title><![CDATA[Graham gets Gateway 2 OK for Manchester student scheme]]></title><description><![CDATA[GRAHAM has secured Gateway 2 approval to start main construction on the &pound;286m redevelopment of Cambridge Halls for Unite Students and Manchester Metropolitan University.<br />
The Building Safety Regulator has cleared the first phase of the 2,302-bed student accommodation scheme, allowing structural groundworks to get underway following completion of demolition.<br />
The project will replace Manchester Met&rsquo;s former 770-bed Cambridge Halls complex with a series of buildings rising to 30 storeys.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-gets-gateway-2-ok-for-manchester-student-scheme/</link><pubDate>Wed, 02 Sep 2026 16:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-gets-gateway-2-ok-for-manchester-student-scheme/</guid></item><item><title><![CDATA[Graham gets Gateway 2 OK for £286m Manchester student scheme]]></title><description><![CDATA[GRAHAM has secured Gateway 2 approval to start main construction on the &pound;286m redevelopment of Cambridge Halls for Unite Students and Manchester Metropolitan University.<br />
The Building Safety Regulator has cleared the first phase of the 2,302-bed student accommodation scheme, allowing structural groundworks to get underway following completion of demolition.<br />
The project will replace Manchester Met&rsquo;s former 770-bed Cambridge Halls complex with a series of buildings rising to 30 storeys.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-gets-gateway-2-ok-for-286m-manchester-student-scheme/</link><pubDate>Wed, 02 Sep 2026 16:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-gets-gateway-2-ok-for-286m-manchester-student-scheme/</guid></item><item><title><![CDATA[Blackburn picks firms for £50m highways framework]]></title><description><![CDATA[Local Lancashire civils firms George Cox &amp; Sons, Multipave and NMS Civil Engineering have secured places on the main civils lot of Blackburn with Darwen Council&rsquo;s new &pound;50m highways framework.<br />
The trio beat competition from 13 other firms for the &pound;20m civils package covering highway and road construction work across the borough.<br />
Eric Wright Civil Engineering, PP O&rsquo;Connor, Bethell Construction, Casey and JJ O&rsquo;Grady were among the unsuccessful bidders for the civil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/blackburn-picks-firms-for-50m-highways-framework/</link><pubDate>Wed, 02 Sep 2026 09:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/blackburn-picks-firms-for-50m-highways-framework/</guid></item><item><title><![CDATA[CField returns to profit after legacy jobs cleared]]></title><description><![CDATA[Family-run CField Construction has returned to profit after completing a number of challenging legacy contracts that dragged the London-based contractor into the red last year.<br />
Turnover fell to &pound;83m in the year to December 2025 from &pound;119m previously, but improved project performance saw the business post a &pound;3.3m pre-tax profit against a &pound;1.2m loss in 2024.<br />
Operating profit recovered to &pound;3.1m from a &pound;1.2m loss, giving the contractor an operating margin of aroun]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cfield-returns-to-profit-after-legacy-jobs-cleared/</link><pubDate>Wed, 02 Sep 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cfield-returns-to-profit-after-legacy-jobs-cleared/</guid></item><item><title><![CDATA[First section of latest HS2 viaduct installed]]></title><description><![CDATA[Construction of the new Saltley Viaduct made major progress over the August Bank Holiday weekend with the successful installation of the first section of the new bridge over the Birmingham to Derby railway lines.<br />
The original Saltley Viaduct, which spanned a 183&#8209;metre section of the B4114, closed to vehicles and pedestrians in May 2026.&nbsp; It was then demolished so that a new, taller structure could be built in its place, allowing high speed trains to safely pass below.<br />
The replacement]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/first-section-of-latest-hs2-viaduct-installed/</link><pubDate>Wed, 02 Sep 2026 08:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/first-section-of-latest-hs2-viaduct-installed/</guid></item><item><title><![CDATA[Balfour appoints management consultant to lead strategy]]></title><description><![CDATA[Balfour Beatty has appointed Emma Loxton to the new role of Chief Strategy Officer.<br />
Loxton joins from management consultant&nbsp;McKinsey &amp; Company where she spent more than a decade advising major industrial and infrastructure businesses on strategy, transformation and growth.<br />
She was a partner at McKinsey, most recently leading the UK Advanced Industries and Transport &amp; Infrastructure practices.<br />
Earlier in her career, Loxton was a Senior Policy Advisor in the UK Government&rsquo;s Prim]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-appoints-management-consultant-to-lead-strategy/</link><pubDate>Tue, 01 Sep 2026 15:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-appoints-management-consultant-to-lead-strategy/</guid></item><item><title><![CDATA[Gilbert-Ash confirms £40m RIBA HQ revamp deal]]></title><description><![CDATA[Gilbert-Ash has signed off the &pound;40m job to overhaul the Royal Institute of British Architects&rsquo; landmark London headquarters.<br />
The contractor is carrying out the major refurbishment and restoration of the Grade II* listed 66 Portland Place building in Westminster, with completion due in September 2027.<br />
The Portland Place scheme will act as a pilot project for the Net Zero Carbon Building Standard and involves a major upgrade of the building fabric and services.Gilbert-Ash is stripping]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gilbert-ash-confirms-40m-riba-hq-revamp-deal/</link><pubDate>Tue, 01 Sep 2026 14:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gilbert-ash-confirms-40m-riba-hq-revamp-deal/</guid></item><item><title><![CDATA[Laing O’Rourke to start £400m Lancashire prison job]]></title><description><![CDATA[Laing O&rsquo;Rourke has secured the enabling works deal for a major new &pound;400m-plus prison planned alongside HMP Garth and HMP Wymott in Lancashire.<br />
The Ministry of Justice has now signed off the package for the 1,700-place category C jail near Leyland, clearing the way for early works ahead of completion targeted in 2031.<br />
The scheme, presently known as HMP Garth 2, will provide around 74,500 sq m of accommodation across seven four-storey house blocks, each holding about 245 prisoners.Init]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-to-start-400m-lancashire-prison-job/</link><pubDate>Tue, 01 Sep 2026 14:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-to-start-400m-lancashire-prison-job/</guid></item><item><title><![CDATA[Barnwood warns of tougher market after profit fall]]></title><description><![CDATA[Employee-owned regional building contractor Barnwood saw pre-tax profit fall by more than a third last year as tighter margins offset continued revenue growth.<br />
Turnover at the Gloucestershire-based group rose 15% to &pound;118m in the year to December 2025 from &pound;103m, while pre-tax profit fell to &pound;3.3m from &pound;5.1m.<br />
Operating profit dropped to &pound;2.7m from &pound;4.7m, cutting operating margin to 2.3% from 4.5%.Despite the squeeze, Barnwood doubled its annual contribution to]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barnwood-warns-of-tougher-market-after-profit-fall/</link><pubDate>Tue, 01 Sep 2026 09:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barnwood-warns-of-tougher-market-after-profit-fall/</guid></item><item><title><![CDATA[Data centre plan unveiled for former IBM site]]></title><description><![CDATA[Plans have been submitted to transform part of Greenock&rsquo;s former IBM site into a major data centre development.<br />
Slate Island Developments Ltd has applied to Inverclyde Council for the development at Spango Valley, off Inverkip Road.<br />
IBM opened its Spango Valley operation on the site in 1954 and the facility closed in 2017 with buildings being demolished in 2020.Slate Island Developments is now seeking to regenerate part of the former technology and industrial site for modern digital infras]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/data-centre-plan-unveiled-for-former-ibm-site/</link><pubDate>Tue, 01 Sep 2026 09:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/data-centre-plan-unveiled-for-former-ibm-site/</guid></item><item><title><![CDATA[Brick maker battles “long trough” in construction]]></title><description><![CDATA[Michelmersh saw brick dispatches drop another 9% in the first half of this year with volumes more than 25% below the recent 2022 peak.<br />
The sales slump has forced the manufacturer to juggle factory output to meet decreased demand including the complete closure of its Charnwood site in Leicestershire with the loss of 30 jobs.<br />
Things are unlikely to improve anytime soon following a &ldquo;long trough&rdquo; in construction activity.Chief Executive Officer Ryan Mahoney said: &ldquo;The lack of posit]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/brick-maker-battles-long-trough-in-construction/</link><pubDate>Tue, 01 Sep 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/brick-maker-battles-long-trough-in-construction/</guid></item><item><title><![CDATA[Government names line-up for £120bn FM framework]]></title><description><![CDATA[Government procurement chiefs have named the major FM contractors that will compete for the biggest jobs under a new framework valued at up to &pound;120bn.<br />
Amey, CBRE, Equans, Kier, Mitie, OCS, Serco, Skanska, Sodexo, Vinci Facilities and Wates are among 18 firms appointed to the top Total Facilities Management lot covering individual contracts worth more than &pound;15m a year.<br />
The other winners on the highest value work lot are Compass, Dalkia, G4S Facilities Management, ISS, JLL, Robertson F]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-names-line-up-for-120bn-fm-framework/</link><pubDate>Tue, 01 Sep 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-names-line-up-for-120bn-fm-framework/</guid></item><item><title><![CDATA[Bidding set to start for £800m south Wales civils framework]]></title><description><![CDATA[Five councils are gearing up to invite contractors to bid for places for the next-generation South West Wales civil engineering framework worth up to &pound;800m.<br />
Over 60 firms on the existing civils framework now face a fight to retain places on the four year deal with invitations to tender due out on 5 October.<br />
Carmarthenshire County Council is leading the procurement with Ceredigion, Neath Port Talbot, Pembrokeshire and Swansea councils.Natural Resources Wales, Powys County Council and compan]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bidding-set-to-start-for-800m-south-wales-civils-framework/</link><pubDate>Tue, 01 Sep 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bidding-set-to-start-for-800m-south-wales-civils-framework/</guid></item><item><title><![CDATA[Graham to build Sky Livingston Campus]]></title><description><![CDATA[GRAHAM has been appointed main contractor for Sky&rsquo;s new Livingston Campus after planning commission was granted for the 21,000 sq metre scheme in West Lothian.<br />
The project will bring &nbsp;together Sky&rsquo;s existing operations into a modern workplace for around 3,000 employees.<br />
It will replace four existing buildings at Kirkton Campus and leased space on the Alba Campus, creating a new site spanning 15 acres.Chris MacLeod, regional director at GRAHAM Building North, said:&ldquo;Sky&rsqu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-to-build-sky-livingston-campus/</link><pubDate>Tue, 01 Sep 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-to-build-sky-livingston-campus/</guid></item><item><title><![CDATA[Mount Anvil profit rises 24% as JV schemes drive earnings]]></title><description><![CDATA[London developer/contractor Mount Anvil Group lifted underlying pre-tax profit by nearly a quarter last year, with earnings largely driven by strong returns from its joint venture developments.<br />
The London residential specialist reported pre-tax profit of &pound;10.4m for the year to March 2026 on turnover of &pound;346m.<br />
Its prior year accounts covered 15 months following a change in year end. Pro-rating those figures to 12 months gives comparable pre-tax profit of &pound;8.5m and turnover of ar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mount-anvil-profit-rises-24-as-jv-schemes-drive-earnings/</link><pubDate>Fri, 28 Aug 2026 08:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mount-anvil-profit-rises-24-as-jv-schemes-drive-earnings/</guid></item><item><title><![CDATA[John F Hunt starts basement build at Tenter House]]></title><description><![CDATA[John F Hunt has started piling work and basement construction at the 45 Moorfields development &ndash; formerly known as Tenter House &ndash; in the City of London.<br />
The start of Phase 1 of the scheme follows nine months of pre-construction works undertaken in close collaboration with developer Freshwater, which included the demolition of the existing 11-storey building and extensive enabling activities to prepare the site for the redevelopment.<br />
Hunt&rsquo;s latest package includes the constructi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-starts-basement-build-at-tenter-house/</link><pubDate>Fri, 28 Aug 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-starts-basement-build-at-tenter-house/</guid></item><item><title><![CDATA[Thames Water to retender £500m Teddington river abstraction job]]></title><description><![CDATA[Thames Water is preparing to retender its &pound;500m Teddington Direct River Abstraction project after abandoning plans to procure the main tunnelling and treatment plant works separately.<br />
The utility has switched strategy to combine the major civils and tunnelling works with construction of the advanced water treatment facility at Mogden sewage treatment works under a single main contract.<br />
Thames Water said the switch to a single-contractor delivery model would simplify interfaces and strength]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/thames-water-to-retender-500m-teddington-river-abstraction-job/</link><pubDate>Fri, 28 Aug 2026 08:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/thames-water-to-retender-500m-teddington-river-abstraction-job/</guid></item><item><title><![CDATA[Willmott Dixon starts £40m Leeds rail office overhaul]]></title><description><![CDATA[Willmott Dixon has just started work on a &pound;40m overhaul of the Princes Exchange office building next to Leeds station.<br />
Network Rail is bringing the vacant eight-storey building back into use to create a new city centre hub for rail industry staff alongside five floors of commercial office space.<br />
The 108,576 sq ft building sits opposite the Aire Street entrance to Leeds City Station and was bought by Network Rail in 2024.The Department for Transport and Network Rail-funded scheme is being d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-starts-40m-leeds-rail-office-overhaul/</link><pubDate>Fri, 28 Aug 2026 08:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-starts-40m-leeds-rail-office-overhaul/</guid></item><item><title><![CDATA[Durkan quits contracting]]></title><description><![CDATA[Durkan is quitting the contracting market completely after 50 years in construction.<br />
The move was confirmed in latest results for parent company Durkan Holdings Ltd following a period of the contracting operation being scaled down.<br />
The company said: &ldquo;Following more than 50 years operating in the contracting sector, Durkan has taken the strategic decision to withdraw from this activity.&ldquo;This decision reflects the increasing legislative and regulatory burden in the sector which has dri]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/durkan-quits-contracting/</link><pubDate>Thu, 27 Aug 2026 13:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/durkan-quits-contracting/</guid></item><item><title><![CDATA[Morgan Sindall names new London construction chief]]></title><description><![CDATA[Morgan Sindall Construction has promoted Richard Dobson to regional managing director for London as part of a wider management shake-up across the capital and Home Counties.<br />
Dobson, who has built his career with Morgan Sindall in London, will lead the capital business alongside newly appointed regional commercial director Adam Allen.<br />
The contractor has also expanded its Home Counties operation after a sustained period of growth, creating a new Northern Home Counties Ventures business headed by d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-names-new-london-construction-chief/</link><pubDate>Thu, 27 Aug 2026 09:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-names-new-london-construction-chief/</guid></item><item><title><![CDATA[Hill lands £1.5bn Lewisham regeneration partnership]]></title><description><![CDATA[London&rsquo;s Lewisham Council has picked Hill Group as its long-term development partner under a deal covering up to &pound;1.5bn of construction work across the south London borough.<br />
The 10-year strategic partnership, which can be extended for a further five years, will be used to accelerate affordable housing and regeneration projects rather than procuring a separate development partner for each scheme.<br />
Hill was appointed following a year-long procurement process involving detailed dialogue]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-lands-15bn-lewisham-regeneration-partnership/</link><pubDate>Thu, 27 Aug 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-lands-15bn-lewisham-regeneration-partnership/</guid></item><item><title><![CDATA[Wates to finish Ardmore’s  £200m Britannia resi towers job]]></title><description><![CDATA[Wates is set to take over completion of Hackney Council&rsquo;s near-&pound;200m Britannia housing scheme following the collapse of Ardmore Construction Group.<br />
The council is preparing to enter a pre construction services agreement with Wates in September, which has already taken over management and security of the site.<br />
Ardmore was appointed in 2023 to deliver the final &pound;197m phase of the Britannia Masterplan in Shoreditch, comprising 371 homes across four tower blocks.The scheme includes]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-to-finish-ardmores-200m-britannia-resi-towers-job/</link><pubDate>Thu, 27 Aug 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-to-finish-ardmores-200m-britannia-resi-towers-job/</guid></item><item><title><![CDATA[Fire safety costs see Durkan record another loss]]></title><description><![CDATA[Durkan Group saw operating profit increase last year but fire remedation claims dragged the South East house builder and regeneration specialist back into the red.<br />
Latest results for parent company Durkan Holdings Limited for the year ended 30 November 2025 show an increase in operating profit to &pound;6.2m on a turnover of &pound;142m.<br />
But &pound;18.6m of exceptional costs for fire remediation claims arising from legacy developments under the Building Safety Act saw Durkan make an overall net]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fire-safety-costs-see-durkan-record-another-loss/</link><pubDate>Thu, 27 Aug 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fire-safety-costs-see-durkan-record-another-loss/</guid></item><item><title><![CDATA[HB Reavis unveils retrofit rethink for stalled Waterloo mega-scheme]]></title><description><![CDATA[London developer HB Reavis has unveiled a major rethink of its stalled One Waterloo scheme with plans to retain much of the existing Elizabeth House structure and switch from commercial new build to a mixed-use retrofit-led project.<br />
The developer has launched consultation on proposals that would bring together two hotels, purpose-built student accommodation, build-to-rent homes, offices, shops and leisure space on the prominent site next to Waterloo Station.PLP Architecture has drawn up the new]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hb-reavis-unveils-retrofit-rethink-for-stalled-waterloo-mega-scheme/</link><pubDate>Thu, 27 Aug 2026 08:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hb-reavis-unveils-retrofit-rethink-for-stalled-waterloo-mega-scheme/</guid></item><item><title><![CDATA[Over 2,000 unsafe cladding blocks still waiting for work to start]]></title><description><![CDATA[More than 2,000 residential blocks over 11m with unsafe cladding are still waiting for remediation work to start, with the Government&rsquo;s newer safety funding programmes now accounting for the bulk of the backlog.<br />
Latest Government figures up to July show 2,146 of the 4,697 buildings being monitored have yet to start remediation work.<br />
That means 46% of identified buildings have yet to start work, compared with 718 under way and 1,833 completed.The biggest challenge sits with the Cladding Saf]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/over-2000-unsafe-cladding-blocks-still-waiting-for-work-to-start/</link><pubDate>Thu, 27 Aug 2026 08:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/over-2000-unsafe-cladding-blocks-still-waiting-for-work-to-start/</guid></item><item><title><![CDATA[Graham lands £50m Basingstoke school rebuild]]></title><description><![CDATA[Graham has signed a contract for the &pound;50m rebuild of Cranbourne Secondary School in Basingstoke.<br />
The contractor will replace seven existing buildings, including 1960s blocks containing RAAC, with a new 10,000 sq m school on the existing Wessex Close site.<br />
Early works started this summer ahead of foundation work getting underway in the autumn.Graham regional director Pat O&rsquo;Hare said a new two and three-storey building would bring teaching, specialist learning and sports facilities und]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-lands-50m-basingstoke-school-rebuild/</link><pubDate>Thu, 27 Aug 2026 08:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-lands-50m-basingstoke-school-rebuild/</guid></item><item><title><![CDATA[Bridgestone bags £18m care homes deal]]></title><description><![CDATA[Bridgestone Construction has been selected by Anchor, England&rsquo;s largest not-for-profit provider of housing and care for people in later life, to progress the &pound;18m Park House development in Waterloo, Sefton, following a competitive tender through the ICN framework.<br />
Park House is the second major scheme Bridgestone has secured through the framework, following the award of Chestergate in Stockport.<br />
The scheme will create 90 new one- and two-bedroom specialist and affordable homes, compr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bridgestone-bags-18m-care-homes-deal/</link><pubDate>Wed, 26 Aug 2026 23:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bridgestone-bags-18m-care-homes-deal/</guid></item><item><title><![CDATA[Rayner tells councils to find sites for new housing push and funding]]></title><description><![CDATA[Councils across England have been ordered to review their house building plans and bring forward fresh bids for billions of pounds of still-unallocated affordable housing funding.<br />
Housing secretary Angela Rayner and housing minister Matthew Pennycook have written to every council leader demanding authorities &ldquo;scale up now&rdquo; as the Government seeks to deliver the biggest council house building programme since the early 1980s.<br />
Councils are being asked to review plans for increasing coun]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rayner-tells-councils-to-find-sites-for-new-housing-push-and-funding/</link><pubDate>Wed, 26 Aug 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rayner-tells-councils-to-find-sites-for-new-housing-push-and-funding/</guid></item><item><title><![CDATA[Rayner tells councils to find sites for new homes push]]></title><description><![CDATA[Councils across England have been ordered to review their house building plans and bring forward fresh bids for billions of pounds of still-unallocated affordable housing funding.<br />
Housing secretary Angela Rayner and housing minister Matthew Pennycook have written to every council leader demanding authorities &ldquo;scale up now&rdquo; as the Government seeks to deliver the biggest council house building programme since the early 1980s.<br />
Councils are being asked to review plans for increasing coun]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rayner-tells-councils-to-find-sites-for-new-homes-push/</link><pubDate>Wed, 26 Aug 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rayner-tells-councils-to-find-sites-for-new-homes-push/</guid></item><item><title><![CDATA[House builder went down owing subcontractors £35m]]></title><description><![CDATA[West Country house builder Devonshire Homes went into administration owing subcontractors and suppliers more than &pound;35m.<br />
The scale of the firm&rsquo;s debts was revealed in a Companies House update by administrators Marsal Europe LLP .<br />
Devonshire Homes went into administration in June when most of the 44 staff were made redundant.The administration affects Devonshire Homes Limited only and does not extend to other Devonshire Homes-branded developments or associated companies.<br />
Devonshire Hom]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/house-builder-went-down-owing-subcontractors-35m/</link><pubDate>Wed, 26 Aug 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/house-builder-went-down-owing-subcontractors-35m/</guid></item><item><title><![CDATA[Kier seals £29m early works for £170m Blackburn biogas plant]]></title><description><![CDATA[Kier has started on a &pound;29m early works package for United Utilities&rsquo; planned &pound;170m advanced anaerobic digestion project in Blackburn.<br />
The contractor is progressing design development, surveys, ground investigations, enabling works and site preparation at Blackburn Wastewater Treatment Works ahead of a decision on the main construction phase.<br />
The scheme is being developed through United Utilities&rsquo; Enterprise delivery model, which brings together the water company&rsquo;s o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-seals-29m-early-works-for-170m-blackburn-biogas-plant/</link><pubDate>Wed, 26 Aug 2026 08:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-seals-29m-early-works-for-170m-blackburn-biogas-plant/</guid></item><item><title><![CDATA[Kier and Tilbury Douglas win £108m schools double]]></title><description><![CDATA[Kier and Tilbury Douglas have secured preconstruction deals on two Department for Education school projects worth up to &pound;108m.<br />
Kier has been lined up for the larger &pound;77m overhaul of RAAC-hit Stepney All Saints Church of England Secondary School in east London, while Tilbury Douglas has landed the &pound;31m Cavendish School scheme in Eastbourne.<br />
The Stepney All Saints project will involve the design and build and refurbishment of the existing 1,500-place secondary school and sixth fo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-and-tilbury-douglas-win-108m-schools-double/</link><pubDate>Tue, 25 Aug 2026 11:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-and-tilbury-douglas-win-108m-schools-double/</guid></item><item><title><![CDATA[BAM raids Robertson for new Scotland regional boss]]></title><description><![CDATA[BAM UK &amp; Ireland has recruited Robertson Construction board director Mike King to head its construction business in Scotland.<br />
King will replace Jim Ward, who recently retired, as regional director for Scotland on 17 September, bringing nearly 30 years of engineering, project management and construction leadership experience.<br />
He joins from Robertson Construction Group, where he was executive technical director and a board member.At Robertson, King worked across the contractor&rsquo;s eight re]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bam-raids-robertson-for-new-scotland-regional-boss/</link><pubDate>Tue, 25 Aug 2026 10:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bam-raids-robertson-for-new-scotland-regional-boss/</guid></item><item><title><![CDATA[Finance deal agreed for 30-storey Cardiff tower]]></title><description><![CDATA[The finance deal has been completed for a 30-storey tower currently under construction in Cardiff.<br />
Close Brothers Property Finance has agreed a &pound;67.2m facility to support Draycott Group in delivering the 340-unit Build to Rent scheme which is set to be one of the tallest buildings in Wales.<br />
The main tower crane is now in place at Harlech Court where Intelle Construction is main contractor and Stephenson RC Frames the frame contractor.Phil Hooper, CEO of Close Brothers Property Finance, sai]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/finance-deal-agreed-for-30-storey-cardiff-tower/</link><pubDate>Tue, 25 Aug 2026 10:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/finance-deal-agreed-for-30-storey-cardiff-tower/</guid></item><item><title><![CDATA[SCAPE opens bidding for £8bn construction framework]]></title><description><![CDATA[Procurement specialist SCAPE has opened bidding for its next &pound;8bn national construction framework, offering up to 15 contractor places across five lots.<br />
The Construction Works and Services Framework will cover England, Wales and Northern Ireland and is expected to run from 2027 to 2031, with the option of a further two-year extension.<br />
SCAPE plans to appoint three delivery partners to each lot, giving public sector clients more choice when selecting contractors for individual projects.The l]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scape-opens-bidding-for-8bn-construction-framework/</link><pubDate>Tue, 25 Aug 2026 10:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scape-opens-bidding-for-8bn-construction-framework/</guid></item><item><title><![CDATA[Vistry to receive £350m in Homes England funding]]></title><description><![CDATA[Vistry Homes will receive &pound;350m in government grant funding to help deliver social and affordable homes across the country, outside of London.<br />
The firm was among 33 strategic partners confirmed today by Homes England to help deliver the government&rsquo;s new &pound;39bn Social and Affordable Homes Programme (SAHP).<br />
Most of the organisations on the list for the ten-year funding programme are housing associations and councils.Homes England Chief Executive Amy Rees said: &ldquo;The strong de]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-to-receive-350m-in-homes-england-funding/</link><pubDate>Tue, 25 Aug 2026 08:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-to-receive-350m-in-homes-england-funding/</guid></item><item><title><![CDATA[National Highways fires gun on £8bn roads upkeep deal]]></title><description><![CDATA[Big highways contractors are gearing up for a &pound;8bn battle after National Highways fired the starting gun on its next-generation road maintenance framework.<br />
The invitation to tender has now gone out for the Maintenance and Response 2 framework, which will overhaul upkeep of England&rsquo;s 4,500-mile strategic road network.<br />
The new seven regions regime will replace the existing 10 maintenance contracts set up as they expire from July 2028. Current area contractors include Amey, Colas, Costa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/national-highways-fires-gun-on-8bn-roads-upkeep-deal/</link><pubDate>Mon, 24 Aug 2026 23:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/national-highways-fires-gun-on-8bn-roads-upkeep-deal/</guid></item><item><title><![CDATA[Energy and coastal work powers Knights Brown growth]]></title><description><![CDATA[Civil engineering contractor Knights Brown has lifted pre-tax profit by 44% after strong performances from its coastal and energy businesses.<br />
The independent Hampshire-based firm saw revenue rise 17% to a record &pound;136m in the year to March 2026 driving an uplift in profit to &pound;5.6m from &pound;3.9m.<br />
Directors said the improvement in average operating margin to 4% reflected tighter project selection, strong delivery and disciplined commercial management.Coasts and ports, and energy were]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/energy-and-coastal-work-powers-knights-brown-growth/</link><pubDate>Mon, 24 Aug 2026 23:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/energy-and-coastal-work-powers-knights-brown-growth/</guid></item><item><title><![CDATA[Firms named to advance £89m trio of school jobs]]></title><description><![CDATA[Tilbury Douglas, McLaren Construction and Willmott Dixon have secured preconstruction deals on three Department for Education school projects with estimated works values of up to &pound;89m.<br />
The contractors have been appointed under the DfE&rsquo;s Construction Framework to take the schemes through early supplier involvement ahead of agreeing final design and build contracts.<br />
The &pound;89m combined figure is based on the DfE&rsquo;s early-stage broad estimates, prior to designs being drawn up.T]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/firms-named-to-advance-89m-trio-of-school-jobs/</link><pubDate>Mon, 24 Aug 2026 22:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/firms-named-to-advance-89m-trio-of-school-jobs/</guid></item><item><title><![CDATA[Contractors called up for £80m Llandeilo bypass]]></title><description><![CDATA[Welsh Government has fired the starting gun on the bidding for the long-delayed A483 Llandeilo and Ffairfach bypass in Carmarthenshire.<br />
Up to five contractors will be shortlisted to bid for the &pound;80m highways project.<br />
It will provide a new route around Llandeilo and Ffairfach to take through traffic away from the congested town centre and improve safety on the existing A483 corridor.A preferred route has already been identified and the project includes a new bridge of around 100m over the R]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-called-up-for-80m-llandeilo-bypass/</link><pubDate>Mon, 24 Aug 2026 22:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-called-up-for-80m-llandeilo-bypass/</guid></item><item><title><![CDATA[Cardo snaps up 280-staff compliance specialist CCS]]></title><description><![CDATA[Cardo Group has continued its acquisition spree with the purchase of Andover-based compliance and energy contractor Correct Contract Services.<br />
The deal strengthens Cardo&rsquo;s electrical, heating and retrofit capabilities and expands its reach across southern and central England.<br />
Correct Contract Services employs more than 280 staff and provides compliance and energy services to more than 50,000 properties for local authorities and social housing landlords.The &pound;30m turnover business was]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cardo-snaps-up-280-staff-compliance-specialist-ccs/</link><pubDate>Mon, 24 Aug 2026 22:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cardo-snaps-up-280-staff-compliance-specialist-ccs/</guid></item><item><title><![CDATA[Metro mayors given power to override councils on big schemes]]></title><description><![CDATA[Mayors across England are set to be handed powers to seize control of major planning applications from councils in a fresh drive to speed up development.<br />
The new call-in regime will cover schemes of more than 150 homes, commercial projects above 15,000 sq m and buildings taller than 30m, roughly equivalent to ten storeys.<br />
Under proposals due to be published next week, regional mayors will be able to take over strategically important applications and decide whether they should go ahead or be refu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/metro-mayors-given-power-to-override-councils-on-big-schemes/</link><pubDate>Mon, 24 Aug 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/metro-mayors-given-power-to-override-councils-on-big-schemes/</guid></item><item><title><![CDATA[Network Plus margin climbs to 9.4% on utilities boom]]></title><description><![CDATA[Private equity-backed utility and infrastructure contractor Network Plus Services has more than doubled pre-tax profit to &pound;55m as booming water and energy workloads pushed turnover towards &pound;700m.<br />
Revenue jumped 15% to &pound;671m in the year to 29 March 2026, driven by higher volumes on existing energy and water contracts alongside a string of new wins.<br />
The Greater Manchester-based business also saw adjusted EBITDA surge 45% to &pound;63m, with its adjusted EBITDA margin climbing to]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/network-plus-margin-climbs-to-94-on-utilities-boom/</link><pubDate>Mon, 24 Aug 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/network-plus-margin-climbs-to-94-on-utilities-boom/</guid></item><item><title><![CDATA[Go-ahead for High Wycombe warehouse scheme]]></title><description><![CDATA[Pension fund manager Railpen has secured planning consent for Phase 2 of the High Wycombe X industrial and logistics scheme<br />
The latest round of construction at Cressex Business Park will deliver 145,000 sq ft of space across five units.<br />
Developed in partnership with Wrenbridge, High Wycombe X forms part of Railpen&rsquo;s growing X portfolio, an industry-first branded collection of small and medium-sized industrial and logistics developments.Scheme are strategically located around the M25 and ot]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-high-wycombe-warehouse-scheme/</link><pubDate>Mon, 24 Aug 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-high-wycombe-warehouse-scheme/</guid></item><item><title><![CDATA[Green light for 425 rental flats Cambridge station scheme]]></title><description><![CDATA[Plans for 425 build-to-rent homes on railway land next to Cambridge North station have been approved.<br />
The Cambridge North Residential Quarter is being brought forward by blocwork, the joint venture between Network Rail property development company Platform4 and developer bloc.<br />
Grainger has been lined up to forward fund the rental homes scheme and will operate and manage the homes once completed.Cambridge City Council and South Cambridgeshire District Council approved the proposals, clearing the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-425-rental-flats-cambridge-station-scheme/</link><pubDate>Mon, 24 Aug 2026 07:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-425-rental-flats-cambridge-station-scheme/</guid></item><item><title><![CDATA[Landsec clears reset of stalled £1bn North London scheme]]></title><description><![CDATA[Landsec has secured planning for a reboot of its stalled &pound;1bn O2 Centre new homes regeneration scheme in North London.<br />
The original 1,800-home strip-site scheme stalled as rising construction costs and new building safety requirements hit viability.<br />
Camden Council has now approved Landsec&rsquo;s revised plan for the 14-acre Finchley Road site, allowing the developer to increase the height of several buildings and reduce affordable housing to restart development.The wider masterplan will s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/landsec-clears-reset-of-stalled-1bn-north-london-scheme/</link><pubDate>Mon, 24 Aug 2026 07:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/landsec-clears-reset-of-stalled-1bn-north-london-scheme/</guid></item><item><title><![CDATA[Winvic holds £1bn turnover despite tougher markets]]></title><description><![CDATA[Shed and multi-room specialist Winvic stayed in the &pound;1bn-plus turnover club for a second year despite tougher markets.<br />
Turnover at Winvic Group edged down 1% to &pound;1.003bn in the year to January 2026 from last year&rsquo;s peak with pre-tax profit also slipping to &pound;30m from &pound;32m. That pushed operating margin down to 2.5% from 2.8%.<br />
Despite the softer result, Winvic said it was strongly placed to resume growth with a &pound;1.68bn forward order book and 85% of forecast 2026/]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winvic-holds-1bn-turnover-despite-tougher-markets/</link><pubDate>Fri, 21 Aug 2026 12:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winvic-holds-1bn-turnover-despite-tougher-markets/</guid></item><item><title><![CDATA[Cautious subbies contain Ardmore losses at £5.1m]]></title><description><![CDATA[Subcontractors have been left &pound;5.1m out of pocket by the collapse of Ardmore Construction Group, which went down owing creditors &pound;29m.<br />
The supply chain hit is more contained than many had feared after firms tightened credit as concern grew over Ardmore&rsquo;s exposure to major building safety claims.<br />
Ardmore Construction Group entered administration on 11 June after Crest Nicholson secured a &pound;14.99m adjudication decision over alleged fire safety defects at the 569-home Admiral]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cautious-subbies-contain-ardmore-losses-at-51m/</link><pubDate>Fri, 21 Aug 2026 08:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cautious-subbies-contain-ardmore-losses-at-51m/</guid></item><item><title><![CDATA[Lendlease lodges 2,000-home Stratford plan finale]]></title><description><![CDATA[Lendlease and The Crown Estate have lodged plans for 2,000 homes to complete the final phase of Stratford Cross in east London.<br />
The major residential push will bring affordable and market homes, student accommodation and co-living to the site between Queen Elizabeth Olympic Park and Westfield Stratford City.<br />
Plans submitted to Newham Council also include a new park, shops and public paths to Stratford station.Subject to planning, construction is due to start in 2028 and run for around three year]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lendlease-lodges-2000-home-stratford-plan-finale/</link><pubDate>Thu, 20 Aug 2026 23:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lendlease-lodges-2000-home-stratford-plan-finale/</guid></item><item><title><![CDATA[Caddick poaches second B&amp;K boss for East Midlands push]]></title><description><![CDATA[Caddick Construction has hired former Bowmer + Kirkland senior contracts manager Mark Lambkin as construction director for the East Midlands.<br />
Lambkin joins after 13 years with B+K and will help Caddick build its regional operation as the firm targets the growing pipeline of high-rise residential projects.<br />
His recent projects include Capital&amp;Centric&rsquo;s &pound;60m Goods Yard build-to-rent scheme in Stoke-on-Trent and the &pound;130m IQ Echo Street student accommodation development in Manc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-poaches-second-bampk-boss-for-east-midlands-push/</link><pubDate>Thu, 20 Aug 2026 23:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-poaches-second-bampk-boss-for-east-midlands-push/</guid></item><item><title><![CDATA[Morgan Sindall wins enabling deal on Plymouth Civic Centre retrofit]]></title><description><![CDATA[Morgan Sindall is set to land a &pound;6.5m enabling works package to kick-start the main redevelopment of Plymouth&rsquo;s landmark Civic Centre.<br />
The City Council is expected to sign off the enabling works deal next week to allow work to start immediately.<br />
Officials said pressing ahead with this package would avoid delays of up to a year while the second-stage design and tender process continues.The council and development partner Capital&amp;Centric split the project into two packages because]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-wins-enabling-deal-on-plymouth-civic-centre-retrofit/</link><pubDate>Thu, 20 Aug 2026 23:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-wins-enabling-deal-on-plymouth-civic-centre-retrofit/</guid></item><item><title><![CDATA[Morgan Sindall wins enabling deal of Plymouth Civic Centre retrofit]]></title><description><![CDATA[Morgan Sindall is set to land a &pound;6.5m enabling works package to kick-start the main redevelopment of Plymouth&rsquo;s landmark Civic Centre.<br />
The City Council is expected to sign off the enabling works deal next week to allow work to start immediately.<br />
Officials said pressing ahead with this package would avoid delays of up to a year while the second-stage design and tender process continues.The council and development partner Capital&amp;Centric split the project into two packages because]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-wins-enabling-deal-of-plymouth-civic-centre-retrofit/</link><pubDate>Thu, 20 Aug 2026 23:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-wins-enabling-deal-of-plymouth-civic-centre-retrofit/</guid></item><item><title><![CDATA[Curo Construction went down owing supply chain £21m]]></title><description><![CDATA[London building and fitout contractor Curo Construction went down owing more than 500 subcontractors and suppliers &pound;21m.<br />
The scale of the company&rsquo;s debts was highlighted in an update at Companies House filed by administrators who took charge of the firm in July.<br />
Curo also owed its 135 ex-employees &pound;860,000 and HMRC nearly &pound;3m in outstanding VAT, PAYE and National Insurance payments.Sister company Curo Interiors, which also went into administration in July, had debts of &p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/curo-construction-went-down-owing-supply-chain-21m/</link><pubDate>Thu, 20 Aug 2026 17:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/curo-construction-went-down-owing-supply-chain-21m/</guid></item><item><title><![CDATA[HS2 starts 700m final Birmingham viaduct launch]]></title><description><![CDATA[HS2 has started launching the final and longest viaduct on the challenging approach to Birmingham Curzon Street station.<br />
Balfour Beatty Vinci has just pushed the first 170m section of the 700m-long Duddeston Junction Viaduct over two busy freight lines.<br />
The move marks the start of a major engineering operation to span six live tracks, including three freight and three passenger lines.Work to complete the crossing is due to run until next summer, with the next launch phase over the passenger rail]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-starts-700m-final-birmingham-viaduct-launch/</link><pubDate>Thu, 20 Aug 2026 09:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-starts-700m-final-birmingham-viaduct-launch/</guid></item><item><title><![CDATA[Scaffold artwork shrouds Faithdean Fenwick store site]]></title><description><![CDATA[A 120-metre long by 24-metre high artwork is now shrouding the scaffolding at the former Fenwick department store on New Bond Street.<br />
Emerging Forms by British artist Hugo Dalton gives a glimpse of how the revamped store will look after its transformation by main contractor Faithdean<br />
The artwork was installed following completion of work to raise the original facade of the building.The finished project&nbsp;will also feature permanent artworks by the artist.<br />
Dalton said: &ldquo;For a few weeks t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scaffold-artwork-shrouds-faithdean-fenwick-store-site/</link><pubDate>Thu, 20 Aug 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scaffold-artwork-shrouds-faithdean-fenwick-store-site/</guid></item><item><title><![CDATA[Magrock lands South Mimms industrial scheme]]></title><description><![CDATA[Magrock has won the contract to build a new &pound;12m industrial and logistics facility at South Mimms Services in Hertfordshire.<br />
Work on the project for pension scheme giant Railpen and developer Wrenbridge will start this month<br />
The site is located next to the M25 and work will involve the demolition of existing small buildings followed by the design and construction of a 120,000 sq ft Grade A warehouse facility.Richard Brewer, Managing Director at Magrock, said: &ldquo;The scheme represents a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/magrock-lands-south-mimms-industrial-scheme/</link><pubDate>Thu, 20 Aug 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/magrock-lands-south-mimms-industrial-scheme/</guid></item><item><title><![CDATA[Bids called for £800m fire safety framework renewal]]></title><description><![CDATA[Efficiency East Midlands has started the bid race for an &pound;800m fire safety and building remediation framework for public buildings<br />
The four-year deal will replace EEM&rsquo;s existing framework when it expires in November and is expected to start in February 2027.<br />
Up to 80 places are available across 10 lots covering major remediation works, fire safety consultancy and the supply and installation of fire doors.The two major works lots will cover external wall, fa&ccedil;ade and cladding re]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bids-called-for-800m-fire-safety-framework-renewal/</link><pubDate>Thu, 20 Aug 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bids-called-for-800m-fire-safety-framework-renewal/</guid></item><item><title><![CDATA[Anti-dumping tariffs imposed on Chinese cherry pickers]]></title><description><![CDATA[Imported Chinese cherry pickers will be hit with tariffs of up to 71% following an anti-dumping investigation by the Trade Remedies Authority (TRA).<br />
The TRA launched a probe in December following an application by UK boom lift producer Niftylift Limited based in Milton Keynes.<br />
It found evidence that boom lifts originating from China are being dumped and are causing injury to the UK market.The TRA has ecommended, and the UK Government agreed, that a provisional measure should be imposed, with an]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/anti-dumping-tariffs-imposed-on-chinese-cherry-pickers/</link><pubDate>Thu, 20 Aug 2026 08:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/anti-dumping-tariffs-imposed-on-chinese-cherry-pickers/</guid></item><item><title><![CDATA[Bouygues bags £64m Crawley school rebuild]]></title><description><![CDATA[Bouygues UK has secured a &pound;64m job to rebuild Holy Trinity CofE Secondary School in Crawley under the Government&rsquo;s School Rebuilding Programme.<br />
Work starts this month on the phased redevelopment of the West Sussex school while the school remains fully operational.<br />
The main element is a new 9,300 sq m three-storey teaching building on land south of the existing campus.Pupils and staff will move into the new block before existing buildings are demolished.<br />
Bouygues will also refurbish t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bouygues-bags-64m-crawley-school-rebuild/</link><pubDate>Thu, 20 Aug 2026 07:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bouygues-bags-64m-crawley-school-rebuild/</guid></item><item><title><![CDATA[OHOB eyes growth as residential logjam clears]]></title><description><![CDATA[O&rsquo;Halloran &amp; O&rsquo;Brien Group has pushed pre-tax profit above &pound;25m despite turnover falling by a fifth as delays to high-rise residential schemes continued to hold back workloads.<br />
Turnover at parent company OHOB Holdings dropped to &pound;294m in the year to March 2026 from &pound;367m previously.<br />
But pre-tax profit rose 15% from &pound;21.8m to &pound;25.1m, while operating margin strengthened to 6.5% from 5.2%.<br />
Directors said the result was boosted by successful final accoun]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ohob-eyes-growth-as-residential-logjam-clears/</link><pubDate>Thu, 20 Aug 2026 07:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ohob-eyes-growth-as-residential-logjam-clears/</guid></item><item><title><![CDATA[Big contract wins see profits surge at Sisk Group]]></title><description><![CDATA[A strong performance at the UK division helped Irish contractor Sisk report 27% profit growth in its latest results.<br />
Parent company Sicon Limited saw pre-tax profits rise to &euro;74.2m for the year ended 31 December 2025 from &euro;58.1m last time despite turnover dipping to &euro;2,624.3m from &euro;2,752.1m.<br />
In the UK turnover rose to &euro;1,002.7m from &euro;850.2m driven by wins across residential, commercial, infrastructure and specialist rail services.Sisk CEO, Paul Brown, said: &ldquo;2]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/big-contract-wins-see-profits-surge-at-sisk-group/</link><pubDate>Wed, 19 Aug 2026 15:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/big-contract-wins-see-profits-surge-at-sisk-group/</guid></item><item><title><![CDATA[Public raise alarm over roof work at London hotel]]></title><description><![CDATA[A construction company and a director have been fined after workers lives were put at risk with unsafe roof work in central London.<br />
The HSE took action against B&amp;O Developers Ltd and Sanjay Swaminaryan after members of the public raised concerns about unsafe working practices during extension and refurbishment of what is now the Kings Cross Express Inn on Kings Cross Road.<br />
In January 2024, concerned members of the public sent photographs to HSE showing people working on a roof at the site wi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/public-raise-alarm-over-roof-work-at-london-hotel/</link><pubDate>Wed, 19 Aug 2026 08:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/public-raise-alarm-over-roof-work-at-london-hotel/</guid></item><item><title><![CDATA[Mansell Building Solutions files administration notice]]></title><description><![CDATA[MMC specialist contractor Mansell Building Solutions has filed a notice of intention to appoint an administrator just six months after opening a major new factory and headquarters in Oldham.<br />
The light gauge steel frame specialist, established in 1992, operates from a 45,000 sq ft facility at Broadway Business Park in Chadderton.<br />
The new factory and MMC Centre was 50% larger than Mansell&rsquo;s previous facility and significantly increased capacity to manufacture panelised light gauge steel fram]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mansell-building-solutions-files-administration-notice/</link><pubDate>Wed, 19 Aug 2026 07:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mansell-building-solutions-files-administration-notice/</guid></item><item><title><![CDATA[Powerday on track with new recycling centre]]></title><description><![CDATA[Powerday has reached a significant milestone in the redevelopment of its Croydon Materials Recycling Facility (MRF), with the site&rsquo;s structural steel framework now nearing completion as construction progresses towards its planned opening in April 2027.<br />
Powerday, London&rsquo;s leading waste management and recycling service provider, announced the redevelopment earlier this year as part of its continued investment in recycling infrastructure. Once operational, the facility will become Power]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/powerday-on-track-with-new-recycling-centre/</link><pubDate>Tue, 18 Aug 2026 23:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/powerday-on-track-with-new-recycling-centre/</guid></item><item><title><![CDATA[Wernick launches RestPods so staff can sleep on sites]]></title><description><![CDATA[Wernick Hire has introduced RestPod overnight site accommodation to help staff recover from early starts, night shifts and long hours.<br />
RestPod can now support engineers, supervisors, commissioning teams and specialist contractors on remote construction and infrastructure projects.<br />
Wernick said RestPod is more than a temporary building with beds.<br />
The self-contained cabins are designed with premium features, including ensuite shower rooms, integrated heating and LED lighting, USB charging points,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wernick-launches-restpods-so-staff-can-sleep-on-sites/</link><pubDate>Tue, 18 Aug 2026 23:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wernick-launches-restpods-so-staff-can-sleep-on-sites/</guid></item><item><title><![CDATA[Wernick launches RestPods so builders can sleep on sites]]></title><description><![CDATA[Wernick Hire has introduced RestPod overnight site accommodation to help staff recover from early starts, night shifts and long hours.<br />
RestPod can now support engineers, supervisors, commissioning teams and specialist contractors on remote construction and infrastructure projects.<br />
Wernick said RestPod is more than a temporary building with beds.<br />
The self-contained cabins are designed with premium features, including ensuite shower rooms, integrated heating and LED lighting, USB charging points,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wernick-launches-restpods-so-builders-can-sleep-on-sites/</link><pubDate>Tue, 18 Aug 2026 23:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wernick-launches-restpods-so-builders-can-sleep-on-sites/</guid></item><item><title><![CDATA[Lift supervisor killed by reversing telehandler]]></title><description><![CDATA[A self-employed telehandler driver has been given a suspended jail sentence after he reversed over his colleague on a construction site in Cheshire, causing fatal injuries.<br />
In June 2023, 49-year-old James Connolly was working as a lift supervisor on a large construction site in Ince, Ellesmere Port, where Michael Nixon was working as a telehandler operator.<br />
On the morning of 11 June, whilst walking back to his work area from the welfare compound, Connolly was struck and reversed over by the tele]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lift-supervisor-killed-by-reversing-telehandler/</link><pubDate>Tue, 18 Aug 2026 15:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lift-supervisor-killed-by-reversing-telehandler/</guid></item><item><title><![CDATA[Hotel client collapse sends McGee £2.8m into red]]></title><description><![CDATA[Specialist engineering contractor McGee suffered a &pound;2.8m pre-tax loss last year after being hit by a &pound;3.6m bad debt from the insolvency of a client on a major London hotel job.<br />
The setback reversed the employee-owned groundwork and demolition firm&rsquo;s previous-year &pound;5.3m profit as turnover also fell 11% to &pound;134m from &pound;151m in the year to November 2025.<br />
McGee said the exceptional bad debt masked a much stronger underlying performance, with EBITDA margin at 6.5% o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hotel-client-collapse-sends-mcgee-28m-into-red/</link><pubDate>Tue, 18 Aug 2026 11:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hotel-client-collapse-sends-mcgee-28m-into-red/</guid></item><item><title><![CDATA[Client steps in to restart Ardmore £500m Kensington tower job]]></title><description><![CDATA[Developer SevenCapital has restarted work on its &pound;500m 100 Kensington residential scheme after taking control of construction through a group company following the administration of Ardmore.<br />
The developer said Seven Capital (Woodrow) Ltd is now acting as main contractor on the 462-home West Cromwell Road project, where construction had been temporarily halted by Ardmore&rsquo;s collapse.<br />
Seven Capital (Woodrow) is an existing SevenCapital group company incorporated in 2016 rather than a ne]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/client-steps-in-to-restart-ardmore-500m-kensington-tower-job/</link><pubDate>Tue, 18 Aug 2026 11:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/client-steps-in-to-restart-ardmore-500m-kensington-tower-job/</guid></item><item><title><![CDATA[Two JVs bag £1.5bn Anglian Water major projects deal]]></title><description><![CDATA[Anglian Water has picked Ferrovial, MWH Treatment and two VolkerWessels UK firms for a &pound;1.5bn framework covering its biggest water and wastewater projects.<br />
Joint venture partners Ferrovial Construction and MWH Treatment have secured places on one contract, while VolkerFitzpatrick and VolkerStevin Infrastructure have secured the second spot on the framework.<br />
The Major Projects Framework marks a significant change in how Anglian plans to deliver its largest capital schemes across AMP8 and be]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/two-jvs-bag-15bn-anglian-water-major-projects-deal/</link><pubDate>Tue, 18 Aug 2026 09:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/two-jvs-bag-15bn-anglian-water-major-projects-deal/</guid></item><item><title><![CDATA[Scape launches £8.5bn dedicated defence framework]]></title><description><![CDATA[Public sector procurement specialist SCAPE has launched its first dedicated Defence and Complex Environments Framework.<br />
The move follows extensive pre-market engagement undertaken as part of the development of its forthcoming National Construction Work and Services Framework, which will be shortly going to tender.<br />
Feedback from contractors, clients and wider stakeholders highlighted strong demand for a dedicated procurement solution focused specifically on defence.SCAPE has now developed a stand]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scape-launches-85bn-dedicated-defence-framework/</link><pubDate>Tue, 18 Aug 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scape-launches-85bn-dedicated-defence-framework/</guid></item><item><title><![CDATA[Equans acquires highways tech specialist Mway]]></title><description><![CDATA[Equans UK has acquired highways technology specialist Mway Communications.<br />
Mway serves National Highways and Tier 1 contractors throughout the UK&rsquo;s Strategic Road Network delivering critical technology and engineering solutions.<br />
The company employs 100 people and generates an annual turnover of &pound;26m.Bouygues-owned Equans said the deal will expand its expertise in connected infrastructure, operational technology, and communications networks.<br />
Mway&rsquo;s comprehensive portfolio includ]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/equans-acquires-highways-tech-specialist-mway/</link><pubDate>Tue, 18 Aug 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/equans-acquires-highways-tech-specialist-mway/</guid></item><item><title><![CDATA[Victory for mobile crane operators in police row]]></title><description><![CDATA[Mobile crane operators have won a major legal victory in a long-running dispute&nbsp; with West Midlands Police.<br />
More than 60 cases against operators have now been dropped by the Crown Prosecution Service after a test trial at Birmingham Magistrates Court involving two mobile crane operators and two drivers collapsed.<br />
West Midlands Police alleged that cranes were travelling during prohibited periods, which in their view meant they were no longer operating lawfully under the relevant road transpo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/victory-for-mobile-crane-operators-in-police-row/</link><pubDate>Tue, 18 Aug 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/victory-for-mobile-crane-operators-in-police-row/</guid></item><item><title><![CDATA[Costain bags £150m Thames Water wastewater programme]]></title><description><![CDATA[Costain has secured a programme of around &pound;150m of wastewater treatment upgrades from Thames Water across 15 sites.<br />
The package forms part of Thames Water&rsquo;s wider plan to upgrade more than 250 sewage treatment and sewer sites between 2025 and 2030.<br />
Costain will split delivery into eastern and western regions, each led by a regional senior project manager.<br />
Eastern sites cover Barkway, Brentwood, Long Reach, Little Hallingbury, North Weald and Standon.<br />
The western programme includes Al]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-bags-150m-thames-water-wastewater-programme/</link><pubDate>Mon, 17 Aug 2026 18:51:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-bags-150m-thames-water-wastewater-programme/</guid></item><item><title><![CDATA[Wates hires Willmott Dixon veteran as operations director]]></title><description><![CDATA[Wates Construction has appointed former Willmott Dixon senior director Roger Forsdyke as UK operations director as it looks to step up growth across the country.<br />
Forsdyke will join Wates on 1 September and take charge of operational teams across all regions, with responsibility for performance across the UK construction business.<br />
He will also lead the next phase of Wates Construction&rsquo;s business optimisation programme.Forsdyke spent 23 years at Willmott Dixon, most recently serving as chief]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-hires-willmott-dixon-veteran-as-operations-director/</link><pubDate>Mon, 17 Aug 2026 12:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-hires-willmott-dixon-veteran-as-operations-director/</guid></item><item><title><![CDATA[Ashbrook fleet up for sale after £18m new JCB kit order]]></title><description><![CDATA[Cheshire-based plant hirer Ashbrook has selected Euro Auctions as its disposal partner as it undertakes a major fleet refresh following a record &pound;18m order for new equipment from JCB.<br />
The first 35 machines will go under the hammer at the Euro Auctions Leeds sale from 19&ndash;22 August, offering buyers a selection of low-hour, manufacturer-maintained and serviced equipment.<br />
Highlights include site dumpers from 3 to 9 tonnes, 15 CAT rollers, manlifts from Manitou, Skyjack and Genie, a late,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ashbrook-fleet-up-for-sale-after-18m-new-jcb-kit-order/</link><pubDate>Mon, 17 Aug 2026 09:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ashbrook-fleet-up-for-sale-after-18m-new-jcb-kit-order/</guid></item><item><title><![CDATA[Willmott Dixon cleared to rebuild RAAC-hit Stockport school]]></title><description><![CDATA[Willmott Dixon has secured planning for a near &pound;50m rebuild of Bramhall High School in Stockport.<br />
Work is expected to start in January 2027 on the new three-storey school, which will replace the existing sprawling campus hit by reinforced autoclaved aerated concrete problems.<br />
Sheppard Robson has designed the replacement school for 1,350 pupils on the existing 36-acre site off Seal Road.The new building will be constructed alongside the current school before most of the existing estate is d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-cleared-to-rebuild-raac-hit-stockport-school/</link><pubDate>Mon, 17 Aug 2026 09:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-cleared-to-rebuild-raac-hit-stockport-school/</guid></item><item><title><![CDATA[Health centre win for Morgan Sindall]]></title><description><![CDATA[Morgan Sindall Construction has been appointed to deliver the new &pound;16.9m Thornbury Health Centre on the former Thornbury hospital site in Gloucestershire.<br />
Construction is due to start by the end of this month with the development due to complete by the end of summer 2027.<br />
Appointed by South Gloucestershire Council through the Southern Construction Framework, the health centre will provide a new home for Severn View Family Practice and Streamside Surgery.The development will provide a total]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/health-centre-win-for-morgan-sindall/</link><pubDate>Mon, 17 Aug 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/health-centre-win-for-morgan-sindall/</guid></item><item><title><![CDATA[Building compliance firm Ventro buys electrical engineer]]></title><description><![CDATA[Building compliance specialist Ventro Group has acquired Walsall based electrical engineer and contractor&nbsp; R.D. Jukes &amp; Co Ltd.<br />
Family run R.D. Jukes &amp; Co was founded in 1968 and currently employs 29 people with a turnover of &pound;6m.<br />
The firm has extensive technical expertise across mains infrastructure, power&nbsp; distribution and complex electrical systems, including standby power, UPS and IPS&nbsp; solutions designed to support critical environments.The business also delivers]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/building-compliance-firm-ventro-buys-electrical-engineer/</link><pubDate>Mon, 17 Aug 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/building-compliance-firm-ventro-buys-electrical-engineer/</guid></item><item><title><![CDATA[Lovell to start first phase of 450-home Horsham scheme]]></title><description><![CDATA[Lovell Partnerships is expected to start work in October on a 206-home redevelopment of the former Novartis Pharmaceuticals site in Horsham.<br />
The 2.72ha scheme will deliver houses and apartments around the site&rsquo;s landmark 1930s Art Deco clock tower, with 35% of the homes affordable.<br />
Architect Ayre Chamberlain Gaunt has designed the development to keep the locally listed tower as the centrepiece of the new neighbourhood.<br />
Multi-storey wings either side will be demolished because of significan]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lovell-to-start-first-phase-of-450-home-horsham-scheme/</link><pubDate>Mon, 17 Aug 2026 08:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lovell-to-start-first-phase-of-450-home-horsham-scheme/</guid></item><item><title><![CDATA[Bouygues UK losses top £200m in four years]]></title><description><![CDATA[Bouygues UK has racked up more than &pound;200m of pretax losses over the last four years after taking another &pound;76m hit in 2025.<br />
The building contractor saw revenue edge up 5% to &pound;395m last year from &pound;376m as activity increased across live projects.<br />
But pretax losses more than doubled from &pound;32m to &pound;76m, with the latest setback blamed on subcontractor performance, labour shortages and continuing building safety liabilities.Parent group support continued during the ye]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bouygues-uk-losses-top-200m-in-four-years/</link><pubDate>Mon, 17 Aug 2026 08:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bouygues-uk-losses-top-200m-in-four-years/</guid></item><item><title><![CDATA[Taylor Woodrow breaks into Devon roads framework]]></title><description><![CDATA[Taylor Woodrow has broken into Devon County Council&rsquo;s highways framework in a refresh of contractors for the next four years.<br />
The Vinci-owned contractor is the only completely new entrant on the renewed framework, joining four incumbents on the main &pound;48m resurfacing and reconstruction lot.<br />
Taylor Woodrow Infrastructure will work alongside Cormac Contracting, E &amp; JW Glendinning, Kennford Tarmacadam and Tarmac Trading when the framework starts in September.Devon highways partners r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/taylor-woodrow-breaks-into-devon-roads-framework/</link><pubDate>Mon, 17 Aug 2026 07:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/taylor-woodrow-breaks-into-devon-roads-framework/</guid></item><item><title><![CDATA[Laing O’Rourke and HMJV lead £1bn Grid upgrade for AI boom]]></title><description><![CDATA[Laing O&rsquo;Rourke and the Hochtief Murphy joint venture have landed the headline construction packages on National Grid&rsquo;s major North West London Upgrade.<br />
The programme will strengthen the electricity transmission network between Bedfordshire, Hertfordshire and North West London while creating enough capacity to connect five new data centres with a combined demand of 1GW.<br />
Laing O&rsquo;Rourke will deliver new and upgraded substations at Letchmore Heath, Elstree and St John&rsquo;s Wood.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-and-hmjv-lead-1bn-grid-upgrade-for-ai-boom/</link><pubDate>Fri, 14 Aug 2026 08:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-and-hmjv-lead-1bn-grid-upgrade-for-ai-boom/</guid></item><item><title><![CDATA[R G Carter eyes rebound after turnover falls to £215m]]></title><description><![CDATA[Regional contractor R G Carter is forecasting a return to growth this year after delayed project starts knocked turnover and profit in 2025.<br />
The Norwich-based firm said its order book for 2026 was &ldquo;significantly stronger&rdquo; and predicted turnover would climb again as delayed projects move onto site.<br />
The privately-owned contractor saw group turnover fall 14% to &pound;215m in the year to December 2025 while pre-tax profit slipped to &pound;10.5m from &pound;12.2m.The group nevertheless]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/r-g-carter-eyes-rebound-after-turnover-falls-to-215m/</link><pubDate>Fri, 14 Aug 2026 08:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/r-g-carter-eyes-rebound-after-turnover-falls-to-215m/</guid></item><item><title><![CDATA[Supply chain hunt starts for hospital construction boom]]></title><description><![CDATA[Subcontractors are being invited sign-up for a major supply chain event for the government&rsquo;s hospital building programme.<br />
The focus will be on five schemes across the East of England to be built under the New Hospital Programme.The projects and main contractors are:North West Anglia NHS Foundation Trust (Hinchingbrooke Hospital) &ndash; Kier Construction<br />
James Paget University Hospitals NHS Foundation Trust &ndash; Skanska<br />
Milton Keynes University Hospital NHS Foundation Trust &ndash; Morg]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/supply-chain-hunt-starts-for-hospital-construction-boom/</link><pubDate>Fri, 14 Aug 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/supply-chain-hunt-starts-for-hospital-construction-boom/</guid></item><item><title><![CDATA[Manchester developer lands £185m funding boost]]></title><description><![CDATA[Greater Manchester developer Forshaw is lining up a &pound;185m residential development fund after signing a letter of intent with Canadian private equity platform AND Capital Ventures.<br />
The proposed investment vehicle will target residential-led and mixed-use schemes across the North of England, giving Forshaw access to institutional funding to accelerate its development pipeline.<br />
The partners plan to establish a closed-ended fund worth up to &pound;185m, with Forshaw taking responsibility for s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/manchester-developer-lands-185m-funding-boost/</link><pubDate>Fri, 14 Aug 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/manchester-developer-lands-185m-funding-boost/</guid></item><item><title><![CDATA[Willmott Dixon joins £150m Great Yarmouth waterfront bid]]></title><description><![CDATA[Willmott Dixon Developments has submitted plans with Rioja Estates for a &pound;150m regeneration of Great Yarmouth&rsquo;s North Quay.<br />
The Quayside scheme would transform the waterfront site with outlet retail, leisure, a hotel, homes and new public spaces.<br />
Willmott Dixon is working with Great Yarmouth Borough Council and Rioja Estates on the long-running regeneration plan.The council has assembled the land and secured &pound;20m from the Government&rsquo;s Levelling Up Fund.At the heart of the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-joins-150m-great-yarmouth-waterfront-bid/</link><pubDate>Fri, 14 Aug 2026 08:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-joins-150m-great-yarmouth-waterfront-bid/</guid></item><item><title><![CDATA[New OBEX cavity tray makes installation easier for contractors]]></title><description><![CDATA[OBEX has launched the new RapidTray cavity tray and DPC system to help contractors and specifiers address increasing pressure around compliance, installation speed and build consistency.<br />
With tightening building safety requirements and growing programme demands, the system is designed to remove uncertainty from cavity tray installation while maintaining high standards of fire and moisture performance.<br />
The new product is a next generation addition to the wide range of construction products offere]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/new-obex-cavity-tray-makes-installation-easier-for-contractors/</link><pubDate>Fri, 14 Aug 2026 00:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/new-obex-cavity-tray-makes-installation-easier-for-contractors/</guid></item><item><title><![CDATA[Kane Group lands Edgbaston MEP deal with Sisk]]></title><description><![CDATA[Kane Group has secured a major new multi-million-pound MEP contract as part of the Sisk redevelopment of Edgbaston Stadium in Birmingham.<br />
The appointment builds on Kane&rsquo;s long-standing relationship with Sisk and reflects growing demand for the company&rsquo;s integrated approach to delivering complex quality led construction projects through digital engineering, offsite manufacturing and end-to-end project delivery.<br />
Under the contract, Kane will deliver the full mechanical and electrical i]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kane-group-lands-edgbaston-mep-deal-with-sisk/</link><pubDate>Thu, 13 Aug 2026 11:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kane-group-lands-edgbaston-mep-deal-with-sisk/</guid></item><item><title><![CDATA[Morgan Sindall lures North East director from Willmott Dixon]]></title><description><![CDATA[Morgan Sindall Construction has appointed Nick Corrigan as the new Area Director of its North East and Cumbria business.<br />
Corrigan joins from Willmott Dixon where he worked for nearly 13 years and ran the North east region.<br />
He said: &ldquo;This is a part of the world I know well and care deeply about. There&rsquo;s huge potential for growth in both the North East and in Cumbria, not least because of the renewed focus from the top levels of government on rebalancing the UK economy and supporting t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-lures-north-east-director-from-willmott-dixon/</link><pubDate>Thu, 13 Aug 2026 10:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-lures-north-east-director-from-willmott-dixon/</guid></item><item><title><![CDATA[Avant Homes seals Government fire safety payment deal]]></title><description><![CDATA[Private equity-backed Avant Homes has secured a Government-backed payment plan for its legacy building safety liabilities, easing pressure on cashflow as the house builder battles planning delays and a subdued housing market.<br />
The house builder, chaired by former Persimmon chief executive Jeff Fairburn, said the agreement with the Ministry of Housing, Communities and Local Government (MHCLG) provided important liquidity support by spreading repayments for historic fire safety works over a number]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/avant-homes-seals-government-fire-safety-payment-deal/</link><pubDate>Thu, 13 Aug 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/avant-homes-seals-government-fire-safety-payment-deal/</guid></item><item><title><![CDATA[Scaffolding firm Blencowe files administration notice]]></title><description><![CDATA[Wiltshire based specialist Blencowe Scaffolding Ltd has filed a notice of appointment to appoint an administrator.<br />
The firm has been in business for more than 60 years and is a familiar face on sites across the south of England.<br />
The family-run business was established&nbsp;in 1964 by Pat Blencowe is run from a head office in Salisbury and two depots in Basingstoke and Eastleigh.Latest accounts for Blencowe for the year to June 30 2025 show the company employed 55 staff and had plant and equipmen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scaffolding-firm-blencowe-files-administration-notice/</link><pubDate>Thu, 13 Aug 2026 09:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scaffolding-firm-blencowe-files-administration-notice/</guid></item><item><title><![CDATA[Costain predicts “step change” in financial performance]]></title><description><![CDATA[Costain is predicting a &ldquo;step change&rdquo; in its financial performance from next year as it posted another strong set of results.<br />
Alex Vaughan, Chief Executive Officer, said: &ldquo;Costain is now at a key inflection point where the strength of our growing, resilient end markets, strategic positioning with our customers and high-quality forward work position is set to deliver growth in H2 26 and a step change in our financial performance in FY 27 and beyond.&rdquo;<br />
Latest results for six]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-predicts-step-change-in-financial-performance/</link><pubDate>Thu, 13 Aug 2026 08:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-predicts-step-change-in-financial-performance/</guid></item><item><title><![CDATA[Housing groundworks crisis deepens as JAO ceases trading]]></title><description><![CDATA[Taunton-based JAO Groundworks has become the latest residential groundworks specialist to collapse as the prolonged downturn in house building continues to claim trade contractor casualties.<br />
The Somerset firm, which employed more than 100 staff and delivered more than &pound;43m of work since launching in 2019, has ceased trading with immediate effect.<br />
Founder Jake Oaten announced the closure in a statement to staff, suppliers and clients, blaming the depressed housing market, rising costs, late]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/housing-groundworks-crisis-deepens-as-jao-ceases-trading/</link><pubDate>Thu, 13 Aug 2026 08:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/housing-groundworks-crisis-deepens-as-jao-ceases-trading/</guid></item><item><title><![CDATA[Plans in for striking HSBC Canary Wharf tower revamp]]></title><description><![CDATA[Plans have been lodged to transform HSBC&rsquo;s landmark Canary Wharf headquarters in what is being billed as the world&rsquo;s largest office building transformation.<br />
Canary Wharf Group and building owner Qatar Investment Authority have submitted proposals to Tower Hamlets Council to overhaul the 45-storey tower at 8 Canada Square.<br />
The cost of the ambitious project has not been revealed but could be somewhere &pound;800m and &pound;1bn.<br />
Designed by architect Kohn Pedersen Fox, the retrofit-led]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-striking-hsbc-canary-wharf-tower-revamp/</link><pubDate>Thu, 13 Aug 2026 08:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-striking-hsbc-canary-wharf-tower-revamp/</guid></item><item><title><![CDATA[Formwork panel hits Hinkley worker after falling 29 metres]]></title><description><![CDATA[Two improvement notices served on contractors Bouygues Travaux Publics SAS and Laing O&rsquo;Rourke Delivery Limited operating as the BYLOR joint venture- have been extended following an incident at the Hinkley Point C construction site.<br />
The Office for Nuclear Regulation (ONR) served the notices in June after a formwork panel fell approximately 29 metres which left a worker with serious injuries at the site in Somerset.<br />
ONR established that BYLOR JV, in its role as contractor, failed to ensure t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/formwork-panel-hits-hinkley-worker-after-falling-29-metres/</link><pubDate>Wed, 12 Aug 2026 22:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/formwork-panel-hits-hinkley-worker-after-falling-29-metres/</guid></item><item><title><![CDATA[Structure Tone revenue almost triples to record £449m]]></title><description><![CDATA[Fit-out specialist Structure Tone nearly tripled revenue last year on the back of the London fit-out boom.<br />
The firm, owned by US-based STO Building Group, saw turnover jump to a record &pound;449m in 2025 from &pound;157m a year earlier, while profitability was restored as pre-tax profit climbed to &pound;12.6m from &pound;1.7m.<br />
Joint managing director Matt Blowers said growth was driven by strong demand across London&rsquo;s legal, technology, financial services, media and professional services]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/structure-tone-revenue-almost-triples-to-record-449m/</link><pubDate>Wed, 12 Aug 2026 09:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/structure-tone-revenue-almost-triples-to-record-449m/</guid></item><item><title><![CDATA[Focus on growing markets pays off for Balfour Beatty]]></title><description><![CDATA[Balfour Beatty&rsquo;s focus on growing markets is paying off as the contracting giant published a strong set of half year results with momentum expected to continue for the rest of 2026.<br />
Balfour said it is focused on four strategic growth markets &ndash; UK energy transition and security, UK defence, UK transport and US buildings.<br />
That strategy saw group turnover during the first half of 2026 hit &pound;5,563m from &pound;5,150m last time as pre-tax profits stayed steady at &pound;129m from &po]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/focus-on-growing-markets-pays-off-for-balfour-beatty/</link><pubDate>Wed, 12 Aug 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/focus-on-growing-markets-pays-off-for-balfour-beatty/</guid></item><item><title><![CDATA[Hill hires former Telford Homes boss]]></title><description><![CDATA[House builder Hill Group has appointed former Telford Homes group managing director John Fitzgerald to lead its Eastern Residential and Western regional businesses.<br />
The senior hire comes as Hill presses ahead with a five-year growth plan to double annual turnover to &pound;2.3bn by 2030.<br />
Fitzgerald brings more than 35 years&rsquo; experience in construction and house building.He started his career with Willmott Dixon before joining Furlong Homes and later spending more than 20 years at Telford H]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-hires-former-telford-homes-boss/</link><pubDate>Wed, 12 Aug 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-hires-former-telford-homes-boss/</guid></item><item><title><![CDATA[Ardmore directors fight to save property firms with CVA plan]]></title><description><![CDATA[Ardmore directors are attempting to save the group&rsquo;s remaining property businesses after seven companies launched company voluntary arrangement (CVA) proposals to repay creditors while continuing to trade.<br />
The proposals, overseen by business recovery specialist BTG, cover Ardmore Group Holdings, Ardmore Group, Byrne Properties, Celebration Homes, Paddington Construction, Systemhaven and Byrne Estates (Kensal Green).<br />
If approved by creditors, the CVAs will allow the companies to repay debts]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-directors-fight-to-save-property-firms-with-cva-plan/</link><pubDate>Wed, 12 Aug 2026 08:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-directors-fight-to-save-property-firms-with-cva-plan/</guid></item><item><title><![CDATA[Willmott Dixon kicks off Oldham town centre regen]]></title><description><![CDATA[Willmott Dixon has started work on the &pound;28m first phase of the Prince&rsquo;s Gate regeneration scheme in Oldham town centre.<br />
The private builder will deliver 75 affordable homes in a six-storey apartment block for regeneration specialist Muse and Oldham Council on the former car park beside the Mumps Metrolink stop.<br />
The first phase forms part of the wider Prince&rsquo;s Gate regeneration, creating a new residential gateway into the town centre.Designed to meet the Future Homes Standard, t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-kicks-off-oldham-town-centre-regen/</link><pubDate>Wed, 12 Aug 2026 07:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-kicks-off-oldham-town-centre-regen/</guid></item><item><title><![CDATA[Kier inks second Derwent London office scheme for £99m]]></title><description><![CDATA[Kier has signed off a &pound;99m deal to deliver its second major office scheme for Derwent London in the West End.<br />
The contractor will carry out the retained fa&ccedil;ade redevelopment of Holden House on the corner of Oxford Street and Rathbone Place, creating 135,000 sq ft of commercial space opposite Tottenham Court Road Elizabeth line station.<br />
The eight-storey scheme will provide 115,000 sq ft of Grade A offices alongside 20,000 sq ft of retail space fronting Oxford Street.The appointment f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-inks-second-derwent-london-office-scheme-for-99m/</link><pubDate>Wed, 12 Aug 2026 07:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-inks-second-derwent-london-office-scheme-for-99m/</guid></item><item><title><![CDATA[Investment giant acquires Phoenix ME]]></title><description><![CDATA[Investment firm H.I.G. Capital has acquired London M&amp;E specialist Phoenix ME.<br />
The deal will see Phoenix&rsquo;s CEO Lee Compton reinvest alongside H.I.G. and the company&rsquo;s existing management team will remain in place.<br />
Jim Arnold will join as Chairman, partnering with management and H.I.G. to support Phoenix&rsquo;s next phase of growth.Arnold is a former CEO at M Group Services and director at Morrison Utility Services.<br />
In its latest results Phoenix set its sights on a &pound;400m tur]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/investment-giant-acquires-phoenix-me/</link><pubDate>Tue, 11 Aug 2026 12:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/investment-giant-acquires-phoenix-me/</guid></item><item><title><![CDATA[VINCI UK profit jumps 51% after group overhaul]]></title><description><![CDATA[Strong performances from highways and civil engineering businesses helped VINCI&rsquo;s combined UK construction operations deliver a 51% hike in pre-tax profit to nearly &pound;100m last year following a major corporate restructuring.<br />
Revenue, including joint ventures, jumped nearly 20% to &pound;2.9bn in 2025 after the French-owned group brought together Eurovia, Ringway, Taylor Woodrow, VINCI Building, VINCI Facilities and newly-acquired FM Conway under the VINCI Construction Holding UK struc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vinci-uk-profit-jumps-51-after-group-overhaul/</link><pubDate>Tue, 11 Aug 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vinci-uk-profit-jumps-51-after-group-overhaul/</guid></item><item><title><![CDATA[Bellway beats build target despite weaker buyer demand]]></title><description><![CDATA[Bellway exceeded its annual completions target after a late surge in bulk sales helped lift housing output by 11% and drove a sharp improvement in cash generation despite a weaker sales market.<br />
The house builder completed 9,695 homes in the year to 31 July, ahead of its previous guidance of 9,300 to 9,500 homes.Despite being one of the few volume builders to surpass completions targets chief executive Jason Honeyman urged ministers to stimulate demand as the market continues to weaken.He called]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bellway-beats-build-target-despite-weaker-buyer-demand/</link><pubDate>Tue, 11 Aug 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bellway-beats-build-target-despite-weaker-buyer-demand/</guid></item><item><title><![CDATA[Clancy Consulting administration move sheds historic liabilities]]></title><description><![CDATA[Directors of Manchester engineering consultancy Clancy Consulting have filed a notice of intention to appoint administrators as part of a restructuring to shed historic liabilities while safeguarding its civil and structural engineering business.<br />
The move will see the firm&rsquo;s core civil and structural engineering operation transferred to newly formed CCE Ltd, a business run by the same five directors who previously led Clancy Consulting.<br />
The pre-pack style restructuring is designed to ringf]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/clancy-consulting-administration-move-sheds-historic-liabilities/</link><pubDate>Tue, 11 Aug 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/clancy-consulting-administration-move-sheds-historic-liabilities/</guid></item><item><title><![CDATA[Bricklayer breaks back after falling through roof]]></title><description><![CDATA[A Northumberland contractor has been sentenced after a bricklayer broke his back after falling through a barn roof.<br />
The 24-year-old had been part of a team working for Len Smith &amp; Son Building Contractors Limited carrying out repairs to the roof at East Fleetham Farm in Seahouses on 5 February 2025.<br />
The man stepped on a polycarbonate roof sheet and fell eight feet to the concrete floor below. He suffered two broken vertebrae in his back, as well as having a fractured sternum, that required s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bricklayer-breaks-back-after-falling-through-roof/</link><pubDate>Tue, 11 Aug 2026 08:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bricklayer-breaks-back-after-falling-through-roof/</guid></item><item><title><![CDATA[Multiplex gets start date for City Road 36-storey tower]]></title><description><![CDATA[Multiplex will start main construction works within weeks after being confirmed as main contractor at the 99 City Road scheme in central London by developer&nbsp;Endurance Land.<br />
Practical completion is targeted for 2030 on the 36-storey tower which will deliver 475,000 sq ft of commercial space.<br />
The &pound;300m scheme is located at the intersection of Old Street and the City and the build contract signing follows Multiplex&rsquo;s earlier involvement under a Pre-Construction Services Agreement.R]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/multiplex-gets-start-date-for-city-road-36-storey-tower/</link><pubDate>Mon, 10 Aug 2026 14:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/multiplex-gets-start-date-for-city-road-36-storey-tower/</guid></item><item><title><![CDATA[Trade credit insurer cuts cover for Vistry suppliers]]></title><description><![CDATA[Trade credit insurer Allianz Trade has cut the credit insurance cover it provides to suppliers of Vistry.<br />
The reduction in cover, understood to be as much as 70% for some suppliers, comes as Vistry steps up efforts to generate cash and reduce daily net debt, which stood at close to &pound;800m at the half year.<br />
Industry sources said Allianz Trade has been informing suppliers in recent weeks that it is reducing credit limits on new trading with Vistry.According to a report in the Financial Times]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/trade-credit-insurer-cuts-cover-for-vistry-suppliers/</link><pubDate>Mon, 10 Aug 2026 11:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/trade-credit-insurer-cuts-cover-for-vistry-suppliers/</guid></item><item><title><![CDATA[Trade credit insurer could cut cover for Vistry suppliers]]></title><description><![CDATA[Trade credit insurer Allianz Trade could cut the credit insurance cover it provides to suppliers of Vistry.<br />
The potential reduction in cover, understood to be as much as 70% for some suppliers, comes as Vistry steps up efforts to generate cash and reduce daily net debt, which stood at &pound;470m at the half-year.<br />
Industry sources said Allianz Trade has been informing suppliers in recent weeks that it is reducing credit limits on new trading with Vistry.According to a report in the Financial Tim]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/trade-credit-insurer-could-cut-cover-for-vistry-suppliers/</link><pubDate>Mon, 10 Aug 2026 11:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/trade-credit-insurer-could-cut-cover-for-vistry-suppliers/</guid></item><item><title><![CDATA[M&amp;E specialist ACES files administration notice]]></title><description><![CDATA[M&amp;E contractor Avon Combined Electrical Services (ACES) has filed a notice of intention to appoint administrators just a year after opening a London office to target bigger and more complex projects.<br />
The Bristol-based specialist lodged the notice at the High Court, giving the company temporary protection from creditor action.<br />
Founded in 1988 as an electrical contractor, ACES spent nearly four decades building its reputation across the South West before broadening into mechanical services, fi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mampe-specialist-aces-files-administration-notice/</link><pubDate>Mon, 10 Aug 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mampe-specialist-aces-files-administration-notice/</guid></item><item><title><![CDATA[Higgins lands Brentford estate revamp]]></title><description><![CDATA[Hounslow Council has appointed Higgins Partnerships to deliver 182 new council homes as part of the regeneration of the Charlton House and Albany House estate in Brentford.<br />
The scheme will replace 92 ageing homes with 182 new ones alongside ground-floor commercial space, providing opportunities for local businesses and services, while more than 2,500 square metres&nbsp; landscaped green space will create a more vibrant neighbourhood.<br />
Construction is expected to begin in the Autumn following exte]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/higgins-lands-brentford-estate-revamp/</link><pubDate>Mon, 10 Aug 2026 09:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/higgins-lands-brentford-estate-revamp/</guid></item><item><title><![CDATA[Portsmouth picks ECF for 2,300-home city centre regeneration]]></title><description><![CDATA[Portsmouth City Council has picked ECF as its preferred regeneration partner for the next phase of its City Centre North redevelopment.<br />
The deal could pave the way for one of the south coast&rsquo;s biggest mixed-use regeneration schemes on a large former car park site once home to the now-demolished Tricorn shopping centre in the heart of the city.<br />
The 13.25-hectare brownfield site has the potential to deliver up to 2,300 homes alongside new commercial space, leisure facilities and more than 24]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/portsmouth-picks-ecf-for-2300-home-city-centre-regeneration/</link><pubDate>Mon, 10 Aug 2026 08:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/portsmouth-picks-ecf-for-2300-home-city-centre-regeneration/</guid></item><item><title><![CDATA[Newcastle office block plan unveiled]]></title><description><![CDATA[A planning application has been submitted for an office block at the &pound;70m One Founders Place development in Newcastle.<br />
Submitted by Founders Place LLP &ndash; a joint venture between igloo and Newcastle City Council &ndash; the 185,000 sq ft, 12-storey development has been designed by architects Allford Hall Monaghan Morris.<br />
The scheme will also include one of Newcastle&rsquo;s most significant new civic spaces &ndash; Founders Square &ndash; transforming an area that currently lacks a maj]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/newcastle-office-block-plan-unveiled/</link><pubDate>Mon, 10 Aug 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/newcastle-office-block-plan-unveiled/</guid></item><item><title><![CDATA[Eric Wright to start £65m Tebay-style M56 services]]></title><description><![CDATA[Eric Wright is set to start building work shortly on a &pound;65m Tebay-style motorway services development in Cheshire that will replace the traditional fast-food model with a farm shop and kitchen showcasing local produce.<br />
The services are being developed between Junctions 7 and 8 of the M56 near Millington and Rostherne through a partnership between Westmorland, the acclaimed family-run operator behind Tebay and Gloucester Services, and the Tatton Estate.<br />
Designed by Howells, the scheme is du]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/eric-wright-to-start-65m-tebay-style-m56-services/</link><pubDate>Mon, 10 Aug 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/eric-wright-to-start-65m-tebay-style-m56-services/</guid></item><item><title><![CDATA[Eric Wright breaks ground on £65m Tebay-style M56 services]]></title><description><![CDATA[Eric Wright has started work on a &pound;65m Tebay-style motorway services development in Cheshire that will replace the traditional fast-food model with a farm shop and kitchen showcasing local produce.<br />
The services are being developed between Junctions 7 and 8 of the M56 near Millington and Rostherne through a partnership between Westmorland, the acclaimed family-run operator behind Tebay and Gloucester Services, and the Tatton Estate.<br />
Designed by Howells, the scheme is due to open in spring 2]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/eric-wright-breaks-ground-on-65m-tebay-style-m56-services/</link><pubDate>Mon, 10 Aug 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/eric-wright-breaks-ground-on-65m-tebay-style-m56-services/</guid></item><item><title><![CDATA[Plans in for retrofit of London Charing Cross office icon]]></title><description><![CDATA[Plans have gone in to retrofit one of London&rsquo;s best-known 1980s office buildings above Charing Cross Station.<br />
Developer Bridgemont wants to reinvent 1 Embankment Place rather than demolish it, retaining around 90% of the existing structure and floorplate and about 60% of the fa&ccedil;ade in one of Westminster&rsquo;s largest retrofit-first commercial schemes.<br />
Hopkins Architects has redesigned the landmark Terry Farrell building to deliver 35,000 sq m of Grade A office space while dramatic]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-retrofit-of-london-charing-cross-office-icon/</link><pubDate>Sun, 09 Aug 2026 20:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-retrofit-of-london-charing-cross-office-icon/</guid></item><item><title><![CDATA[HG seals hat-trick of Gateway 2 project approvals]]></title><description><![CDATA[HG Construction has secured Building Safety Regulator Gateway 2 approval for three major residential developments in a single month.<br />
This clears the way for work to start on projects in Bristol, Manchester and London delivering a combined 664 build-to-rent apartments and student beds.<br />
The latest approvals take the firm&rsquo;s total Gateway 2 tally to 15 since the Building Safety Act regime came into force.Three schemes approvedYork Gate, Bristol &ndash; 221 build-to-rent apartments with ground-]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hg-seals-hat-trick-of-gateway-2-project-approvals/</link><pubDate>Fri, 07 Aug 2026 09:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hg-seals-hat-trick-of-gateway-2-project-approvals/</guid></item><item><title><![CDATA[Ceiling specialist Zentia went down owing suppliers £5.6m]]></title><description><![CDATA[Acoustic ceiling manufacturer Zentia went into administration owing subcontractors and suppliers &pound;5.6m.<br />
The scale of the firms&rsquo; debts was revealed in an update from administrators filed at Companies House.<br />
Gateshead based Zentia Limited and Zentia Profiles had a combined turnover of more than &pound;50m when Interpath were appointed as administrators in June and most of the 163 staff lost their jobs.The firms were&nbsp;market leading manufacturers of complete acoustic ceiling solutio]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ceiling-specialist-zentia-went-down-owing-suppliers-56m/</link><pubDate>Fri, 07 Aug 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ceiling-specialist-zentia-went-down-owing-suppliers-56m/</guid></item><item><title><![CDATA[Plan in for 53-storey Birmingham build to rent tower]]></title><description><![CDATA[London-based Bluecastle Capital has lodged plans for a 53-storey build to rent tower that would bring 729 homes to Birmingham city centre.<br />
It would be Birmingham&rsquo;s tallest building alongside 172m-tall Curzon Wharf scheme, which secured approval three years ago but has not moved to construction.<br />
Designed by architect Squire &amp; Partners, the mixed-use scheme would be built on the long-vacant former Marks &amp; Spencer site opposite the future HS2 Curzon Street station.The 42 High Street d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plan-in-for-53-storey-birmingham-build-to-rent-tower/</link><pubDate>Fri, 07 Aug 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plan-in-for-53-storey-birmingham-build-to-rent-tower/</guid></item><item><title><![CDATA[Kier bags biggest sewage treatment job yet]]></title><description><![CDATA[Kier has landed its biggest wastewater job yet with a key role on Thames Water&rsquo;s &pound;265m Maple Lodge treatment works overhaul in Hertfordshire.<br />
The contractor has sealed an &pound;8.7m early contractor involvement deal to develop the flagship AMP8 scheme, working with Thames Water and its design team to finalise the design, manage delivery risks and prepare the project for construction.<br />
Maple Lodge Sewage Treatment Works at Maple Cross near Rickmansworth serves almost 500,000 people ac]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-bags-biggest-sewage-treatment-job-yet/</link><pubDate>Fri, 07 Aug 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-bags-biggest-sewage-treatment-job-yet/</guid></item><item><title><![CDATA[Farrans to build new Stansted skylink walkways]]></title><description><![CDATA[London Stansted has confirmed Farrans as contractor for the construction of the airport&rsquo;s new skylink walkways.<br />
The new skylinks will create walkways to directly connect the terminal to existing satellite buildings that are home to the departure and arrival gates.<br />
Their construction will enable Stansted&rsquo;s track transit people mover system to be decommissioned, creating the space for the terminal building to be extended towards the airfield in later phases of the transformation work.T]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/farrans-to-build-new-stansted-skylink-walkways/</link><pubDate>Thu, 06 Aug 2026 23:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/farrans-to-build-new-stansted-skylink-walkways/</guid></item><item><title><![CDATA[Construction buyers see first signs of a turnaround]]></title><description><![CDATA[Construction buyers saw output levels fall at the slowest rate since March last month as first signs of an industry turnaround appeared.<br />
The bellwether S&amp;P Global UK Construction Purchasing Managers&rsquo; Index was 44.7 in July, up from 38.4 in June but still below the 50 growth threshold.<br />
Much slower rates of contraction were seen in all three main sub-sectors in July. Commercial work (index at 46.8) showed the greatest resilience, while civil engineering activity again saw the steepest pa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-buyers-see-first-signs-of-a-turnaround/</link><pubDate>Thu, 06 Aug 2026 10:48:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-buyers-see-first-signs-of-a-turnaround/</guid></item><item><title><![CDATA[Mears secures £4.2bn pipeline after contract winning spree]]></title><description><![CDATA[Mears has secured more than &pound;1.4bn of housing maintenance work in the first half as its order book climbed to a record &pound;4.2bn despite profits easing during a busy period of contract mobilisations.<br />
The public sector housing maintenance specialist said it remained on track to meet full-year expectations after winning two major new clients and successfully defending a string of long-term maintenance contracts.<br />
Adjusted pre-tax profit slipped 10% to &pound;29m on revenue of &pound;560m a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mears-secures-42bn-pipeline-after-contract-winning-spree/</link><pubDate>Thu, 06 Aug 2026 10:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mears-secures-42bn-pipeline-after-contract-winning-spree/</guid></item><item><title><![CDATA[£90m bid race for iconic Foster museum revamp]]></title><description><![CDATA[The University of East Anglia is launching a &pound;90m tender race for the refurbishment of the iconic Sainsbury Centre after securing funding for the biggest overhaul of the landmark Norman Foster-designed museum since it opened nearly 50 years ago.<br />
A principal contractor will be appointed to deliver the complex scheme, which will replace the building&rsquo;s external envelope and extensively upgrade its mechanical and electrical systems to improve energy efficiency.<br />
The project follows a &pou]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/90m-bid-race-for-iconic-foster-museum-revamp/</link><pubDate>Thu, 06 Aug 2026 09:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/90m-bid-race-for-iconic-foster-museum-revamp/</guid></item><item><title><![CDATA[Persimmon sharpens axe on costs as inflation threat grows]]></title><description><![CDATA[Persimmon is stepping up a procurement and cost-cutting drive after warning inflation could add up to &pound;50m to its build costs over the next 18 months.<br />
The house builder, which increased first-half completions by 13% to 5,189 homes, said it has already identified enough procurement savings and operational efficiencies to offset at least half of the expected inflation hit, with more savings still being pursued.<br />
Chief executive Dean Finch said the group has launched a broad review covering pr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/persimmon-sharpens-axe-on-costs-as-inflation-threat-grows/</link><pubDate>Thu, 06 Aug 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/persimmon-sharpens-axe-on-costs-as-inflation-threat-grows/</guid></item><item><title><![CDATA[Panattoni submits plans for 1m sq ft Kent scheme]]></title><description><![CDATA[Developer Panattoni has submitted a hybrid planning application for a major new 1.04 million sq ft industrial and logistics development in Maidstone, Kent.<br />
The application includes detailed proposals for the first phase, comprising two units of 100,000 sq ft and 150,000 sq ft.<br />
Outline permission is also being sought for the second phase, which will provide customers with opportunities to secure flexible built-to-suit facilities tailored to their operational requirements.The 70-acre site at Lenha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/panattoni-submits-plans-for-1m-sq-ft-kent-scheme/</link><pubDate>Thu, 06 Aug 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/panattoni-submits-plans-for-1m-sq-ft-kent-scheme/</guid></item><item><title><![CDATA[Forshaw Demolition goes into administration]]></title><description><![CDATA[Bolton based Forshaw Demolition has gone into administration.<br />
The family-owned specialist has been in business since 2003 taking on packages worth up to &pound;2m across the UK.<br />
The company&rsquo;s website said its was &ldquo;competent in all aspects of demolition including residential; city centre; high rise; road &amp; rail infrastructure; industrial dismantling, we provide a fully integrated package for demolition solutions throughout the UK.&rdquo;The company is now in the hands of administr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/forshaw-demolition-goes-into-administration/</link><pubDate>Thu, 06 Aug 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/forshaw-demolition-goes-into-administration/</guid></item><item><title><![CDATA[Public work bidders face 20% jobs and skills hurdle]]></title><description><![CDATA[Contractors bidding for major government work will have to place far greater emphasis on creating jobs, raising skills and improving pay under a shake-up of Whitehall procurement rules.<br />
From 1 January 2027, firms competing for central government contracts worth more than &pound;5m will see social value account for 20% of bid scoring &ndash; double the current weighting.<br />
The new Cabinet Office Social Value Model shifts the focus away from a broad range of social measures and instead rewards contr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/public-work-bidders-face-20-jobs-and-skills-hurdle/</link><pubDate>Thu, 06 Aug 2026 08:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/public-work-bidders-face-20-jobs-and-skills-hurdle/</guid></item><item><title><![CDATA[Multiplex tops contracts league with £400m office job]]></title><description><![CDATA[Multiplex came top of last month&rsquo;s contracts rankings after securing a &pound;400m deal to build a new office tower in the City of London.<br />
The 24-storey tower, known as the Dovetail building, will provide 450,000 sq ft of office space.<br />
Murphy ranked second also with a single contract for a major infrastructure project. Its &pound;340m upgrade of Oxford Sewage Treatment Works will improve capacity by 40% and improve effluent quality that goes into the River Thames at the end of the sewage t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/multiplex-tops-contracts-league-with-400m-office-job/</link><pubDate>Thu, 06 Aug 2026 08:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/multiplex-tops-contracts-league-with-400m-office-job/</guid></item><item><title><![CDATA[Construction arm lifts Muir Group back to profit growth]]></title><description><![CDATA[Muir Group returned to stronger growth last year after its construction business more than doubled profits, helping lift group turnover nearly a third to &pound;114m.<br />
The Scottish contractor posted pre-tax profit of just over &pound;3m for the year to January 2026, up from &pound;320,000 a year earlier, while cash balances climbed from &pound;12m to &pound;21m.<br />
The turnaround was driven by Muir Construction, where turnover increased to &pound;86m and pre-tax profit jumped from &pound;2.2m to &po]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-arm-lifts-muir-group-back-to-profit-growth/</link><pubDate>Wed, 05 Aug 2026 09:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-arm-lifts-muir-group-back-to-profit-growth/</guid></item><item><title><![CDATA[Orbit unveils £1.4bn long-term housing works pipeline]]></title><description><![CDATA[Social landlord Orbit has launched one of the biggest long-term housing maintenance and new build procurements to hit the market this year.<br />
The housing association is seeking contractors for a &pound;1.4bn programme covering planned investment, remediation and major projects across its housing stock.<br />
Its programme will be divided into five regional lots covering the Midlands, East of England and South East under contracts due to start in April 2028.Orbit plans to spend &pound;1.4bn over the 15-y]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/orbit-unveils-14bn-long-term-housing-works-pipeline/</link><pubDate>Wed, 05 Aug 2026 09:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/orbit-unveils-14bn-long-term-housing-works-pipeline/</guid></item><item><title><![CDATA[Magrock lands £16m David Lloyd deal]]></title><description><![CDATA[Magrock haa been appointed main contractor to deliver a new &pound;16m David Lloyd Leisure health club at Bunford Park, Yeovil.<br />
Construction work will start this month with completion expected next summer.<br />
The club will feature a premium gym equipped with the latest fitness technology, multiple exercise studios, indoor and outdoor swimming pools, and a comprehensive wellness and spa offering. The dedicated spa retreat will include a Himalayan Salt Sauna, steam room, ice cave, plunge pool, hydrot]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/magrock-lands-16m-david-lloyd-deal/</link><pubDate>Wed, 05 Aug 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/magrock-lands-16m-david-lloyd-deal/</guid></item><item><title><![CDATA[Ibstock makes £27m loss as brick demand dives]]></title><description><![CDATA[Brick giant Ibstock made a pre-tax loss of &pound;27m during the six months to June 30 as demand for its products slumped.<br />
The loss compared to an &pound;8m profit last time as turnover fell to &pound;164m from &pound;193m.<br />
The losses came despite two price hikes during the period as production levels were reduced by 20 million units and mothballed facilities led to impairment charges of &pound;24.7m.Joe Hudson, Chief Executive Officer said: &ldquo;Ibstock delivered a solid first-half performanc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ibstock-makes-27m-loss-as-brick-demand-dives/</link><pubDate>Wed, 05 Aug 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ibstock-makes-27m-loss-as-brick-demand-dives/</guid></item><item><title><![CDATA[Yorkshire Water sounds out market for £3bn AMP9/10 plan]]></title><description><![CDATA[Yorkshire Water has launched early market engagement for a &pound;3bn infrastructure works programme spanning AMP9 and AMP10 as it prepares to reshape its long-term delivery strategy.<br />
The water company is inviting contractors and suppliers to help design the procurement model for the 10-year framework, which is expected to run from April 2028 to March 2038 with annual spending of around &pound;330m.<br />
The programme will cover a broad range of water and wastewater infrastructure work across Yorkshi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/yorkshire-water-sounds-out-market-for-3bn-amp910-plan/</link><pubDate>Wed, 05 Aug 2026 08:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/yorkshire-water-sounds-out-market-for-3bn-amp910-plan/</guid></item><item><title><![CDATA[Tribe lodges twin Greenwich student tower scheme]]></title><description><![CDATA[Developer Tribe has lodged plans for a pair of high-rise towers on the Greenwich Peninsula delivering student accommodation, co-living homes and affordable housing beside the Silvertown Tunnel.<br />
The application proposes a 27-storey block with 673 purpose-built student bedrooms alongside a 23-storey tower providing 380 co-living homes. A further 80 affordable homes are also included within the wider development.<br />
Designed by architect CJCT, the scheme occupies a vacant site on Millennium Way, immed]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tribe-lodges-twin-greenwich-student-tower-scheme/</link><pubDate>Wed, 05 Aug 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tribe-lodges-twin-greenwich-student-tower-scheme/</guid></item><item><title><![CDATA[Gatwick second runway cleared after court challenge fails]]></title><description><![CDATA[Gatwick Airport&rsquo;s &pound;2.2bn second runway expansion has cleared its final legal hurdle after the Court of Appeal dismissed a challenge against the project, paving the way for construction to begin.<br />
The government said the privately financed scheme is now on course to bring the airport&rsquo;s standby northern runway into full use from 2030, allowing up to 100,000 additional flights a year and supporting 14,000 jobs across the region.<br />
Transport secretary Heidi Alexander said the ruling e]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gatwick-second-runway-cleared-after-court-challenge-fails/</link><pubDate>Tue, 04 Aug 2026 20:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gatwick-second-runway-cleared-after-court-challenge-fails/</guid></item><item><title><![CDATA[More subcontractors wanted across London]]></title><description><![CDATA[Constructionline is planning a second networking event for subcontractors across London.<br />
A host of work opportunities will be up for grabs at the latest Marketplace Live event for the North London region on Wednesday 9th September 2026.<br />
It will bring businesses together from across London, the South East, and Anglia regions at StoneX Stadium, Saracens, where Tier 1 and Tier 2 contractors will be looking to connect with pre-qualified subcontractors and suppliers to discuss upcoming work opportuni]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/more-subcontractors-wanted-across-london/</link><pubDate>Tue, 04 Aug 2026 09:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/more-subcontractors-wanted-across-london/</guid></item><item><title><![CDATA[GMI lands £21m Nuneaton library and business hub job]]></title><description><![CDATA[GMI Construction is set to secure a &pound;21m contract to build a new library and business centre in Nuneaton after seeing off competition from Clegg Construction, McLaren Construction and McPhillips (Wellington).<br />
Warwickshire County Council selected the Leeds-based contractor for the design and build scheme, which forms a key part of the wider Transforming Nuneaton regeneration programme.<br />
Work is expected to start later this month after the standstill period ends.The project will transform the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gmi-lands-21m-nuneaton-library-and-business-hub-job/</link><pubDate>Tue, 04 Aug 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gmi-lands-21m-nuneaton-library-and-business-hub-job/</guid></item><item><title><![CDATA[SIG racks-up another £21m loss]]></title><description><![CDATA[Building materials distribution giant SIG made a pre-tax loss of &pound;21.6m in the six months to June 30 2026.<br />
It was an improvement on last time when losses were &pound;33.1m as turnover dipped to &pound;1.29bn from &pound;1.3bn.<br />
SIG bosses are braced for tough market conditions to continue this year &ldquo;and possibly throughout 2027.&rdquo;The company is accelerating is efficiency drive which is expected to save &pound;100m by the end of next year as underperforming businesses will be clos]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sig-racks-up-another-21m-loss/</link><pubDate>Tue, 04 Aug 2026 08:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sig-racks-up-another-21m-loss/</guid></item><item><title><![CDATA[Swindon groundworks firm files administration notice]]></title><description><![CDATA[House building groundworks specialist Avtar Construction has filed a notice of intention to appoint an administrator.<br />
The Swindon-based civils and groundworks specialist has worked for regional offices of major house builders like Vistry, Persimmon and BarrattRedrow turning over around &pound;20m last year.<br />
The firm, which was set up 16 years ago, works across the south west and employed around 60 staff last year.<br />
Avtar is one of only a few civil engineering contractors in the South West with th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/swindon-groundworks-firm-files-administration-notice/</link><pubDate>Tue, 04 Aug 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/swindon-groundworks-firm-files-administration-notice/</guid></item><item><title><![CDATA[Formation wins Gateway 2 for Hyde Greenwich homes]]></title><description><![CDATA[Wembley contractor Formation Design and Build has secured Gateway 2 approval with housing association Hyde for a 182-home affordable housing scheme at Charlton Riverside in Greenwich.<br />
The Eastmoor Street project is the first Hyde-led development within the wider Charlton Riverside Opportunity Area, where the housing association has consent to build around 1,200 homes alongside new public spaces, commercial uses and improved access to the Thames Path.<br />
Approval of the housing scheme near the Thame]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/formation-wins-gateway-2-for-hyde-greenwich-homes/</link><pubDate>Tue, 04 Aug 2026 08:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/formation-wins-gateway-2-for-hyde-greenwich-homes/</guid></item><item><title><![CDATA[GRAHAM wins final contract on £323m Didcot roads upgrade]]></title><description><![CDATA[Oxfordshire County Council has appointed GRAHAM to deliver the Didcot to Culham River crossing section of the &pound;323m Didcot and surrounding areas major infrastructure (HIF1) scheme.<br />
It is the third and final construction contract to be awarded for this scheme where VolerFitzpatrick and AECOM have also landed deasl<br />
The Didcot to Culham River Crossing includes a new 3.6km single carriageway road between the A4130 at the existing Collett roundabout junction in Didcot and the A415 at Culham.It]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-wins-final-contract-on-323m-didcot-roads-upgrade/</link><pubDate>Mon, 03 Aug 2026 15:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-wins-final-contract-on-323m-didcot-roads-upgrade/</guid></item><item><title><![CDATA[Vistry go-ahead for 300 affordable homes by North Mid hospital]]></title><description><![CDATA[Vistry has secured planning backing for a scheme of over 300 affordable homes on land next to North Middlesex University Hospital in Edmonton.<br />
Enfield Council unanimously resolved to grant planning permission for the partnership-led development, which will now progress to completion of a Section 106 agreement before work is expected to start later this year.<br />
The scheme will deliver 152 social rent homes and 154 intermediate affordable homes, including key worker housing for eligible hospital sta]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-go-ahead-for-300-affordable-homes-by-north-mid-hospital/</link><pubDate>Mon, 03 Aug 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-go-ahead-for-300-affordable-homes-by-north-mid-hospital/</guid></item><item><title><![CDATA[BW reshapes leadership team after CEO handover]]></title><description><![CDATA[Employee-owned fit out specialist BW has reshuffled its senior leadership team following Anthony Brown&rsquo;s promotion to chief executive as it prepares for its next phase of growth.<br />
The move comes weeks after long-serving chief executive Steve Elliott stepped down following 12 years at the helm, handing over to former chief marketing officer Brown at the end of July.<br />
As part of the new structure, Peter Nagle has been promoted to chief operating officer, taking responsibility for project deliv]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bw-reshapes-leadership-team-after-ceo-handover/</link><pubDate>Mon, 03 Aug 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bw-reshapes-leadership-team-after-ceo-handover/</guid></item><item><title><![CDATA[Kori to convert Chiswick police station into care home]]></title><description><![CDATA[Kori Construction is set to start work next month on its latest contract to convert the site of a former police station on Chiswick High Road into a new fifty-unit extra care retirement living community.<br />
The latest job for client Birchgrove is due for completion by the end of 2028.<br />
The scheme has been designed to serve the wider community as well as its residents. A ground floor space will be available for local groups, charities and individuals to hire, doubling as a venue for police resident m]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kori-to-convert-chiswick-police-station-into-care-home/</link><pubDate>Mon, 03 Aug 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kori-to-convert-chiswick-police-station-into-care-home/</guid></item><item><title><![CDATA[London office scheme switched to 530 co-living homes]]></title><description><![CDATA[A vacant Wimbledon office block is set to make way for a landmark mixed-use tower after fresh plans were submitted to replace a consented unbuilt office scheme with more than 530 co-living homes.<br />
Developer Re:shape wants to demolish the seven-storey St George&rsquo;s House East opposite Wimbledon station and build a 13-storey scheme designed by PLP Architecture.<br />
The project would deliver 532 shared living studios alongside 36 social rented family homes, plus 2,271 sq m of Grade A workspace and a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-office-scheme-switched-to-530-co-living-homes/</link><pubDate>Mon, 03 Aug 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-office-scheme-switched-to-530-co-living-homes/</guid></item><item><title><![CDATA[Taziker turnaround gathers pace on CP7 rail boost]]></title><description><![CDATA[Specialist engineering contractor Taziker Industrial has returned to full profitability two year after original founders secured a buyback from private equity investors.<br />
The Chorley-based specialist contractor increased pre-tax profit from continuing operations by almost a quarter to &pound;4.8m in the year to 31 March 2026 as revenue rose 7% to a record &pound;88m.The latest results continue the recovery that began after founders Thomas Taziker, Nigel Taziker and Graham Moor bought back control]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/taziker-turnaround-gathers-pace-on-cp7-rail-boost/</link><pubDate>Mon, 03 Aug 2026 08:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/taziker-turnaround-gathers-pace-on-cp7-rail-boost/</guid></item><item><title><![CDATA[HS2 renegotiates contracts with construction giants]]></title><description><![CDATA[HS2 Ltd has successfully renegotiated contracts with two of the civil engineering joint-ventures building the route.<br />
New commercial contracts have been signed with EKFB and Align which collectively account for more than 100km of HS2 between London and the West Midlands.<br />
The new deals &ldquo;reset incentives by rewarding efficient delivery and cost control through a revised payment structure with contractors, ensuring&#8239;they&#8239;are incentivised to deliver on budget and on time.&rdquo;Previ]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-renegotiates-contracts-with-construction-giants/</link><pubDate>Fri, 31 Jul 2026 12:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-renegotiates-contracts-with-construction-giants/</guid></item><item><title><![CDATA[Rayner waves through £500m London Truman Brewery plan]]></title><description><![CDATA[Housing secretary Angela Rayner has approved the controversial &pound;500m redevelopment of the Truman Brewery estate in east London.<br />
The decision clears the way for a major mixed -use scheme including offices, a data centre, cinema and new public spaces despite fierce opposition from Tower Hamlets Council and local campaigners.<br />
The project, promoted by Truman Estates and Zeloof LLP, will transform three sites around Brick Lane through separate planning applications.Plans include five new buildi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rayner-waves-through-500m-london-truman-brewery-plan/</link><pubDate>Fri, 31 Jul 2026 09:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rayner-waves-through-500m-london-truman-brewery-plan/</guid></item><item><title><![CDATA[Taylor Wimpey slashes dividend policy as cash pile halves]]></title><description><![CDATA[Taylor Wimpey has slashed its shareholder payouts policy after a prolonged housing market downturn eroded profits and almost halved its cash pile.<br />
The house builder has cut its annual distribution policy from its previous level of 7.5% to 4% of net assets, saying the move is needed to preserve balance sheet strength and financial flexibility as weaker market conditions continue.<br />
Half-year results showed net cash fell 48% to &pound;169m from &pound;327m a year earlier, while adjusted operating pr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/taylor-wimpey-slashes-dividend-policy-as-cash-pile-halves/</link><pubDate>Fri, 31 Jul 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/taylor-wimpey-slashes-dividend-policy-as-cash-pile-halves/</guid></item><item><title><![CDATA[Construction confidence jumps to highest level this year]]></title><description><![CDATA[Construction firms turned sharply more upbeat in July as stronger customer demand and improving financial conditions lifted confidence to its highest level in more than a year.<br />
The latest Lloyds Business Barometer published today showed overall confidence in the sector jumped 10 points to 56%, well above the 12-month average of 47%.<br />
More than two thirds of industry firms now expect business activity to increase over the next year, with 65% planning to take on more staff, up from 55% in June.Conf]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-confidence-jumps-to-highest-level-this-year/</link><pubDate>Fri, 31 Jul 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-confidence-jumps-to-highest-level-this-year/</guid></item><item><title><![CDATA[Worker hit by 100kg beam while taking down steel frame]]></title><description><![CDATA[An event structure company and its director have been fined after an employee suffered severe injuries after being hit by a steel beam while dismantling an internal steel frame.<br />
iSkate Limited employee, Natalie McCreith, 38, a former outdoor sports instructor, had worked for the company for 14 years when she was seriously injured while working at Beaverbrook Hotel &amp; Golf Course Leatherhead, Surrey, on 26 June 2024.<br />
McCreith underwent an 11-hour operation, spent three months in hospital and s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-hit-by-100kg-beam-while-taking-down-steel-frame/</link><pubDate>Fri, 31 Jul 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-hit-by-100kg-beam-while-taking-down-steel-frame/</guid></item><item><title><![CDATA[Tonroe Group breaks £1bn barrier on data centre boom]]></title><description><![CDATA[Technical contracting specialist Tonroe Group smashed through the &pound;1bn turnover mark last year as a surge in hyperscale data centre work across Europe and strong UK trading delivered record results.<br />
The Gerrards Cross headquartered group lifted revenue 27% to &pound;1.19bn in 2025 while pre-tax profit climbed 15% to &pound;48m, driven by rapid expansion of its international data centre business.<br />
Jackie Wild, Group CEO said: &ldquo;2025 was a year of strong growth across the Group, driven b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tonroe-group-breaks-1bn-barrier-on-data-centre-boom/</link><pubDate>Thu, 30 Jul 2026 21:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tonroe-group-breaks-1bn-barrier-on-data-centre-boom/</guid></item><item><title><![CDATA[NHS signs eleven new hospital construction deals]]></title><description><![CDATA[Eleven contracts have now been signed to deliver new hospitals across England.<br />
The deals bring together NHS trusts and leading contractors to deliver 11 schemes through a new collaborative approach designed to build modern hospitals more efficiently.<br />
The partnerships will support the delivery of Hospital 2.0 &ndash; the New Hospital Programme&rsquo;s modern, standardised approach to designing, building, and operating hospitals.Combining national standards, digital innovation and modern methods o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/nhs-signs-eleven-new-hospital-construction-deals/</link><pubDate>Thu, 30 Jul 2026 15:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/nhs-signs-eleven-new-hospital-construction-deals/</guid></item><item><title><![CDATA[TCC supports £22m industrial scheme]]></title><description><![CDATA[Work is beginning on a major multi-unit industrial development in Walsall with the help of a leading Midlands construction consultancy.<br />
The &pound;22 million Central Point development in Willenhall Road, close to Junction 10 of the M6, will provide almost 100,000 sq ft of modern industrial space across six units. Birmingham-based The Construction Consultants (TCC) have been appointed as project managers, quantity surveyors and employers agents to oversee the project on behalf of the Henley-in-Ar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tcc-supports-22m-industrial-scheme/</link><pubDate>Thu, 30 Jul 2026 14:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tcc-supports-22m-industrial-scheme/</guid></item><item><title><![CDATA[Contractors offered free AI PPE detection trial]]></title><description><![CDATA[Construction security and monitoring specialist VIS Systems has launched Proof on Site &ndash; a campaign built on the idea that AI PPE detection should be judged on evidence from a contractor&rsquo;s own site rather than on a supplier&rsquo;s demonstration.<br />
Under the campaign, main contractors and their project teams can deploy the company&rsquo;s VISion AI platform on one live, active site for 30 days at no cost, and assess it on the safety breaches it identifies and the critical compliance da]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-offered-free-ai-ppe-detection-trial/</link><pubDate>Thu, 30 Jul 2026 13:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-offered-free-ai-ppe-detection-trial/</guid></item><item><title><![CDATA[BAM UK first half profits jump as civils delivers]]></title><description><![CDATA[Civil engineering business drove a sharp rise in first-half profits at BAM&rsquo;s UK construction business as claim settlements and stronger project delivery lifted earnings.<br />
Civil Engineering UK increased EBITDA by nearly half to &pound;59m despite revenue easing 1% to &pound;780m, lifting operating margin to 7.6%, up from 5.1% in the same period last year.<br />
BAM said the performance was supported by claim settlements and a high quality order book focused on rail and energy transition projects.T]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bam-uk-first-half-profits-jump-as-civils-delivers/</link><pubDate>Thu, 30 Jul 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bam-uk-first-half-profits-jump-as-civils-delivers/</guid></item><item><title><![CDATA[Acquisitions pay-off for United Infrastructure]]></title><description><![CDATA[A string of acquisitions and getting out of the new homes market has allowed United Infrastructure Group to post a strong set of results.<br />
The company&nbsp;operates in the support services sector, providing essential services to the owners and operators of UK critical utility and social infrastructure assets.<br />
Results for the year ended 31 March 2026 show revenue up to &pound;845.8m from &pound;718.2m while pre-tax profit from continuing operations increased to &pound;49.6m from &pound;38.4m.Durin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/acquisitions-pay-off-for-united-infrastructure/</link><pubDate>Thu, 30 Jul 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/acquisitions-pay-off-for-united-infrastructure/</guid></item><item><title><![CDATA[US private equity firm swoops for Avove]]></title><description><![CDATA[US private equity giant H.I.G. Capital has bought fast-growing utilities contractor Avove, betting on a surge in UK spending on water and power infrastructure.<br />
The Chorley-based contractor, which employs more than 800 people, has enjoyed strong growth since being carved out of Amey Utilities by UK-based private investor Rubicon Partners in 2022 and rebranded as Avove.<br />
Latest accounts show revenue climbed to &pound;227m in the year to 31 December 2025 from &pound;216m, while pre-tax profit jumped]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/us-private-equity-firm-swoops-for-avove/</link><pubDate>Thu, 30 Jul 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/us-private-equity-firm-swoops-for-avove/</guid></item><item><title><![CDATA[Watkin Jones turnaround gathers pace on retrofit surge]]></title><description><![CDATA[Watkin Jones has landed &pound;60m of new contracts as demand for student housing retrofit and fire safety work accelerates.<br />
The residential developer and manager has signed six contracts during the second half of its financial year to date, including five through its Refresh division delivering remediation, fire safety, refurbishment and asset improvement works to existing purpose built student accommodation schemes.The jobs cover buildings of 1,750 student beds in Birmingham, Edinburgh, Newcas]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-turnaround-gathers-pace-on-retrofit-surge/</link><pubDate>Thu, 30 Jul 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-turnaround-gathers-pace-on-retrofit-surge/</guid></item><item><title><![CDATA[Nationwide Hire Solutions bought out of administration]]></title><description><![CDATA[Nationwide Hire Solutions has been acquired after going into administration this week.<br />
The hire company&rsquo;s trading entity Nationwide Hire Ltd went into administration on July 28.<br />
Suppliers subsequently received messages &ndash; shared with the Enquirer &ndash; informing them that the business has been acquired by Alliance Hire Solutions Ltd which is part of the Alliance Tool Hire Group.The update said the business will now be owned by Alliance Hire Solutions Ltd but continue trading as Nati]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/nationwide-hire-solutions-bought-out-of-administration/</link><pubDate>Thu, 30 Jul 2026 08:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/nationwide-hire-solutions-bought-out-of-administration/</guid></item><item><title><![CDATA[Torsion Construction goes into administration]]></title><description><![CDATA[Torsion Construction has lost its fight for survival with the contractor officially placed into administration on Tuesday and Interpath now running the company.<br />
Directors at the &pound;165m turnover business had been exploring options to save the firm but were sunk by trading conditions across construction.<br />
The Enquirer understands Torsion has been working to secure direct payments to subcontractors to minimise the supply chain hit.The construction arm was working on 12 live sites and is working]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/torsion-construction-goes-into-administration/</link><pubDate>Wed, 29 Jul 2026 13:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/torsion-construction-goes-into-administration/</guid></item><item><title><![CDATA[Lovell wins job to rebuild Ilke Homes condemned estate]]></title><description><![CDATA[Lovell Partnerships has landed a &pound;53m deal to rebuild the Southend housing scheme abandoned after the collapse of modular housebuilder Ilke Homes.<br />
The Guinness Partnership was forced to tear down the half-built 131-home Meadow Grange development after inspections concluded the modular homes could not be salvaged. Construction had stalled when Ilke Homes went into administration in June 2023.<br />
Lovell will now deliver a completely new scheme, with work starting on 7 August and completion sche]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lovell-wins-job-to-rebuild-ilke-homes-condemned-estate/</link><pubDate>Wed, 29 Jul 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lovell-wins-job-to-rebuild-ilke-homes-condemned-estate/</guid></item><item><title><![CDATA[Equipment hire firm files administration notice]]></title><description><![CDATA[Construction equipment hire specialist Nationwide Hire has filed a notice of intention to appoint administrators.<br />
Latest accounts for the Hampshire based business show a turnover of &pound;11m for the year to September 2024 generating a pre-tax loss of &pound;1m while employing 55 staff.<br />
The company has been in business since 1995 and works with more than 900 suppliers providing kit for sites across the country.Nationwide Hire&rsquo;s website describes the firm as: &ldquo;The UK&rsquo;s original]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/equipment-hire-firm-files-administration-notice/</link><pubDate>Wed, 29 Jul 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/equipment-hire-firm-files-administration-notice/</guid></item><item><title><![CDATA[Billington names new boss for structures business]]></title><description><![CDATA[Steelwork contractor Billington has promoted Dan Duffield to managing director of its main structural steel business as part of a senior leadership reshuffle to drive the group&rsquo;s next phase of growth.<br />
Duffield will take charge of Billington Structures from 1 August, succeeding Kevin Campbell, who moves into the newly-created role of group strategic and special projects director.<br />
(L-r) Campbell to become group special projects director and Duffield promoted to MD of Billington Structures<br />
Ca]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/billington-names-new-boss-for-structures-business/</link><pubDate>Wed, 29 Jul 2026 08:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/billington-names-new-boss-for-structures-business/</guid></item><item><title><![CDATA[Contractor fined after desperate bats attack tenant]]></title><description><![CDATA[A contractor has been fined after a large number of bats were killed as a result of building work at a sheltered housing site where the survivors attacked a tenant.<br />
The victim was admitted to hospital with bite wounds after more than 150 bats flew into his living quarters and bedroom from the house&rsquo;s roof structure&nbsp;where they had been trapped.<br />
When ecology experts examined the property in&nbsp;Lochmaben, Dumfriesshire, they&nbsp;identified&nbsp;the animals as Soprano Pipistrelle bats]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractor-fined-after-desperate-bats-attack-tenant/</link><pubDate>Wed, 29 Jul 2026 00:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractor-fined-after-desperate-bats-attack-tenant/</guid></item><item><title><![CDATA[Equans back in black after costly new-build housing exit]]></title><description><![CDATA[Equans Regeneration has returned to profit after two painful years of restructuring as the cost of quitting mainstream house building finally began to fade.<br />
The Bouygues-owned contractor posted a pre-tax profit of &pound;3.8m for 2025, reversing last year&rsquo;s &pound;29m loss after slashing one-off restructuring and legacy new build costs from &pound;50m to &pound;17m.<br />
Turnover fell 17% to &pound;650m as the business completed its retreat from loss-making construction markets, but the underly]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/equans-back-in-black-after-costly-new-build-housing-exit/</link><pubDate>Tue, 28 Jul 2026 21:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/equans-back-in-black-after-costly-new-build-housing-exit/</guid></item><item><title><![CDATA[Multiplex signs main works for £200m Derwent Baker Street job]]></title><description><![CDATA[Multiplex has sealed the main works contract to deliver Derwent London&rsquo;s flagship 50 Baker Street mixed-use development in Marylebone.<br />
The firm has spent the past year working alongside the developer under a pre-construction services agreement to refine the engineering and delivery strategy for the &pound;200m scheme.<br />
Confirmation of the main works contract paves the way for work to start next year, following completion of demolition and enabling works by McGee.Designed by AHMM, the 236,00]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/multiplex-signs-main-works-for-200m-derwent-baker-street-job/</link><pubDate>Tue, 28 Jul 2026 19:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/multiplex-signs-main-works-for-200m-derwent-baker-street-job/</guid></item><item><title><![CDATA[London house building stirs as national starts slide again]]></title><description><![CDATA[London&rsquo;s house building market is showing its first meaningful signs of life after a prolonged slump, despite developers cutting back new home starts across the UK.<br />
Latest NHBC figures show new home registrations in the capital surged 170% in the second quarter, climbing from just 896 homes a year ago to 2,417.While the rebound comes from an exceptionally low base, it suggests the easing of Building Safety Regulator Gateway 2 approval bottlenecks is finally beginning to feed through into c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-house-building-stirs-as-national-starts-slide-again/</link><pubDate>Tue, 28 Jul 2026 10:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-house-building-stirs-as-national-starts-slide-again/</guid></item><item><title><![CDATA[Burnham vows to value “hard hat as much as graduation cap”]]></title><description><![CDATA[Prime Minister Andy Burnham will launch a fundamental change to the education system today in a bid to put technical education on an equal footing with the traditional academic path.<br />
In a message to students, he will say &ldquo;whether you choose construction, coding or classics, you&rsquo;ll get the skills you need and be given the respect you deserve.&rdquo;<br />
From age 14 (Year 10), students will have the chance to combine core academic subjects &ndash; including English, maths and science &ndas]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/burnham-vows-to-value-hard-hat-as-much-as-graduation-cap/</link><pubDate>Tue, 28 Jul 2026 09:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/burnham-vows-to-value-hard-hat-as-much-as-graduation-cap/</guid></item><item><title><![CDATA[JN Bentley warns water sector heading for capacity crunch]]></title><description><![CDATA[Water engineering specialist JN Bentley has warned the biggest investment cycle in the sector&rsquo;s history risks running into labour shortages and capacity constraints as AMP8 projects gather pace.<br />
The Mott MacDonald-owned contractor delivered one of its strongest trading performances in recent years, lifting operating margin to 4.8% from 3.7% in the year to December 2025.<br />
Pre-tax profit surged over a third to &pound;26m on revenue up 5% to &pound;534m.<br />
The business also expanded its workforc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jn-bentley-warns-water-sector-heading-for-capacity-crunch/</link><pubDate>Tue, 28 Jul 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jn-bentley-warns-water-sector-heading-for-capacity-crunch/</guid></item><item><title><![CDATA[HG Construction go-ahead for Manchester student rooms]]></title><description><![CDATA[HG Construction has secured Gateway 2 approval to start work on a 239-bed purpose built student accommodation scheme in Manchester for Singapore developer Far East Orchard.<br />
The Plymouth Grove development will be the developer&rsquo;s first Manchester project.<br />
The scheme will deliver 239 student rooms on a site close to both the University of Manchester and Manchester Metropolitan University. Completion is targeted for 2028.HG Construction is working alongside development manager DML Group, with]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hg-construction-go-ahead-for-manchester-student-rooms/</link><pubDate>Tue, 28 Jul 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hg-construction-go-ahead-for-manchester-student-rooms/</guid></item><item><title><![CDATA[Build costs choke off new student housing pipeline]]></title><description><![CDATA[Britain&rsquo;s biggest student accommodation developer has warned new purpose-built student housing will slow sharply over the next two to three years because soaring construction costs have made most schemes financially unviable.<br />
Unite Group chief executive Joe Lister said higher build costs, tighter regulation and weaker investment values meant new projects no longer stacked up in most regional markets, with developers now needing rents above &pound;300 a week to justify construction outside]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/build-costs-choke-off-new-student-housing-pipeline/</link><pubDate>Tue, 28 Jul 2026 08:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/build-costs-choke-off-new-student-housing-pipeline/</guid></item><item><title><![CDATA[Brick sales slide at Forterra set to continue]]></title><description><![CDATA[Turnover at materials giant Forterra slumped by 13.5% during the first half of this year with no expectation of a bounce-back during the rest of this year.<br />
Latest results for the six months to June 30 2026 show revenue down to &pound;168.8m from &pound;195.1m last time.<br />
But pre-tax profits were up to &pound;11.5m from &pound;8.4m as the company introduced a cost efficiency programme across its factories and a &ldquo;low single digit&rdquo; price increase stuck across the market.Forterra said it]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/brick-sales-slide-at-forterra-set-to-continue/</link><pubDate>Tue, 28 Jul 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/brick-sales-slide-at-forterra-set-to-continue/</guid></item><item><title><![CDATA[Sunderland film studio project closes in on build start]]></title><description><![CDATA[Construction of Sunderland&rsquo;s flagship Crown Works film studios could start this autumn after final plans for the first phase were submitted for approval.<br />
The revised application, lodged with Sunderland City Council, sets out the detailed design for Studio One, the opening phase of the 31 hectare Crown Works Growth Zone regeneration on the south bank of the River Wear.<br />
The revised application follows a major rethink of the project after original private backers Cain International and Fulwel]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sunderland-film-studio-project-closes-in-on-build-start/</link><pubDate>Tue, 28 Jul 2026 07:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sunderland-film-studio-project-closes-in-on-build-start/</guid></item><item><title><![CDATA[Pagabo starts race for £1.5bn medium works deal]]></title><description><![CDATA[Procurement specialist Pagabo is set to issue an invitation to tender for the new National Framework for Medium Works will on September 1 2026.<br />
The framework managed by Pagabo on behalf of The Education Alliance (TEAL) will run for a four-year period from January 2027 and have an anticipated total value of &pound;1.5bn.<br />
It is the third generation of the Medium Works framework managed by Pagabo, covering projects between &pound;0k and &pound;15m in value, with previous versions delivering a proje]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pagabo-starts-race-for-15bn-medium-works-deal/</link><pubDate>Mon, 27 Jul 2026 16:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pagabo-starts-race-for-15bn-medium-works-deal/</guid></item><item><title><![CDATA[Kier lands £98m double school build boost]]></title><description><![CDATA[Kier has signed as main works contractor for a brace of school rebuilds worth nearly &pound;100m, including a flagship low carbon GenZero academy in Lancashire and a replacement school for the RAAC-hit Anglo European School in Essex.<br />
The contractor will deliver the &pound;45m Wellfield Academy in Leyland, Lancashire, alongside the &pound;53m redevelopment of the Anglo European School in Ingatestone, Essex.<br />
The Lancashire job will see Kier build a new 6,540 sq m secondary school as one of the DfE]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-98m-double-school-build-boost/</link><pubDate>Mon, 27 Jul 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-98m-double-school-build-boost/</guid></item><item><title><![CDATA[Burnham urged to help construction supply chain costs]]></title><description><![CDATA[Leaders of the Construction Products Association are urging Andy Burnham to prioritise cost-cutting measures for industry supply chains following a gloomy set of forecasts.<br />
The CPA&rsquo;s forecast for construction output has been downgraded further in its Summer numbers due to the lagged impacts of the Middle East conflict that are starting to pass through to both the demand and cost sides of the UK economy.<br />
Construction output year-to-date so far in 2026 has already fallen by 1.6%, according t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/burnham-urged-to-help-construction-supply-chain-costs/</link><pubDate>Mon, 27 Jul 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/burnham-urged-to-help-construction-supply-chain-costs/</guid></item><item><title><![CDATA[VolkerWessels UK cracks 4% margin milestone]]></title><description><![CDATA[VolkerWessels UK has delivered one of its strongest profit performances in recent years after a disciplined focus on higher-margin work lifted returns despite virtually flat turnover.<br />
The infrastructure group, whose UK businesses include VolkerFitzpatrick, VolkerRail, VolkerStevin, VolkerHighways and VolkerLaser, saw pre-tax profit surge 47% to &pound;70.5m as revenue remained flat at &pound;1.49bn.<br />
Operating profit jumped 50% to &pound;66m, driving the group&rsquo;s operating margin up from 3.0]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/volkerwessels-uk-cracks-4-margin-milestone/</link><pubDate>Mon, 27 Jul 2026 08:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/volkerwessels-uk-cracks-4-margin-milestone/</guid></item><item><title><![CDATA[Merseyrail backs regional builders in framework shake-up]]></title><description><![CDATA[Merseyrail has unveiled an 11-strong line-up of contractors for a new seven-year construction framework that reserves all projects worth up to &pound;1.5m for SMEs while bringing in tier one contractors for higher-value work.<br />
Merseyrail has divided the framework into three value bands. Regional firms Frank Rogers Building Contractor, MPH Construction, Simon Dean Electrical, SIS Projects and Vallum Projects secured places on the SME-only band.Package value<br />
Contractors<br />
Over &pound;2.5m<br />
Amalgamated]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/merseyrail-backs-regional-builders-in-framework-shake-up/</link><pubDate>Mon, 27 Jul 2026 08:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/merseyrail-backs-regional-builders-in-framework-shake-up/</guid></item><item><title><![CDATA[Green light for Morgan Sindall revamp of Crystal Palace]]></title><description><![CDATA[Planning approval has been granted for the redevelopment of the Crystal Palace National Sports Centre with main contractor Morgan Sindall set to start on site by the end of this year.<br />
Renovation work will bring the 15-hectare site up to a modern standard while showcasing its heritage and historic features.<br />
The project will see the centre&rsquo;s facilities enhanced to support sports from the grassroots up to elite level.Richard Dobson, Area Director for Morgan Sindall in London, said: &ldquo;We]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-morgan-sindall-revamp-of-crystal-palace/</link><pubDate>Fri, 24 Jul 2026 16:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-morgan-sindall-revamp-of-crystal-palace/</guid></item><item><title><![CDATA[Arcadis knocks back second bid offer from WSP]]></title><description><![CDATA[Arcadis has rebuffed a second takeover approach from Canadian engineering giant WSP today, insisting an improved &euro;51.5-a-share proposal still falls well short of the consultant&rsquo;s true value.<br />
The Dutch design and engineering group confirmed WSP returned with a revised indicative offer after an initial &euro;48.5-a-share approach, first revealed yesterday, was unanimously rejected by Arcadis&rsquo; executive and supervisory boards.<br />
The latest proposal, comprising cash and WSP shares, va]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/arcadis-knocks-back-second-bid-offer-from-wsp/</link><pubDate>Fri, 24 Jul 2026 09:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/arcadis-knocks-back-second-bid-offer-from-wsp/</guid></item><item><title><![CDATA[Battle starts for places in £8bn national roads upkeep shake-up]]></title><description><![CDATA[Britain&rsquo;s biggest highways contractors are gearing up for a fight over seven regional contracts as National Highways resets its approach to strategic roads upkeep.<br />
An invitation to tender for spots on the long-awited &pound;8bn Maintenance and Response 2 framework will go out next month paving the way for a major overhaul of how England&rsquo;s 4,500-mile strategic road network is maintained.<br />
The reset will see the current 10 maintenance contracts replaced as they expire from July 2028. Fi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/battle-starts-for-places-in-8bn-national-roads-upkeep-shake-up/</link><pubDate>Fri, 24 Jul 2026 09:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/battle-starts-for-places-in-8bn-national-roads-upkeep-shake-up/</guid></item><item><title><![CDATA[Tier ones called up for £500m building safety framework]]></title><description><![CDATA[Newcastle-based procurement body Prosper has launched the race for places on a new &pound;500m national framework to deliver building safety remediation work.<br />
The four-year agreement is built around turnkey delivery, with a standalone principal contractor taking responsibility for complete projects from surveys through to passive and active fire safety works.<br />
Alongside the flagship principal contractor lot, Prosper is also seeking suppliers for specialist packages covering:Building safety consul]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tier-ones-called-up-for-500m-building-safety-framework/</link><pubDate>Fri, 24 Jul 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tier-ones-called-up-for-500m-building-safety-framework/</guid></item><item><title><![CDATA[Crown Estate pushes ahead with £2bn Cambridge science hub]]></title><description><![CDATA[The Crown Estate has lodged plans for a &pound;2bn overhaul of Cambridge Business Park, paving the way for one of the UK&rsquo;s biggest science-led regeneration schemes.<br />
The project will create up to 1.8m sq ft of laboratories, offices and R&amp;D space alongside 500 homes in the emerging North East Cambridge Innovation District.<br />
The application forms part of The Crown Estate&rsquo;s wider ambition to invest up to &pound;1.5bn in UK science, innovation and technology.<br />
Commercial buildings of up]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/crown-estate-pushes-ahead-with-2bn-cambridge-science-hub/</link><pubDate>Fri, 24 Jul 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/crown-estate-pushes-ahead-with-2bn-cambridge-science-hub/</guid></item><item><title><![CDATA[Worker falls from tipping bucket on fork lift]]></title><description><![CDATA[A refurbishment contractor has been fined &pound;90,000 after a man was left &lsquo;physically ruined&rsquo; after falling from a tipping bucket on a fork lift truck in Kent.<br />
Aaron Back, 41, a father of four, spent months in hospital after the incident at the EMIR site on Wotton Road in Ashford on 28 March 2023.<br />
The then 38-year-old had been contracted by South East Refurbishment Limited to carry out work dismantling pipework. He was in a raised tipping bucket on a fork lift truck at the time wh]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-falls-from-tipping-bucket-on-fork-lift/</link><pubDate>Fri, 24 Jul 2026 00:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-falls-from-tipping-bucket-on-fork-lift/</guid></item><item><title><![CDATA[Kier lands leading Piccadilly role for Crown Estate]]></title><description><![CDATA[Kier has been confirmed as main contractor for 10 Piccadilly in the heart of London.<br />
The job forms part of the next phase of the Crown Estate&rsquo;s West End development pipeline alongside the retrofit of 21-29 Glasshouse Street where BAM is main contractor.<br />
The two developments will deliver 169,300 sq ft of new office, retail and hospitality space and mark the latest step in The Crown Estate&rsquo;s long-term vision for its 10 million sq ft London portfolio.Kristy Lansdown, Managing Director o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-leading-piccadilly-role-for-crown-estate/</link><pubDate>Thu, 23 Jul 2026 17:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-leading-piccadilly-role-for-crown-estate/</guid></item><item><title><![CDATA[Wates London reset continues as director to join from Mace Construct]]></title><description><![CDATA[Wates has unveiled a new Commercial Director for Wates Construction London as the reset of its business across the capital continues.<br />
Kevin Grace will join in October from Mace Construct where he has spent the last 12 years lately as Commercial (Operations Director) leading projects including the &pound;1.1bn British Library extension.<br />
Grace will be working alongside George Mosey who took over as Managing Director for Construction London earlier this year.The company said the latest appointment]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-london-reset-continues-as-director-to-join-from-mace-construct/</link><pubDate>Thu, 23 Jul 2026 16:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-london-reset-continues-as-director-to-join-from-mace-construct/</guid></item><item><title><![CDATA[Wates London reset continues as director to join from Mace]]></title><description><![CDATA[Wates has unveiled a new Commercial Director for Wates Construction London as the reset of its business across the capital continues.<br />
Kevin Grace will join in October from Mace where he has spent the last 12 years lately as Commercial (Operations Director) leading projects including the &pound;1.1bn British Library extension.<br />
Grace will be working alongside George Mosey who took over as Managing Director for Construction London earlier this year.The company said the latest appointment &ldquo;for]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-london-reset-continues-as-director-to-join-from-mace/</link><pubDate>Thu, 23 Jul 2026 16:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-london-reset-continues-as-director-to-join-from-mace/</guid></item><item><title><![CDATA[Morgan Sindall lifts profit targets after blockbuster first half]]></title><description><![CDATA[Morgan Sindall has hiked profit targets for its Construction and Fit Out businesses after a record first half powered by booming building workloads and a surge in margins.<br />
This morning the contractor posted pre-tax profit of &pound;116m for the six months to 30 June, up 22% on last year, as revenue climbed 8% to &pound;2.56bn.Net cash strengthened to &pound;418m while its secured order book reached &pound;12.2bn, swelling to &pound;19.5bn including preferred bidder work.Construction and Fit Out]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-lifts-profit-targets-after-blockbuster-first-half/</link><pubDate>Thu, 23 Jul 2026 08:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-lifts-profit-targets-after-blockbuster-first-half/</guid></item><item><title><![CDATA[Sisk lands £38m London Irish Centre rebuild]]></title><description><![CDATA[Sisk has secured the job to deliver the &pound;38m redevelopment of the London Irish Centre in Camden.<br />
The firm is due to start work in January next year on the long-planned overhaul of the charity&rsquo;s Camden Square headquarters, with the new centre scheduled to reopen in the first quarter of 2029.<br />
Designed by Coffey Architects, the three-storey redevelopment will retain the building&rsquo;s original street fa&ccedil;ade while creating a modern cultural, welfare and community hub for the Iri]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sisk-lands-38m-london-irish-centre-rebuild/</link><pubDate>Thu, 23 Jul 2026 08:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sisk-lands-38m-london-irish-centre-rebuild/</guid></item><item><title><![CDATA[Hochtief lands £250m Blackpool Silicon Sands data centre deal]]></title><description><![CDATA[Blackpool Council has selected Hochtief Data Centre Partner UK as preferred concessionaire for the &pound;250m first phase of its flagship Silicon Sands digital campus beside Blackpool Airport.<br />
The first phase will deliver a 6MW carbon friendly data centre alongside around 20,000 sq ft of office and research space.The facility has already secured planning permission and will use liquid immersion cooling technology, with waste heat captured and fed into a proposed district heat network serving th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hochtief-lands-250m-blackpool-silicon-sands-data-centre-deal/</link><pubDate>Thu, 23 Jul 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hochtief-lands-250m-blackpool-silicon-sands-data-centre-deal/</guid></item><item><title><![CDATA[Hochtief bags £250m Blackpool Silicon Sands data centre]]></title><description><![CDATA[Blackpool Council has selected Hochtief Data Centre Partner UK as preferred concessionaire for the &pound;250m first phase of its flagship Silicon Sands digital campus beside Blackpool Airport.<br />
The first phase will deliver a 6MW carbon friendly data centre alongside around 20,000 sq ft of office and research space.The facility has already secured planning permission and will use liquid immersion cooling technology, with waste heat captured and fed into a proposed district heat network serving th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hochtief-bags-250m-blackpool-silicon-sands-data-centre/</link><pubDate>Thu, 23 Jul 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hochtief-bags-250m-blackpool-silicon-sands-data-centre/</guid></item><item><title><![CDATA[HBC wins 240-home Sheffield brewery site revival]]></title><description><![CDATA[Contractor HBC has been lined up to deliver the first phase of Capital&amp;Centric&rsquo;s regeneration of the former Cannon Brewery site in Sheffield after the 240-home scheme secured planning.<br />
The green light clears the way for work to begin on the 4.2-acre former Stones Brewery site in Neepsend, where the developer plans to create a new mixed-use neighbourhood with around 500 homes.<br />
HBC will build the opening phase comprising 240 flats, alongside the first elements of a wider masterplan that]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hbc-wins-240-home-sheffield-brewery-site-revival/</link><pubDate>Thu, 23 Jul 2026 07:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hbc-wins-240-home-sheffield-brewery-site-revival/</guid></item><item><title><![CDATA[HBC lands 240-home Sheffield brewery site revival]]></title><description><![CDATA[Contractor HBC has been lined up to deliver the first phase of Capital&amp;Centric&rsquo;s regeneration of the former Cannon Brewery site in Sheffield after the 240-home scheme secured planning.<br />
The green light clears the way for work to begin on the 4.2-acre former Stones Brewery site in Neepsend, where the developer plans to create a new mixed-use neighbourhood with around 500 homes.<br />
HBC will build the opening phase comprising 240 flats, alongside the first elements of a wider masterplan that]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hbc-lands-240-home-sheffield-brewery-site-revival/</link><pubDate>Thu, 23 Jul 2026 07:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hbc-lands-240-home-sheffield-brewery-site-revival/</guid></item><item><title><![CDATA[Green light for 54-storey multi-tenure Canary Wharf tower]]></title><description><![CDATA[Plans for a 54-storey mixed-tenure residential tower at Canary Wharf have been given the planning green light, clearing the way for the redevelopment of the 77 Marsh Wall office site into 820 homes.<br />
Developer Areli and British Airways Pension Trustees secured approval from Tower Hamlets for the scheme, which will see the site&rsquo;s existing 17-storey office block, built in the early 1990s, demolished.<br />
This will be replaced with what the developer describes as the UK&rsquo;s largest integrated]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-54-storey-multi-tenure-canary-wharf-tower/</link><pubDate>Thu, 23 Jul 2026 07:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-54-storey-multi-tenure-canary-wharf-tower/</guid></item><item><title><![CDATA[Contractors unveiled for £250m battery storage site]]></title><description><![CDATA[Fidra Energy has confirmed the contracting team for its &pound;250m West Burton C battery energy storage project in Nottinghamshire after agreeing funding for the scheme.<br />
Construction of West Burton C will begin later this year and it is expected to become fully operational in 2028 on the site of the former West Burton coal power station.<br />
Fidra&rsquo;s main contracting partners are Sungrow who will supply its batteries for the project and H&amp;MV Engineering who will be the principal designer a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-unveiled-for-250m-battery-storage-site/</link><pubDate>Wed, 22 Jul 2026 23:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-unveiled-for-250m-battery-storage-site/</guid></item><item><title><![CDATA[Aitch Construction expands with £80m turnover target]]></title><description><![CDATA[Aitch Construction is set to land another two deals in London as the expanding contractor targets turnover of &pound;80m.<br />
The firm has traditionally focused on delivering work in-house for parent company Aitch Group who specialise in developing residential and commercial schemes across the capital.<br />
Aitch Construction is now looking to work with more external clients and the Enquirer understands work will start next year on two schemes.On Newington Causeway in Elephant &amp; Castle Aitch is set t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/aitch-construction-expands-with-80m-turnover-target/</link><pubDate>Wed, 22 Jul 2026 22:51:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/aitch-construction-expands-with-80m-turnover-target/</guid></item><item><title><![CDATA[NEC Contracts unveils the next generation of collaborative alliancing]]></title><description><![CDATA[NEC Contracts has unveiled the NEC4 Project Alliance Contract (PAC), the next generation of NEC alliancing contracts and a significant step forward for collaborative project delivery.<br />
Created by the NEC4 Contract Board in collaboration with the Alliance Steering Group, the PAC is a fully integrated, multi-party contract intended for publication in the final quarter of 2026.<br />
The PAC brings together the most successful features of established collaborative forms. It succeeds the PPC2000 Project Pa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/nec-contracts-unveils-the-next-generation-of-collaborative-alliancing/</link><pubDate>Wed, 22 Jul 2026 17:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/nec-contracts-unveils-the-next-generation-of-collaborative-alliancing/</guid></item><item><title><![CDATA[Worker crushed as dumper truck overturns]]></title><description><![CDATA[A groundworks company has been fined after a worker was seriously injured when a dumper truck overturned.<br />
The incident happened on 10 October 2022 on a construction site in Ince. The driver had been reversing the one-tonne truck when it entered an unprotected excavation and overturned.<br />
The man, 27 at the time, was thrown from the vehicle as he was not wearing a seatbelt. He sustained crushing injuries to his leg, resulting in a broken foot and ankle.An HSE investigation found the man had not bee]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-crushed-as-dumper-truck-overturns/</link><pubDate>Wed, 22 Jul 2026 14:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-crushed-as-dumper-truck-overturns/</guid></item><item><title><![CDATA[Mace taps Permasteelisa for landmark City façade refurb]]></title><description><![CDATA[Permasteelisa Group has been appointed by Mace Construct to deliver the complex fa&ccedil;ade refurbishment package at the overhaul of 60 Queen Victoria Street in the City of London.<br />
The specialist will strip the original fa&ccedil;ade from the nine storey office building before refurbishing and reinstalling it alongside newly manufactured replacement panels.<br />
Originally designed by architect Peter Foggo and completed in the late 1990s, the building is undergoing a &pound;70m retrofit aimed at ex]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-taps-permasteelisa-for-landmark-city-faade-refurb/</link><pubDate>Wed, 22 Jul 2026 09:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-taps-permasteelisa-for-landmark-city-faade-refurb/</guid></item><item><title><![CDATA[Downwell gets going on Westminster Tower job]]></title><description><![CDATA[Downwell Group has started main construction works for developer London Square on the transformation of Westminster Tower into luxury residential apartments on London&rsquo;s South Bank.<br />
Gateway&nbsp; Two approval has recently been signed off by the Building Safety Regulator allowing Downwell to start on the main construction phase.<br />
Downwell Group will be delivering a&pound;9m package of enabling works, including soft strip, full de-cladding, high-level demolition, installation of a steel-framed]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/downwell-gets-going-on-westminster-tower-job/</link><pubDate>Wed, 22 Jul 2026 08:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/downwell-gets-going-on-westminster-tower-job/</guid></item><item><title><![CDATA[Henry Boot warns on profit as land sales slump]]></title><description><![CDATA[Henry Boot has warned full-year profits will come in significantly below market expectations after a sharp slowdown in land sales and a slide into loss at its house building business.<br />
The Sheffield-based developer said profit before tax for 2026 would miss current forecasts of &pound;20m as subdued transaction volumes and weaker market confidence continued to weigh on trading.<br />
The biggest setback came at land promotion arm Hallam Land, where plot sales more than halved to 556 in the first six mo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/henry-boot-warns-on-profit-as-land-sales-slump/</link><pubDate>Wed, 22 Jul 2026 08:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/henry-boot-warns-on-profit-as-land-sales-slump/</guid></item><item><title><![CDATA[McLaughlin &amp; Harvey lands &pound;100m Rolls Royce deal]]></title><description><![CDATA[McLaughlin &amp; Harvey has won a contract worth more than &pound;100m to build a new combat air facility for Rolls-Royce in Bristol.<br />
Construction is scheduled to start later this year on the facility which will provide space for research, manufacturing and assembly for new product development for the future of air combat.<br />
Paul Pennington, Senior Vice President of Infrastructure, Defence, Rolls-Royce, said: &ldquo;This complex facility is a physical manifestation of our commitment to novel techn]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-amp-harvey-lands-pound100m-rolls-royce-deal/</link><pubDate>Wed, 22 Jul 2026 08:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-amp-harvey-lands-pound100m-rolls-royce-deal/</guid></item><item><title><![CDATA[PfH names winners on £480m repairs and disrepair deal]]></title><description><![CDATA[Procurement for Housing has named the contractors that will compete for &pound;480m of higher-value responsive repairs, void refurbishment and disrepair work under its latest national maintenance framework.<br />
The biggest names in the sector dominated the awards, with Axis Europe, Bell Group, Cardo Group, Chigwell London, CLC Contractors, Combined Facilities Management, Equans Regeneration, Ian Williams, Jones Building Group, Synergize, TW Group South Wales and United Living Property Services secur]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pfh-names-winners-on-480m-repairs-and-disrepair-deal/</link><pubDate>Wed, 22 Jul 2026 08:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pfh-names-winners-on-480m-repairs-and-disrepair-deal/</guid></item><item><title><![CDATA[PfH names winners on £480m repair and disrepair deal]]></title><description><![CDATA[Procurement for Housing has named the contractors that will compete for &pound;480m of higher-value responsive repairs, void refurbishment and disrepair work under its latest national maintenance framework.<br />
The biggest names in the sector dominated the awards, with Axis Europe, Bell Group, Cardo Group, Chigwell London, CLC Contractors, Combined Facilities Management, Equans Regeneration, Ian Williams, Jones Building Group, Synergize, TW Group South Wales and United Living Property Services secur]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pfh-names-winners-on-480m-repair-and-disrepair-deal/</link><pubDate>Wed, 22 Jul 2026 08:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pfh-names-winners-on-480m-repair-and-disrepair-deal/</guid></item><item><title><![CDATA[Kier wins £120m Brum roads extension amid PFI hiatus]]></title><description><![CDATA[Kier has secured a &pound;120m extension to keep maintaining Birmingham&rsquo;s roads as the city continues to grapple with the future of its stalled highways PFI.<br />
Birmingham City Council has directly awarded the contractor a fresh two-year interim deal from 1 August 2026, with an option to extend it by a further nine months until April 2029.<br />
The move keeps Kier in charge of the city&rsquo;s highways network while the council works towards a long-term replacement for one of the UK&rsquo;s bigges]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-wins-120m-brum-roads-extension-amid-pfi-hiatus/</link><pubDate>Wed, 22 Jul 2026 08:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-wins-120m-brum-roads-extension-amid-pfi-hiatus/</guid></item><item><title><![CDATA[Tilbury Douglas completes balance sheet turnaround]]></title><description><![CDATA[Tilbury Douglas has completed a four-year financial turnaround, restoring its balance sheet to a positive net asset position after starting life as a standalone contractor in 2022 with net liabilities of around &pound;80m.<br />
The latest milestone comes just six months after the business was still carrying net liabilities of &pound;33m at the turn of the year, underlining the pace of its recovery.<br />
Alongside the balance sheet repair, Tilbury Douglas secured more than &pound;500m of new work during th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tilbury-douglas-completes-balance-sheet-turnaround/</link><pubDate>Wed, 22 Jul 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tilbury-douglas-completes-balance-sheet-turnaround/</guid></item><item><title><![CDATA[Civils firms upbeat on pipeline despite tough first quarter]]></title><description><![CDATA[Civil engineering contractors are shrugging off a weak start to the year after stronger order books fuelled confidence that infrastructure workloads will rebound over the next 12 months.<br />
The latest Civil Engineering Contractors Association workload survey found order books climbed to their highest level for three quarters, with a net balance of 19% of firms reporting fuller pipelines.Looking ahead, a net 60% expect workloads to increase over the coming year, while 55% forecast growth in new work]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/civils-firms-upbeat-on-pipeline-despite-tough-first-quarter/</link><pubDate>Tue, 21 Jul 2026 11:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/civils-firms-upbeat-on-pipeline-despite-tough-first-quarter/</guid></item><item><title><![CDATA[OCS strikes £3.1bn deal to buy Mitie]]></title><description><![CDATA[Facilities management giant OCS has agreed a recommended &pound;3.1bn cash takeover of rival Mitie to create one of the UK&rsquo;s biggest outsourced services groups with combined annual revenues of around &pound;8.5bn.<br />
Under the terms of the deal, Mitie shareholders will receive 218.5p a share in cash and retain the planned 3.1p final dividend, valuing the offer at up to 221.6p a share.<br />
The bid represents a 47% premium to Mitie&rsquo;s closing share price on Monday and values the business at &p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ocs-strikes-31bn-deal-to-buy-mitie/</link><pubDate>Tue, 21 Jul 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ocs-strikes-31bn-deal-to-buy-mitie/</guid></item><item><title><![CDATA[5,000-home Royal Docks mega scheme set for 2028 start]]></title><description><![CDATA[Dubai-based developer Arada has accelerated plans for its &pound;2.5bn Thameside West regeneration in London&rsquo;s Royal Docks aiming to start construction in early 2028.<br />
The developer has confirmed architect Gensler, engineer Arup and landscape designer Planit are leading the professional team on the opening phase of the 5,000-home waterfront scheme.<br />
It aims to submit a planning application later this summer for the first stage, which will deliver 1,500 homes across six buildings.The 47-acre]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/5000-home-royal-docks-mega-scheme-set-for-2028-start/</link><pubDate>Tue, 21 Jul 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/5000-home-royal-docks-mega-scheme-set-for-2028-start/</guid></item><item><title><![CDATA[Kier closes in on £12bn order book after strong year]]></title><description><![CDATA[Kier is closing in on a &pound;12bn order book as it targets growth from the surge in UK spending on water, nuclear and defence infrastructure.<br />
The contractor&rsquo;s order book rose 8% to around &pound;11.9bn at the end of June, securing more than 90% of forecast revenue for the current financial year.<br />
In a full-year trading update ahead of publishing its annual results in September, Kier said revenue and profit for the year to June were now expected to come in at the top end of market expectat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-closes-in-on-12bn-order-book-after-strong-year/</link><pubDate>Tue, 21 Jul 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-closes-in-on-12bn-order-book-after-strong-year/</guid></item><item><title><![CDATA[Skills cards stats show youngsters turning to construction]]></title><description><![CDATA[The number of industry skills cards issued to young workers has jumped significantly as construction becomes more attractive to the under-25s.<br />
New figures published by the CSCS Alliance show that cards issued to workers under the age of 25 rose by&nbsp; 8.8% between 2023 and 2025 &ndash; jumping from 86,798 to 94,444.<br />
The highest increases were seen in the electrotechnical,&nbsp; utilities and plant sectors.Under-25s now account for 19% of all CSCS-logoed cards issued.<br />
Growth in skilled roles (9]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/skills-cards-stats-show-youngsters-turning-to-construction/</link><pubDate>Tue, 21 Jul 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/skills-cards-stats-show-youngsters-turning-to-construction/</guid></item><item><title><![CDATA[Green light for Derby city centre regeneration scheme]]></title><description><![CDATA[Plans to reshape Derby&rsquo;s city centre Market Place have taken a big step forward after outline planning was granted for the former Assembly Rooms site.<br />
The plans are being brought forward by council development partners VINCI UK Developments and ION Developments.<br />
Approval allows the Council to now submit an application to discharge the planning conditions attached to the demolition of the former Assembly Rooms.Work to demolish the site is expected to take around 12 months. Once this is comp]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-derby-city-centre-regeneration-scheme/</link><pubDate>Tue, 21 Jul 2026 07:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-derby-city-centre-regeneration-scheme/</guid></item><item><title><![CDATA[Torsion Construction files administration notice]]></title><description><![CDATA[Leeds based Torsion Construction has filed a notice of intention to appoint an administrator.<br />
Directors said the move was designed to give them breathing space as they battle to save the&nbsp;&pound;165m turnover business which specialises in student accommodation, retirement living and build to rent jobs across the North and Midlands.<br />
Other companies within the wider Torsion Group, including the development and care home operations, are unaffected by the move and continue to trade as normal.<br />
Th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/torsion-construction-files-administration-notice/</link><pubDate>Mon, 20 Jul 2026 23:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/torsion-construction-files-administration-notice/</guid></item><item><title><![CDATA[RED lands £42m Bristol and Bath office double]]></title><description><![CDATA[RED South West has landed more than &pound;42m of office refurbishment work after securing contracts to deliver flagship schemes in Bristol and Bath.<br />
Investor BlackRock and development manager LS Estates has picked the firm to deliver the major overhaul of Portwall Place in Bristol, alongside an &pound;8m refurbishment of Pinesgate West in Bath for WPV Developments.<br />
Portwall Place is the larger of the two schemes and is expected to become the South West&rsquo;s biggest commercial office refurbis]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/red-lands-42m-bristol-and-bath-office-double/</link><pubDate>Mon, 20 Jul 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/red-lands-42m-bristol-and-bath-office-double/</guid></item><item><title><![CDATA[Muse picked to spearhead Bletchley station quarter revival]]></title><description><![CDATA[Milton Keynes City Council has picked Muse to lead a major regeneration around Bletchley station for new homes and shops as the town prepares for the arrival of East West Rail.<br />
The nationwide regeneration specialist has signed a development deal with the council to prepare a masterplan covering major development sites on both the eastern and western sides of the station.<br />
Working alongside Milton Keynes Development Partnership, Muse will bring forward plans for a mixed-use neighbourhood featuring]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/muse-picked-to-spearhead-bletchley-station-quarter-revival/</link><pubDate>Mon, 20 Jul 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/muse-picked-to-spearhead-bletchley-station-quarter-revival/</guid></item><item><title><![CDATA[Severn Trent reveals timetable for £25bn deal race]]></title><description><![CDATA[Severn Trent Water is preparing to launch a pre-market engagement notice to start talks with the supply chain for a new generation of capital delivery frameworks worth up to &pound;25bn over the next 8&ndash;15 years across the Midlands.<br />
The frameworks will cover the AMP9, AMP10 and AMP11 investment periods.<br />
Procurement is expected to start early next year with the frameworks designed to engage a diverse range of partners from major international contractors to regional and local SMEs.<br />
Potential]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/severn-trent-reveals-timetable-for-25bn-deal-race/</link><pubDate>Mon, 20 Jul 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/severn-trent-reveals-timetable-for-25bn-deal-race/</guid></item><item><title><![CDATA[Railpen wins consent for London major office retrofit]]></title><description><![CDATA[Railpen has secured planning approval for the redevelopment of its 12 Smithfield office building in the City of London.<br />
The &pound;34bn Railways Pension Scheme manager will transform the existing six-storey office opposite Smithfield Market into a flagship headquarters building as part of the wider &pound;400m regeneration of the historic district.<br />
Designed by Henley Halebrown, the project will retain and upgrade the existing structure while replacing the fa&ccedil;ade, extending the upper floor]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/railpen-wins-consent-for-london-major-office-retrofit/</link><pubDate>Mon, 20 Jul 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/railpen-wins-consent-for-london-major-office-retrofit/</guid></item><item><title><![CDATA[Ethical Power contracting arms go into administration]]></title><description><![CDATA[Renewable energy specialist Ethical Power has placed some of its contracting operations into administration.<br />
In a company statement the firm said: &ldquo;This is to confirm that in June, two of Ethical Power&rsquo;s contracting Entities (Ethical Power Connections and Ethical Power Group) were placed into administration. On Friday 26th June we also filed notice of intention to appoint administrators for Ethical Power Renewables, another contracting entity.<br />
&ldquo;These contracting entities were d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ethical-power-contracting-arms-go-into-administration/</link><pubDate>Mon, 20 Jul 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ethical-power-contracting-arms-go-into-administration/</guid></item><item><title><![CDATA[Tower Hamlets opens bidding on £31m social housing build]]></title><description><![CDATA[London&rsquo;s Tower Hamlets council has launched the hunt for a main contractor to deliver a &pound;31m social rent new homes project in Bethnal Green.<br />
The council is inviting bids for the Albert Jacob House scheme on Roman Road, designed by Child Graddon Lewis, with construction expected to start in November following contract award.<br />
The development will replace a former council office building, which has already been demolished, with a nine-storey low carbon scheme delivering 53 affordable ho]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tower-hamlets-opens-bidding-on-31m-social-housing-build/</link><pubDate>Mon, 20 Jul 2026 08:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tower-hamlets-opens-bidding-on-31m-social-housing-build/</guid></item><item><title><![CDATA[£33m race begins for Caerphilly bus and railway interchange]]></title><description><![CDATA[Transport for Wales is starting the hunt for a contractor to deliver the &pound;33m redevelopment of Caerphilly Interchange, opening the race for one of the next major projects in the South Wales Metro programme.<br />
The successful design and build contractor will replace the existing railway station and adjoining bus interchange with a fully integrated transport hub linking rail, bus and taxi hub with new passenger facilities, retail space and upgraded public realm.<br />
The project is a key part of wid]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/33m-race-begins-for-caerphilly-bus-and-railway-interchange/</link><pubDate>Mon, 20 Jul 2026 08:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/33m-race-begins-for-caerphilly-bus-and-railway-interchange/</guid></item><item><title><![CDATA[Experts join forces for Sizewell piling works]]></title><description><![CDATA[Three leading specialists have joined forces to deliver the geotechnical works needed for the new Sizewell C nuclear power station.<br />
Balfour Beatty Ground Engineering (BBGE), VSL Systems (UK) Ltd (VSL), and Bachy Soletanche (BSL) have united to deliver a range of works including piling, soil mixing, diaphragm walls and plastic cut-off walls.<br />
The trio have combined to form the Geotechnical Sub-Alliance (GSA).The GSA will create a stable and watertight platform capable of supporting the immense loa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/experts-join-forces-for-sizewell-piling-works/</link><pubDate>Fri, 17 Jul 2026 16:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/experts-join-forces-for-sizewell-piling-works/</guid></item><item><title><![CDATA[Amey hires HS2 veteran to drive consulting growth]]></title><description><![CDATA[Amey has recruited infrastructure heavyweight Jonathan Goring as executive advisor to help accelerate growth across its consulting business and target new markets at home and overseas.<br />
Goring brings more than three decades of experience leading major infrastructure and transformation programmes, having held senior roles at Capita, Morgan Sindall, PA Consulting, Mott MacDonald and Systra.He has also worked on flagship programmes including HS2 and Saudi Arabia&rsquo;s NEOM development.He joins Ame]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/amey-hires-hs2-veteran-to-drive-consulting-growth/</link><pubDate>Fri, 17 Jul 2026 09:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/amey-hires-hs2-veteran-to-drive-consulting-growth/</guid></item><item><title><![CDATA[Board suspends Alumasc CEO after trading update]]></title><description><![CDATA[Building products supplier Alumasc has suspended chief executive Pamela Bingham pending an investigation into matters relating to professional conduct.<br />
The board said Bingham, who took up the CEO role just four months ago, had been suspended while a full investigation, supported by professional advisers, is carried out. No further details of the allegations were disclosed.<br />
Non executive chair Vijay Thakrar has taken over as interim executive chair with immediate effect, supported by the group&rs]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/board-suspends-alumasc-ceo-after-trading-update/</link><pubDate>Fri, 17 Jul 2026 08:48:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/board-suspends-alumasc-ceo-after-trading-update/</guid></item><item><title><![CDATA[John F Hunt bags £20m enabling works deal at giant data centre]]></title><description><![CDATA[John F Hunt Regeneration is understood to have landed a &pound;20m enabling and remediation package from CyrusOne for its LON6 hyperscale data centre project in Iver Heath, Buckinghamshire.<br />
The development will form the first phase of a wider campus planned to provide ten data halls.<br />
John F Hunt is expected to deliver a complex remediation programme involving preparation of the 41-acre site near the M25/M40 interchange through a fast-track 17-week programme, addressing the historic landfill and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-bags-20m-enabling-works-deal-at-giant-data-centre/</link><pubDate>Fri, 17 Jul 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-bags-20m-enabling-works-deal-at-giant-data-centre/</guid></item><item><title><![CDATA[Solihull backs 228-home Habiko mansion block build]]></title><description><![CDATA[Affordable homes developer Habiko has secured planning approval for a 228-home mansion block-inspired scheme in Solihull, marking the partnership&rsquo;s first development in the West Midlands.<br />
The affordable housing joint venture between Pension Insurance Corporation, Muse and Homes England will build 228 one and two-bedroom apartments for rent, with rents set at 20% below local market levels.<br />
The project forms phase two of the wider Holbeche Place masterplan, which will transform Solihull town]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/solihull-backs-228-home-habiko-mansion-block-build/</link><pubDate>Fri, 17 Jul 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/solihull-backs-228-home-habiko-mansion-block-build/</guid></item><item><title><![CDATA[MOD maps out £26bn Project Royal Oak naval bases rebuild]]></title><description><![CDATA[The Ministry of Defence has unveiled details of a &pound;26bn programme to rebuild the UK&rsquo;s three principal naval bases with a decade of marine civils, dockyard engineering and building work in the biggest naval infrastructure investment since the Cold War.<br />
The ten-year Project Royal Oak programme will deliver new docks, waterfront infrastructure, engineering facilities, accommodation and operational buildings at HMNB Clyde, HMNB Devonport and HMNB Portsmouth as part of the Government&rsqu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mod-maps-out-26bn-project-royal-oak-naval-bases-rebuild/</link><pubDate>Fri, 17 Jul 2026 08:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mod-maps-out-26bn-project-royal-oak-naval-bases-rebuild/</guid></item><item><title><![CDATA[MOD maps out £26bn Project Royal Oak naval base rebuild]]></title><description><![CDATA[The Ministry of Defence has unveiled details of a &pound;26bn programme to rebuild the UK&rsquo;s three principal naval bases with a decade of marine civils, dockyard engineering and building work in the biggest naval infrastructure investment since the Cold War.<br />
The ten-year Project Royal Oak programme will deliver new docks, waterfront infrastructure, engineering facilities, accommodation and operational buildings at HMNB Clyde, HMNB Devonport and HMNB Portsmouth as part of the Government&rsqu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mod-maps-out-26bn-project-royal-oak-naval-base-rebuild/</link><pubDate>Fri, 17 Jul 2026 08:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mod-maps-out-26bn-project-royal-oak-naval-base-rebuild/</guid></item><item><title><![CDATA[Hill go-ahead for London New Era Estate rebuild]]></title><description><![CDATA[Hill Group is set to start work next month on the long-awaited rebuild of Hackney&rsquo;s New Era Estate after housing charity Dolphin Living secured planning approval for the 208-home regeneration scheme.<br />
The August start follows Hackney Council&rsquo;s approval for the Allies &amp; Morrison-designed redevelopment, which will replace the ageing 1930s private rented estate with buildings ranging from three to 13 storeys.<br />
The scheme will deliver 208 one, two and three-bedroom homes, more than dou]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-go-ahead-for-london-new-era-estate-rebuild/</link><pubDate>Fri, 17 Jul 2026 08:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-go-ahead-for-london-new-era-estate-rebuild/</guid></item><item><title><![CDATA[O’Rourke confirms major expansion of manufacturing capacity]]></title><description><![CDATA[Laing O&rsquo;Rourke is expanding its manufacturing capacity to meet growing demand for its approach to industrialised construction.<br />
Crown House Technologies Manufacturing (CHtM) and Explore Manufacturing will both be expanded.<br />
CHtM is moving to a larger facility in Smethwick, West Midlands and Explore Manufacturing is adding 3,200 square metres of manufacturing space at its current location in Explore Park, Nottinghamshire.The upgraded facilities will also allow exploration of and further inves]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/orourke-confirms-major-expansion-of-manufacturing-capacity/</link><pubDate>Thu, 16 Jul 2026 10:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/orourke-confirms-major-expansion-of-manufacturing-capacity/</guid></item><item><title><![CDATA[South Wales roads bodies launch £270m highways framework]]></title><description><![CDATA[Contractors are set to battle for places on a &pound;270m framework covering highways, bridge maintenance and surfacing work across South Wales.<br />
Neath Port Talbot County Borough Council is leading the procurement on behalf of Carmarthenshire and Monmouthshire councils for the new SWTRA Highways &amp; Structures Framework 2027.<br />
The framework will run for four years from February 2027, with options to extend annually for a further two years, taking its maximum duration to six years. Up to eight co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/south-wales-roads-bodies-launch-270m-highways-framework/</link><pubDate>Thu, 16 Jul 2026 09:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/south-wales-roads-bodies-launch-270m-highways-framework/</guid></item><item><title><![CDATA[SIG set for cost-cutting drive as materials market stalls]]></title><description><![CDATA[Building materials distribution giant SIG is planning a &pound;100m efficiency drive as the market continues to struggle.<br />
In a trading update today SIG said: &ldquo;The Group has developed an improvement plan assuming no market recovery in H2 2026 and FY 2027.&ldquo;The plan aims to generate cash of at least &pound;100m, through a combination of business simplification, disposals, business improvement and working capital optimisation.<br />
&ldquo;It is also targeting an annualised operating profit ru]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sig-set-for-cost-cutting-drive-as-materials-market-stalls/</link><pubDate>Thu, 16 Jul 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sig-set-for-cost-cutting-drive-as-materials-market-stalls/</guid></item><item><title><![CDATA[Plan for triple-tower Stratford scheme on former Sphere site]]></title><description><![CDATA[Developer Hallmark Property Group has unveiled plans for a cluster of three towers rising to 47 storeys on the former London Sphere site at Stratford Junction, replacing the long-stalled entertainment proposal with a major mixed-use cultural quarter.<br />
Designed by Squire &amp; Partners, the scheme would regenerate the 2.05ha rail-surrounded site between Stratford Station and Stratford International that has remained vacant since serving as coach parking during the 2012 Olympic Games.<br />
The developme]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plan-for-triple-tower-stratford-scheme-on-former-sphere-site/</link><pubDate>Thu, 16 Jul 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plan-for-triple-tower-stratford-scheme-on-former-sphere-site/</guid></item><item><title><![CDATA[Crest sinks to £35m loss as lender talks drag on]]></title><description><![CDATA[House builder Crest Nicholson plunged to a &pound;35m half-year loss as directors remain locked in negotiations with lenders over revised banking covenants after net debt almost doubled to &pound;142m.<br />
Crest this morning revealed it had plunged into the red for the six months to 30 April compared with a &pound;9.4m profit a year earlier.Revenue fell 21% to &pound;198m as completions dropped from 739 to 584 homes, while adjusted operating results swung from an &pound;11.9m profit to an &pound;11.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/crest-sinks-to-35m-loss-as-lender-talks-drag-on/</link><pubDate>Thu, 16 Jul 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/crest-sinks-to-35m-loss-as-lender-talks-drag-on/</guid></item><item><title><![CDATA[Wates regional MD and director exit suddenly]]></title><description><![CDATA[Two bosses at the UK East Construction division of Wates have suddenly left the business.<br />
Managing Director David Wingfield and Commercial Director Kyle McGrory have left the company with immediate effect.<br />
Their roles are now being covered by executive Managing Director Steff Battle.The Enquirer understands Wingfield and McGrory had been suspended by Wates while an internal investigation was carried-out into their conduct.<br />
Wates declined to confirm the exact nature of the investigation.<br />
A Wates]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-regional-md-and-director-exit-suddenly/</link><pubDate>Thu, 16 Jul 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-regional-md-and-director-exit-suddenly/</guid></item><item><title><![CDATA[Barratt claws back £38m from subcontractors in legacy job claims]]></title><description><![CDATA[Barratt Redrow has clawed back &pound;38m from subcontractors over defects on legacy developments, helping offset mounting building safety costs as the house builder prepares to double remediation spending to &pound;300m this year.<br />
In a year-end trading update this morning, Britain&rsquo;s biggest house builder highlighted the growing financial impact of legacy building issues, with the group taking an additional net legacy property provision charge of around &pound;95m, alongside &pound;13m of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barratt-claws-back-38m-from-subcontractors-in-legacy-job-claims/</link><pubDate>Wed, 15 Jul 2026 08:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barratt-claws-back-38m-from-subcontractors-in-legacy-job-claims/</guid></item><item><title><![CDATA[Galliford Try profit set to hit top end of forecasts]]></title><description><![CDATA[Galliford Try expects annual profit to reach the top end of market forecasts after delivering a sixth consecutive year of revenue, profit and cash growth.<br />
Ahead of full-year results on 17 September, the contractor said revenue for the year to 30 June is expected to rise around 3%, with adjusted pre-tax profit towards the top of analyst expectations of around &pound;53m.<br />
Chief executive Bill Hocking said that the group also had delivered another year of margin improvement as it worked towards a 4]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-profit-set-to-hit-top-end-of-forecasts/</link><pubDate>Wed, 15 Jul 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-profit-set-to-hit-top-end-of-forecasts/</guid></item><item><title><![CDATA[Mace to start £150m former London City Hall retrofit]]></title><description><![CDATA[Mace starts work this month on the &pound;150m transformation of London&rsquo;s former City Hall, returning to the landmark building it originally delivered 24 years ago.<br />
The contractor has been appointed by Kuwaiti-owned St Martins Property Investments to redevelop the former Greater London Authority headquarters at More London into a larger, low carbon office and retail destination.<br />
Designed by Gensler, with Waterman providing structural, mechanical and electrical engineering, the scheme will]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-to-start-150m-former-london-city-hall-retrofit/</link><pubDate>Wed, 15 Jul 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-to-start-150m-former-london-city-hall-retrofit/</guid></item><item><title><![CDATA[Giant TBM order puts Lower Thames Crossing tunnel on track]]></title><description><![CDATA[National Highways has ordered Europe&rsquo;s largest ever tunnel boring machine for the &pound;10bn Lower Thames Crossing, with tunnelling work on track to begin in 2028.<br />
German manufacturer Herrenknecht will build the 16.4m diameter machine, which will be the third largest tunnel boring machine ever built worldwide. The machine will be bought and operated by the Bouygues Travaux Publics Murphy joint venture, which is delivering the twin-bore tunnel beneath the Thames.<br />
At 120m long and weighing]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/giant-tbm-order-puts-lower-thames-crossing-tunnel-on-track/</link><pubDate>Wed, 15 Jul 2026 08:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/giant-tbm-order-puts-lower-thames-crossing-tunnel-on-track/</guid></item><item><title><![CDATA[Chief executive Mark Lawrence leaves TClarke]]></title><description><![CDATA[TClarke Chief Executive Officer Mark Lawrence has left the company with immediate effect after a 40-year career.<br />
The news was confirmed by&nbsp;Britain&rsquo;s biggest M&amp;E contractor as its posted latest results.<br />
Lawrence started at TClarke in 1985 as an electrical apprentice and worked his way through the ranks becoming CEO in 2010.TClarke delisted from the Stock Exchange in 2024 becoming a private company after its acquisition by the Regent Group.<br />
Fellow long serving director Mike Crowder]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/chief-executive-mark-lawrence-leaves-tclarke/</link><pubDate>Tue, 14 Jul 2026 16:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/chief-executive-mark-lawrence-leaves-tclarke/</guid></item><item><title><![CDATA[Turnover dips as Laing O’Rourke focuses on bottom line]]></title><description><![CDATA[Laing O&rsquo;Rourke saw pre-tax profits nearly double in its latest results despite a drop in turnover.<br />
Focusing on the bottom line is paying of for the contracting giant as pre-tax profits for the year to March 31 2026 rose to &pound;80.1m from &pound;41.4m last time as turnover fell to &pound;3.69bn from &pound;3.95bn.<br />
The company said the latest numbers reflect a &ldquo;deliberate shift towards prioritising margin improvement.&rdquo;Laing O&rsquo;Rourke also reported a record order book of &]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/turnover-dips-as-laing-orourke-focuses-on-bottom-line/</link><pubDate>Tue, 14 Jul 2026 11:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/turnover-dips-as-laing-orourke-focuses-on-bottom-line/</guid></item><item><title><![CDATA[Cladding retrofit drive faces red alert over delivery delays]]></title><description><![CDATA[Delivery of the Government&rsquo;s flagship cladding remediation programme has been red-flagged&nbsp;by infrastructure watchdog the National Infrastructure and Service Transformation Authority.<br />
In its assessment of the Government&rsquo;s major projects portfolio, the huge cladding retrofit programme was downgraded to a Red delivery rating after officials warned that current plans &ldquo;remain challenging&rdquo; because of Building Safety Regulator delays, rising construction costs and growing w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cladding-retrofit-drive-faces-red-alert-over-delivery-delays/</link><pubDate>Tue, 14 Jul 2026 09:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cladding-retrofit-drive-faces-red-alert-over-delivery-delays/</guid></item><item><title><![CDATA[Panattoni gets green light for Southampton logistics site]]></title><description><![CDATA[Developer Panattoni has secured planning consent for T Park Southampton &ndash; a new Grade A industrial and logistics development at Salisbury Road, Totton.<br />
The scheme will deliver five detached speculative units, providing around 223,000 sq ft of high-quality space.<br />
T Park Southampton is immediately adjacent to Junction 2 of the M27, providing direct access to the wider South Coast, the M3, London, and the national motorway network. The site is also around 5.5 miles from Southampton Port, the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/panattoni-gets-green-light-for-southampton-logistics-site/</link><pubDate>Tue, 14 Jul 2026 09:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/panattoni-gets-green-light-for-southampton-logistics-site/</guid></item><item><title><![CDATA[Diversification paying dividends for brick giant]]></title><description><![CDATA[An expansion into specialist contracting is paying-off for construction materials distributor BRCK Group as its core market continues to be hit by a slow housing market.<br />
Materials distribution operations account for 80% of turnover with the growing design and install specialist contracting operations now hitting 20%.<br />
Revenue across the business for the year to March 31 2026 increased to &pound;645.4m from &pound;637.1m last time as pre-tax profits fell to &pound;6.3m from &pound;11.7m.The design]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/diversification-paying-dividends-for-brick-giant/</link><pubDate>Tue, 14 Jul 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/diversification-paying-dividends-for-brick-giant/</guid></item><item><title><![CDATA[Galliford Try and Balfour Beatty join forces for £1.9bn A9 race]]></title><description><![CDATA[Galliford Try has teamed up with Balfour Beatty to target Scotland&rsquo;s biggest roads prize &ndash; the &pound;1.9bn dualling of the remaining stretches of the A9 between Perth and Inverness.<br />
The joint venture, which brings together Balfour Beatty and Galliford Try&rsquo;s Scottish business Morrison Construction, is understood to have been formed to bid for the final five contracts under Transport Scotland&rsquo;s new NEC4 framework approach.<br />
Selected firms will deliver around 92km of dual ca]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-and-balfour-beatty-join-forces-for-19bn-a9-race/</link><pubDate>Tue, 14 Jul 2026 08:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-and-balfour-beatty-join-forces-for-19bn-a9-race/</guid></item><item><title><![CDATA[Bouygues high-rise key worker housing pilot gains consent]]></title><description><![CDATA[Bouygues UK has secured planning permission for a landmark 152-home key worker housing scheme in Southwark that will test a new affordable rent model aimed at helping essential public sector staff live closer to central London.<br />
The SE1 development, on the corner of Abbey Street and Druid Street near London Bridge station, will deliver homes for key workers including NHS staff, teachers, police officers and firefighters under Southwark Council&rsquo;s emerging Affordable Housing Supplementary Pla]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bouygues-high-rise-key-worker-housing-pilot-gains-consent/</link><pubDate>Tue, 14 Jul 2026 08:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bouygues-high-rise-key-worker-housing-pilot-gains-consent/</guid></item><item><title><![CDATA[Consultant lands Creature Comforts jobs]]></title><description><![CDATA[A leading Midlands construction consultancy is supporting two more projects as part of an ambitious UK rollout by veterinary group Creature Comforts.<br />
Birmingham-based The Construction Consultants (TCC) has been acting as project managers, cost consultants and CDM consultants for Creature Comforts veterinary clinics&nbsp; being opened across London and the South East.<br />
The latest contracts are for two state-of-the-art veterinary clinics in Twickenham and West Hampstead where town centre premises h]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/consultant-lands-creature-comforts-jobs/</link><pubDate>Mon, 13 Jul 2026 17:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/consultant-lands-creature-comforts-jobs/</guid></item><item><title><![CDATA[SCAPE starts tender race for £1.2bn regional deal]]></title><description><![CDATA[Public sector procurement specialist SCAPE has published the Tender Notice for its next generation Regional Construction Works and Services framework.<br />
This &pound;1.2bn deal over a four-year period will support projects up to &pound;15m in value across the Midlands, East of England, Home Counties and London.<br />
To encourage greater participation from regional contractors and SMEs, bidders are required to demonstrate an annual turnover of &pound;20 million, either individually or collectively throug]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scape-starts-tender-race-for-12bn-regional-deal/</link><pubDate>Mon, 13 Jul 2026 15:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scape-starts-tender-race-for-12bn-regional-deal/</guid></item><item><title><![CDATA[Funding deal sparks £1bn Golden Valley cyber hub build]]></title><description><![CDATA[Henry Boot has secured the funding package to launch construction of the first phase of Cheltenham&rsquo;s &pound;1bn Golden Valley cyber campus.<br />
Bowmer &amp; Kirkland is on site to deliver the &pound;95m opening phase which includes the 160,000 sq ft IDEA innovation centre, the ROUTER transport hub and enabling infrastructure.<br />
Henry Boot&rsquo;s development arm HBD secured the forward funding from private investors alongside Cheltenham Borough Council, allowing work to move into full constructi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/funding-deal-sparks-1bn-golden-valley-cyber-hub-build/</link><pubDate>Mon, 13 Jul 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/funding-deal-sparks-1bn-golden-valley-cyber-hub-build/</guid></item><item><title><![CDATA[Clegg Construction lands £19m Leicester estate revamp]]></title><description><![CDATA[Leicester City Council has selected Clegg Construction for the &pound;18.8m redevelopment of the Stocking Farm estate to the north-west of the city.<br />
Work will see 50 new energy-efficient family council homes built on the 3.34-acre site, along with new community facilities. An additional five existing council maisonettes will also be improved as part of the scheme.<br />
The existing locally-listed Stocking Farm farmhouse building &ndash; which dates to the 19th century &ndash; will also be redeveloped]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/clegg-construction-lands-19m-leicester-estate-revamp/</link><pubDate>Mon, 13 Jul 2026 08:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/clegg-construction-lands-19m-leicester-estate-revamp/</guid></item><item><title><![CDATA[Stalled £1bn Harlow biosecurity mega project revived]]></title><description><![CDATA[The long-stalled UK Health Security Campus in Harlow has finally moved back towards restarting construction with the launch of a &pound;1bn hunt for a Tier 1 contractor to deliver the main science campus.<br />
The UK Health Security Agency has issued a preliminary market engagement notice for the vast design and build package, marking the clearest sign yet that the delayed flagship project is back on track after years of uncertainty over costs and value for money.<br />
Before committing to procurement, ag]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/stalled-1bn-harlow-biosecurity-mega-project-revived/</link><pubDate>Mon, 13 Jul 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/stalled-1bn-harlow-biosecurity-mega-project-revived/</guid></item><item><title><![CDATA[Worker killed in fall at Birmingham hospital job]]></title><description><![CDATA[A construction worker has died after falling from height at a project for Birmingham Children&rsquo;s Hospital.<br />
Contractor BSN Group Construction confirmed the fatality and said it was assisting investigators following the incident, which happened shortly before 9.50am on Friday.<br />
Emergency services attended the city centre hospital after reports that a man had fallen from the building. He was pronounced dead a short time later.The contractor is presently working on the new front entrance project]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-killed-in-fall-at-birmingham-hospital-job/</link><pubDate>Mon, 13 Jul 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-killed-in-fall-at-birmingham-hospital-job/</guid></item><item><title><![CDATA[JRL back in the black with record order book]]></title><description><![CDATA[JRL Group has returned to profit just over a year after a &pound;50m investment from Malaysian contractor IJM helped the diversified contractor group draw a line under costly legacy contracts.<br />
The London-based construction and specialist trades group posted pre-tax profit of &pound;2.9m for the 11 months to 31 March 2026, compared with a &pound;49m loss in the previous 16-month reporting period.<br />
Chairman John Reddington declared the contractor had emerged from a period of &ldquo;stabilisation, c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jrl-back-in-the-black-with-record-order-book/</link><pubDate>Mon, 13 Jul 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jrl-back-in-the-black-with-record-order-book/</guid></item><item><title><![CDATA[JRL back in the black after £50m rescue deal reset]]></title><description><![CDATA[JRL Group has returned to profit just over a year after a &pound;50m rescue deal with Malaysian contractor IJM helped the diversified contractor group draw a line under costly legacy contracts.<br />
The London-based construction and specialist trades group posted pre-tax profit of &pound;2.9m for the 11 months to 31 March 2026, compared with a &pound;49m loss in the previous 16-month reporting period.<br />
Chairman John Reddington declared the contractor had emerged from a period of &ldquo;stabilisation,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jrl-back-in-the-black-after-50m-rescue-deal-reset/</link><pubDate>Mon, 13 Jul 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jrl-back-in-the-black-after-50m-rescue-deal-reset/</guid></item><item><title><![CDATA[HG Construction lands brace of student schemes]]></title><description><![CDATA[HG Construction has been appointed as main contractor by Fusion Group on two new purpose-built student accommodation (PBSA) schemes in Cardiff and Loughborough.<br />
The wins are in line with HG&rsquo;s continued expansion across the UK, with the contractor now delivering schemes in over ten cities and towns including Leeds, Manchester, Bristol and London.<br />
The Cardiff scheme, situated in Longcross Court, will transform a prominent site in a sustainable location into high-quality student accommodation]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hg-construction-lands-brace-of-student-schemes/</link><pubDate>Mon, 13 Jul 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hg-construction-lands-brace-of-student-schemes/</guid></item><item><title><![CDATA[Linear Living gets green light for Manchester resi tower]]></title><description><![CDATA[Linear Living has received planning approval for its 24-storey residential scheme on Lord Street in Manchester&rsquo;s Green Quarter.<br />
The development will comprise 251 new homes which includes 82 one-beds and 165 two-bed apartments, as well as four townhouses.<br />
Work is expected to start before the end of this year with completion targeted for early 2029.Linear Design and Construct has been appointed main contractor alongside AEW Architects, planning consultants Enabl and project management firm R]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/linear-living-gets-green-light-for-manchester-resi-tower/</link><pubDate>Fri, 10 Jul 2026 19:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/linear-living-gets-green-light-for-manchester-resi-tower/</guid></item><item><title><![CDATA[Worker dies in fall on Mayfair site]]></title><description><![CDATA[A man was killed yesterday after falling from a site in London&rsquo;s West End.<br />
An air ambulance landed in nearby Green Park but the victim was pronounced dead at the scene on Stratton Street in the heart of Mayfair.<br />
A Metropolitan Police spokesman told London Now: &ldquo;Police were called at around 13:51hrs on Thursday, 9 July following reports that a man had fallen from height on a construction site at the junction of Berkeley Street and Stratton Street, W1&ldquo;Officers attended with the L]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-dies-in-fall-on-mayfair-site/</link><pubDate>Fri, 10 Jul 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-dies-in-fall-on-mayfair-site/</guid></item><item><title><![CDATA[Green light for ‘poo powered’ eco homes scheme]]></title><description><![CDATA[Plans for a pioneering 150-home eco village and major biotech employment hub powered by a live sewage treatment works have won planning approval.<br />
Bradford City Council has granted full consent for Yorkshire Water&rsquo;s flagship Esholt scheme, clearing the way for a mixed use development around the operational wastewater treatment works near Bradford.<br />
The project, conceived by Yorkshire Water&rsquo;s strategic land business Keyland Developments, is one of Britain&rsquo;s most ambitious circular]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-poo-powered-eco-homes-scheme/</link><pubDate>Fri, 10 Jul 2026 08:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-poo-powered-eco-homes-scheme/</guid></item><item><title><![CDATA[Seddon defies sluggish market with profit lift]]></title><description><![CDATA[Bolton contractor Seddon battled through project start delays to lift construction profits after expanding higher-margin property services and decarbonisation work.<br />
The construction arm of the family-owned group reported pre-tax profit ahead 31% to &pound;3m for the year to 31 December 2025, while turnover remained flat at &pound;137m after a series of delayed public sector projects hit expected workload.<br />
Despite higher staff costs as the business continued investing in recruitment, training and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/seddon-defies-sluggish-market-with-profit-lift/</link><pubDate>Fri, 10 Jul 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/seddon-defies-sluggish-market-with-profit-lift/</guid></item><item><title><![CDATA[Apprentice joiner crushed to death by falling boards]]></title><description><![CDATA[A property management company has been fined and its director handed a suspended jail sentence after an 18-year-old apprentice was killed while working at a property in Bangor, North Wales.<br />
Chloe Bidwell was working for Varcity Living Limited as a joinery apprentice at a property on 20 December 2023. It was undergoing a full renovation when a stack of wooden board material fell, fatally injuring&nbsp; Bidwell.<br />
She had been working alone at the time of the incident and was found deceased at the p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/apprentice-joiner-crushed-to-death-by-falling-boards/</link><pubDate>Fri, 10 Jul 2026 08:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/apprentice-joiner-crushed-to-death-by-falling-boards/</guid></item><item><title><![CDATA[Speller Metcalfe posts record £5m profit as cash pile hits £32m]]></title><description><![CDATA[Midlands contractor Speller Metcalfe has delivered its most profitable year on record after driving margins higher and building its cash reserves despite broadly flat revenue.<br />
Pre-tax profit surged 48% to &pound;5m for the year to 31 March 2026 as turnover dipped slightly to &pound;159m from &pound;162m.<br />
The improved performance lifted pre-tax margins from 2.1% to 3.15%.The contractor also boosted average cash balances by more than a third to &pound;32m, leaving it well placed to invest in the b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/speller-metcalfe-posts-record-5m-profit-as-cash-pile-hits-32m/</link><pubDate>Fri, 10 Jul 2026 08:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/speller-metcalfe-posts-record-5m-profit-as-cash-pile-hits-32m/</guid></item><item><title><![CDATA[Four firms land £300m Scottish electricity network deal]]></title><description><![CDATA[Electricty network operator SSEN Distribution has chosen four firms for &pound;300m of work across the north of Scotland over the next five years.<br />
The framework winners are&nbsp;Aureos Energy Ltd, IES Utilities Group Ltd., Ipsum Group and Network Distribution Services Ltd. (NDS).<br />
Work will increase network capacity and strengthen the infrastructure so it can better withstand more extreme conditions, whilst maintaining its unobtrusive presence within the landscape.Conor O&rsquo;Neill, Power Direc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/four-firms-land-300m-scottish-electricity-network-deal/</link><pubDate>Thu, 09 Jul 2026 17:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/four-firms-land-300m-scottish-electricity-network-deal/</guid></item><item><title><![CDATA[Labourer dies after scissor lift fall]]></title><description><![CDATA[A specialist contractor has been fined after a worker died when a series of wall panels collapsed and knocked him from a scissor lift.<br />
Steven Tervit had been carrying out a dismantling operation at a specialist technology centre in Renfrew on 9 November 2022 when the incident happened.<br />
The 32-year-old was employed as a labourer by temperature-controlled building specialist Food Process Engineering Limited and had worked for the company for 15 years.Tervit had been working at a height of around f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/labourer-dies-after-scissor-lift-fall/</link><pubDate>Thu, 09 Jul 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/labourer-dies-after-scissor-lift-fall/</guid></item><item><title><![CDATA[Industry unites to warn new PM against more infrastructure cuts]]></title><description><![CDATA[Construction&rsquo;s biggest names have issued a rare united plea to the incoming Prime Minister not to tear up the Government&rsquo;s &pound;725bn infrastructure strategy.<br />
The open letter from the industry&rsquo;s captains comes amid mounting concern that infrastructure budgets could be raided further following last week&rsquo;s decision to axe two major road schemes to fund greater defence spending<br />
Twenty eight leading contractors, consultants, and institutions signed an open letter calling on]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/industry-unites-to-warn-new-pm-against-more-infrastructure-cuts/</link><pubDate>Thu, 09 Jul 2026 08:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/industry-unites-to-warn-new-pm-against-more-infrastructure-cuts/</guid></item><item><title><![CDATA[Margins hit 4.8% as profits triple at Esh Group]]></title><description><![CDATA[Esh Group has posted the strongest financial performance in the company&rsquo;s history.<br />
The North of England contractor saw pre-tax profits rise to &pound;15m in the year to December 31 2025 &ndash; up from &pound;5m last time with a 4.8% pre-tax margin. Turnover grew by 17% to &pound;311m.<br />
Chief Executive Andy Radcliffe said strong demand from Esh&rsquo;s core markets coupled with its disciplined approach to contract selection, risk management and quality delivery has enabled the Group to deli]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/margins-hit-48-as-profits-triple-at-esh-group/</link><pubDate>Thu, 09 Jul 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/margins-hit-48-as-profits-triple-at-esh-group/</guid></item><item><title><![CDATA[MoD to split £6.6bn military homes maintenance mega deal]]></title><description><![CDATA[The Defence Infrastructure Organisation is planning to split its next-generation military housing maintenance contracts in a move that could reshape bidding for one of the UK&rsquo;s biggest public sector property services deals.<br />
Fresh market engagement documents reveal the Ministry of Defence property arm is considering breaking apart planned maintenance and capital works from day-to-day repairs and maintenance under its &pound;6.6bn programme for Service Family Accommodation.<br />
The proposed chan]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mod-to-split-66bn-military-homes-maintenance-mega-deal/</link><pubDate>Thu, 09 Jul 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mod-to-split-66bn-military-homes-maintenance-mega-deal/</guid></item><item><title><![CDATA[Hampshire council seeks D&amp;B firm for &pound;100m housing job]]></title><description><![CDATA[Eastleigh Borough Council is looking for a design and build contractor to deliver a major house building package at its flagship One Horton Heath development in Hampshire.<br />
The contract is expected to be worth &pound;100m, making it one of the largest local authority housing opportunities currently available.<br />
The job covers the Upper Acre parcel at 310-acre mixed-use development to the east of Eastleigh. This will provide 424 mixed-tenure homes together with roads, utilities, landscaping, public]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hampshire-council-seeks-dampb-firm-for-pound100m-housing-job/</link><pubDate>Thu, 09 Jul 2026 08:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hampshire-council-seeks-dampb-firm-for-pound100m-housing-job/</guid></item><item><title><![CDATA[Funding deal to kick-start Middlewood Locks tower phase]]></title><description><![CDATA[Fresh backing from the National Housing Bank has fired the starting gun on the next high rise residential phase of the &pound;1bn Middlewood Locks regeneration in Salford.<br />
The government-backed funding package will bankroll site preparation, enabling works and detailed design for a 909-home expansion on 10 acres between Salford Central station and Manchester&rsquo;s Spinningfields district.<br />
Joint venture partners Scarborough Group International and Metro Holdings hope to start construction early]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/funding-deal-to-kick-start-middlewood-locks-tower-phase/</link><pubDate>Thu, 09 Jul 2026 08:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/funding-deal-to-kick-start-middlewood-locks-tower-phase/</guid></item><item><title><![CDATA[Battersea job lifts Sisk to top of contracts league]]></title><description><![CDATA[Sisk jumped to the top of the rankings for work won in June on the strength of its &pound;280m residential project for the next phase of the Battersea Power Station redevelopment in London.<br />
The firm will start work this summer on Phase 3C, the final two Frank Gehry-designed buildings that will complete Electric Boulevard.<br />
Balfour Beatty and Morgan Sindall ranked second and third respectively helped by infrastructure new orders.<br />
Balfour picked up a &pound;125m deal for maintenance of the Leeds in]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/battersea-job-lifts-sisk-to-top-of-contracts-league/</link><pubDate>Wed, 08 Jul 2026 09:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/battersea-job-lifts-sisk-to-top-of-contracts-league/</guid></item><item><title><![CDATA[Vistry warns of first-half loss as daily net debt nears £800m]]></title><description><![CDATA[Vistry has warned it will post a first-half loss after driving average daily net debt close to &pound;800m as the partnerships house builder prioritised paying suppliers faster while funding a sweeping balance sheet reset.<br />
The group expects to report a first-half pre-tax loss of around &pound;30m after taking a &pound;50m hit from aggressive cash-generation measures, including deeper sales discounts, accelerated asset sales and write-downs on low-margin sites.<br />
In a half-year trading update, new]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-warns-of-first-half-loss-as-daily-net-debt-nears-800m/</link><pubDate>Wed, 08 Jul 2026 08:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-warns-of-first-half-loss-as-daily-net-debt-nears-800m/</guid></item><item><title><![CDATA[Higgins wins £47m school and flats scheme]]></title><description><![CDATA[Hammersmith &amp; Fulham Council has appointed Higgins Partnerships as main contractor to deliver the &pound;47m rebuild of Avonmore Primary School alongside 91 new homes in Hammersmith.<br />
The new school has been funded by the mixed-tenure homes of which half will be affordable with priority given to eligible local residents to help ensure families can remain in the area.<br />
Designed by BPTW in collaboration with Walter &amp; Cohen, the development will provide 2,297sqm of flexible learning space and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/higgins-wins-47m-school-and-flats-scheme/</link><pubDate>Wed, 08 Jul 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/higgins-wins-47m-school-and-flats-scheme/</guid></item><item><title><![CDATA[Capital&amp;Centric lines up five Rotherham regeneration starts]]></title><description><![CDATA[Capital&amp;Centric has been confirmed as development partner for a major regeneration programme that will reshape five key riverside and town centre sites in Rotherham.<br />
The appointment, approved by Rotherham Metropolitan Borough Council&rsquo;s cabinet, paves the way for the Manchester-based regeneration specialist to prepare detailed proposals for three new residential neighbourhoods and two mixed-use town centre schemes.<br />
The long-term regeneration vision centres on opening up the town&rsquo;s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/capitalampcentric-lines-up-five-rotherham-regeneration-starts/</link><pubDate>Wed, 08 Jul 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/capitalampcentric-lines-up-five-rotherham-regeneration-starts/</guid></item><item><title><![CDATA[Council bosses blast ‘shoddy’ work by failed contractor]]></title><description><![CDATA[Council bosses have hit out at construction standards on a part-completed housing job where the main contractor went into administration.<br />
Westridge Construction went under in September 2023 while building a new seafront council housing development in Southwick, West Sussex.<br />
For the last two years replacement firm Cheesmur Building Contractors has been attempting to rectify construction issues on the 49-home site.Client Adur &amp; Worthing Councils has now confirmed the remediation work will cost]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/council-bosses-blast-shoddy-work-by-failed-contractor/</link><pubDate>Tue, 07 Jul 2026 16:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/council-bosses-blast-shoddy-work-by-failed-contractor/</guid></item><item><title><![CDATA[Balfour Beatty pumps £10m into venture capital tech fund]]></title><description><![CDATA[Balfour Beatty is investing &pound;10m into a venture capital fund focused on technologies transforming the built environment.<br />
The contractor hopes the deal will &ldquo;strengthen Balfour Beatty&rsquo;s access to emerging technologies that could improve productivity, delivery certainty, safety and performance across major infrastructure projects.<br />
The money will go into Pi Labs&rsquo; Fund IV focused on early-stage companies developing solutions across areas including artificial intelligence, dat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-pumps-10m-into-venture-capital-tech-fund/</link><pubDate>Tue, 07 Jul 2026 13:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-pumps-10m-into-venture-capital-tech-fund/</guid></item><item><title><![CDATA[140 homes and aquarium plan for Swansea Civic Centre]]></title><description><![CDATA[Urban Splash has unveiled plans to transform Swansea&rsquo;s vacant Civic Centre into a mixed-use waterfront destination with up to 140 seafront homes, an aquarium, caf&eacute;s, bars and workspace.<br />
The developer has launched a public consultation on proposals to repurpose the landmark Brutalist 1980s civic building ahead of submitting a planning application later this year.<br />
Backed by &pound;20m of UK Government funding and being delivered with Swansea Council, the scheme would retain and refurb]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/140-homes-and-aquarium-plan-for-swansea-civic-centre/</link><pubDate>Tue, 07 Jul 2026 09:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/140-homes-and-aquarium-plan-for-swansea-civic-centre/</guid></item><item><title><![CDATA[HS2 workers left out of pocket after safety shutdown]]></title><description><![CDATA[Self-employed workers on HS2 have been left out of pocket after sites were shut down across the West Midlands when&nbsp;a contractor had to be taken to hospital by air ambulance.<br />
Main contractor Balfour Beatty Vinci decided to stop works at local sites on its 90km section of the line from Long Itchington to Handsacre in Staffordshire following an accident on Thursday 18 June.<br />
A phased restart of works started on June 24 following a review of safety procedures.<br />
But workers have contacted the Enqu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-workers-left-out-of-pocket-after-safety-shutdown/</link><pubDate>Tue, 07 Jul 2026 09:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-workers-left-out-of-pocket-after-safety-shutdown/</guid></item><item><title><![CDATA[Green light for latest Winsford Gateway warehouse]]></title><description><![CDATA[Rula Developments has secured full planning consent to deliver a new 225,000 sq ft logistics building at its 30-acre Winsford Gateway site in Cheshire.<br />
The&nbsp;WG225 scheme will occupy a 14-acre serviced development plot at Winsford Gateway where access works &nbsp;to the site have commenced alongside the construction of WG27 &ndash; a 27,728 sq ft unit forming the new headquarters for floor finishing and interior design business, Saint Group.<br />
Winsford Gateway is located at the north entrance t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-latest-winsford-gateway-warehouse/</link><pubDate>Tue, 07 Jul 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-latest-winsford-gateway-warehouse/</guid></item><item><title><![CDATA[Blue Sky floors tier one rivals in £176m Barbican revamp race]]></title><description><![CDATA[Boutique construction management specialist Blue Sky Building has beaten a trio of London heavyweight contractors to steer the &pound;176m renewal of London&rsquo;s iconic Barbican Centre.<br />
The City of London Corporation selected Blue Sky Building ahead of&nbsp; Bovis, McLaren and Sir Robert McAlpine for the construction management role worth up to &pound;5.1m.<br />
BSB will act as the client&rsquo;s principal delivery partner, managing dozens of trade contractors under separate contracts.The appointm]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/blue-sky-floors-tier-one-rivals-in-176m-barbican-revamp-race/</link><pubDate>Tue, 07 Jul 2026 08:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/blue-sky-floors-tier-one-rivals-in-176m-barbican-revamp-race/</guid></item><item><title><![CDATA[Graham names finance chief as next CEO after bumper year]]></title><description><![CDATA[Graham has promoted finance chief Courtney McCormick to chief executive after posting record results that saw turnover break through the &pound;1.2bn mark for the first time.<br />
McCormick, who has served as group chief financial officer for the past 12 years, will take over on 1 September following the retirement of long-serving chief executive Andrew Bill after more than 40 years with the business.<br />
The leadership handover comes as the privately-owned contractor reported revenue up 16% to &pound;1.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-names-finance-chief-as-next-ceo-after-bumper-year/</link><pubDate>Mon, 06 Jul 2026 23:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-names-finance-chief-as-next-ceo-after-bumper-year/</guid></item><item><title><![CDATA[Buyers report sharpest fall in civils work for six years]]></title><description><![CDATA[Construction buyers have reported the biggest fall in civil engineering work since since April 2020.<br />
The news will be another blow for contractors still reeling from government plans to scrap road schemes to pay for increased defence spending.<br />
The latest bellwether S&amp;P Global UK Construction Purchasing Managers&rsquo; Index registered 38.4 in June, up slightly from May&rsquo;s six-year low of 38.2 but still well below the neutral 50.0 value.Construction output has decreased in each month sin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/buyers-report-sharpest-fall-in-civils-work-for-six-years/</link><pubDate>Mon, 06 Jul 2026 12:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/buyers-report-sharpest-fall-in-civils-work-for-six-years/</guid></item><item><title><![CDATA[Loan unlocks offices to student accommodation deal]]></title><description><![CDATA[A &pound;113m loan has been agreed to finance the transformation of 450,000 square feet of vacant London office space into 1,085 student beds in the Royal Docks.<br />
Firma Partners has provided funding to DPK Group for the conversion of the Royal Albert Dock office complex in East London into a Purpose Built Student Accommodation (PBSA) scheme with a GDV of &pound;300m.<br />
The loan will finance refurbishment of 20 buildings at the riverfront Docklands site which were originally constructed by Brookfiel]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/loan-unlocks-offices-to-student-accommodation-deal/</link><pubDate>Mon, 06 Jul 2026 09:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/loan-unlocks-offices-to-student-accommodation-deal/</guid></item><item><title><![CDATA[McLaren employs robot army for site quality checks]]></title><description><![CDATA[McLaren Construction has agreed a partnership with FieldAI to bring general-purpose robots to its UK construction sites.<br />
McLaren will deploy autonomous quadruped robots initially to capture 360&deg; site imagery, generate data and support safety compliance patrols and quality assurance.<br />
Regular automated scans by FieldAI&nbsp;robots will create a visual and spatial record of work as it is installed.AI-enabled analysis will compare site data against the design model, reducing the time between ins]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-employs-robot-army-for-site-quality-checks/</link><pubDate>Mon, 06 Jul 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-employs-robot-army-for-site-quality-checks/</guid></item><item><title><![CDATA[McLaren employs robot army for for site quality checks]]></title><description><![CDATA[McLaren Construction has agreed a partnership with FieldAI to bring general-purpose robots to its UK construction sites.<br />
McLaren will deploy autonomous quadruped robots initially to capture 360&deg; site imagery, generate data and support safety compliance patrols and quality assurance.<br />
Regular automated scans by FieldAI&nbsp;robots will create a visual and spatial record of work as it is installed.AI-enabled analysis will compare site data against the design model, reducing the time between ins]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-employs-robot-army-for-for-site-quality-checks/</link><pubDate>Mon, 06 Jul 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-employs-robot-army-for-for-site-quality-checks/</guid></item><item><title><![CDATA[Final segment installed at problem HS2 green tunnel]]></title><description><![CDATA[The last of 5,020 reinforced concrete segments has been lifted into position at an HS2 cut and cover tunnel plagued by construction problems.<br />
The milestone was reached on the Chipping Warden Green Tunnel in Northamptonshire where faults were found in 2022 in precast concrete segments.<br />
With the pre-cast wall installation finished, the construction team are now focused on completing the waterproofing and internal floor slab and all other internal works, including the emergency walkways that will r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/final-segment-installed-at-problem-hs2-green-tunnel/</link><pubDate>Mon, 06 Jul 2026 08:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/final-segment-installed-at-problem-hs2-green-tunnel/</guid></item><item><title><![CDATA[Morris &amp; Spottiswood storms &pound;230m turnover barrier]]></title><description><![CDATA[Fit-out and refurbishment contractor Morris &amp; Spottiswood delivered another record year after landing more framework work and expanding deeper into southern England.<br />
Revenue climbed by around a third to &pound;231m in the year to December 2025, while pre-tax profit leaped nearly a half to &pound;6.9m as the contractor extended a remarkable growth run that has seen sales soar 125% in three years.<br />
The Glasgow-based group, which is in its centenary year, said growth was driven by repeat busines]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morris-amp-spottiswood-storms-pound230m-turnover-barrier/</link><pubDate>Mon, 06 Jul 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morris-amp-spottiswood-storms-pound230m-turnover-barrier/</guid></item><item><title><![CDATA[Morganstone lands key role in Port Talbot steelworks revival]]></title><description><![CDATA[Tata Steel UK has picked Swansea civils firm Morganstone to deliver the first major construction package on its Project Invictus transformation at the Port Talbot steelworks.<br />
Morganstone will carry out the civil and structural works for the new Pickle Line. This process section will support new pickling and rinse tanks used to remove mill scale from hot rolled steel before it is cold rolled.<br />
The deal marks the shift from demolition and enabling works into full construction on the processing line]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morganstone-lands-key-role-in-port-talbot-steelworks-revival/</link><pubDate>Mon, 06 Jul 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morganstone-lands-key-role-in-port-talbot-steelworks-revival/</guid></item><item><title><![CDATA[Battle starts for places on £250m animal labs framework refresh]]></title><description><![CDATA[Ten contractors and nine consultants face a battle to retain places on a &pound;250m refresh of construction partners for the Animal and Plant Health Agency&rsquo;s flagship science campus at Weybridge, Surrey.<br />
Defra has launched early market engagement for its new Science Estates Delivery Framework, which will replace the existing APHA framework supporting one of the country&rsquo;s most technically demanding construction programmes.<br />
Current framework holders include contractors Kier, Sisk, Wil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/battle-starts-for-places-on-250m-animal-labs-framework-refresh/</link><pubDate>Mon, 06 Jul 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/battle-starts-for-places-on-250m-animal-labs-framework-refresh/</guid></item><item><title><![CDATA[HS2 work paused after serious site accident]]></title><description><![CDATA[Construction work has now resumed at HS2 sites across the West Midlands after a contractor had to be taken to hospital by air ambulance.<br />
Kenilworth Nub News reported that emergency services were called to the North Warwickshire site on Thursday 18 June, at around 5.20pm after a 44-year-old man was hit by a vehicle and injured his leg.<br />
He was airlifted to hospital to receive treatment and has since been discharged and is recovering at home.HS2 said it is continuing to support him and his family.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-work-paused-after-serious-site-accident/</link><pubDate>Fri, 03 Jul 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-work-paused-after-serious-site-accident/</guid></item><item><title><![CDATA[Kier lands ECI roles on £500m worth of Southern Water jobs]]></title><description><![CDATA[Kier has strengthened its position on Southern Water&rsquo;s AMP8 programme after securing two more early contractor involvement commissions with a potential construction value that takes its workload with the utility to nearly &pound;500m.<br />
The latest Stage 1 ECI awards cover the Hastings Resilience programme and the Brighton East nitrate removal scheme under Southern Water&rsquo;s &pound;3.1bn Strategic Delivery Partner framework.<br />
Kier is now working on 31 ECI projects for Southern Water worth]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-eci-roles-on-500m-worth-of-southern-water-jobs/</link><pubDate>Fri, 03 Jul 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-eci-roles-on-500m-worth-of-southern-water-jobs/</guid></item><item><title><![CDATA[Ministers clear sewage works deadlock stalling 18,000 homes]]></title><description><![CDATA[The Government has stepped in to unblock construction of almost 20,000 homes after brokering a breakthrough deal with Anglian Water to overcome wastewater capacity constraints that had stalled major developments across the East of England.<br />
The intervention by the Water Delivery Taskforce clears the way for more than 18,000 homes by replacing a planning stand-off with a phased infrastructure strategy allowing housing and utility upgrades to progress together.<br />
Anglian Water had objected to several]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ministers-clear-sewage-works-deadlock-stalling-18000-homes/</link><pubDate>Fri, 03 Jul 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ministers-clear-sewage-works-deadlock-stalling-18000-homes/</guid></item><item><title><![CDATA[Northern Trains race for £300m depots and stations works]]></title><description><![CDATA[Northern Trains is preparing to launch a &pound;300m construction framework covering infrastructure upgrades across its network of 22 train care depots and more than 470 stations.<br />
The eight-year framework will run from March 2027, with an initial five-year term and an option to extend to 2035.<br />
It will create a long-term supply chain to deliver everything from building refurbishments and depot fit-outs to major civils, M&amp;E, track, electrification and signalling schemes needed to support exist]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/northern-trains-race-for-300m-depots-and-stations-works/</link><pubDate>Fri, 03 Jul 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/northern-trains-race-for-300m-depots-and-stations-works/</guid></item><item><title><![CDATA[Northern Trains race for £300m depots and stations work]]></title><description><![CDATA[Northern Trains is preparing to launch a &pound;300m construction framework covering infrastructure upgrades across its network of 22 train care depots and more than 470 stations.<br />
The eight-year framework will run from March 2027, with an initial five-year term and an option to extend to 2035.<br />
It will create a long-term supply chain to deliver everything from building refurbishments and depot fit-outs to major civils, M&amp;E, track, electrification and signalling schemes needed to support exist]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/northern-trains-race-for-300m-depots-and-stations-work/</link><pubDate>Fri, 03 Jul 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/northern-trains-race-for-300m-depots-and-stations-work/</guid></item><item><title><![CDATA[Green light for Albert Buildings refurb]]></title><description><![CDATA[Planning consent has been granted for the refurbishment of the Grade II-listed Victorian Albert Buildings in the heart of the City of London.<br />
Plans by Emrys Architects will transform the building into a mixed-use destination comprising 39 serviced apartment units above retained retail and restaurant space including the famous Sweetings.<br />
Construction is set to start in August 2027 with no contractor yet confirmed for the work.The scheme has been developed through close engagement with the City of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-albert-buildings-refurb/</link><pubDate>Thu, 02 Jul 2026 23:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-albert-buildings-refurb/</guid></item><item><title><![CDATA[Groundworks firm Mackoy went under owing suppliers £5.5m]]></title><description><![CDATA[Groundworks contractor Mackoy Limited went into administration owing subcontractors and suppliers nearly &pound;5.5m.<br />
The scale of the &pound;23m-turnover firm&rsquo;s debts across its supply chain was revealed in a Companies House update by administrator Quantuma.<br />
Mackoy went down last month and was then sold&nbsp;out of administration in a pre-pack deal to Geocore Civils Limited saving 20 jobs.Geocore Civils Limited was established on May 12 by directors Benjamin Bousfield and Michael Mayock.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/groundworks-firm-mackoy-went-under-owing-suppliers-55m/</link><pubDate>Thu, 02 Jul 2026 15:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/groundworks-firm-mackoy-went-under-owing-suppliers-55m/</guid></item><item><title><![CDATA[Lendlease and The Crown Estate finalise £24bn development JV]]></title><description><![CDATA[Lendlease and The Crown Estate have completed their long-awaited &pound;24bn regeneration joint venture, paving the way for construction to begin on a pipeline of major housing and commercial developments in London and Birmingham.<br />
The new vehicle, branded the Impact Partnership Joint Venture, will initially take control of the Euston, Silvertown and Stratford Cross regeneration schemes, with a dedicated development management company established to oversee delivery.<br />
Together the first three proj]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lendlease-and-the-crown-estate-finalise-24bn-development-jv/</link><pubDate>Thu, 02 Jul 2026 09:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lendlease-and-the-crown-estate-finalise-24bn-development-jv/</guid></item><item><title><![CDATA[Laing O’Rourke joins bid for 14-reactor UK SMR fleet]]></title><description><![CDATA[Laing O&rsquo;Rourke has joined an international consortium bidding to deliver a fleet of 14 small modular nuclear reactors across three UK sites.<br />
Warsaw-based developer SGE has submitted plans under the Government&rsquo;s Advanced Nuclear Framework for a 4.2GW programme based on GE Vernova Hitachi&rsquo;s BWRX-300 reactor technology.<br />
The privately-funded scheme would be Britain&rsquo;s largest privately-led nuclear investment and could generate enough electricity to meet around 11% of the count]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-joins-bid-for-14-reactor-uk-smr-fleet/</link><pubDate>Thu, 02 Jul 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-joins-bid-for-14-reactor-uk-smr-fleet/</guid></item><item><title><![CDATA[Right-to-work checks for self-employed start in October]]></title><description><![CDATA[The government has confirmed an October 1 start date for Right to Work checks on the self-employed with construction singled out by a minister as a &ldquo;high-risk sector&rdquo; targeted by Home Office activity.<br />
Home Office minister Alex Norris said: &ldquo;The reforms introduce, for the first time, an extension of the Right to Work Scheme and the associated civil penalties for non-compliance, to cover companies who contract workers or individual subcontractors to provide services under their c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/right-to-work-checks-for-self-employed-start-in-october/</link><pubDate>Thu, 02 Jul 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/right-to-work-checks-for-self-employed-start-in-october/</guid></item><item><title><![CDATA[Record order book fires Phoenix ME towards £400m turnover]]></title><description><![CDATA[London M&amp;E specialist Phoenix ME has set its sights on &pound;400m turnover this year after posting sharply higher profits and securing its biggest-ever forward order book.<br />
Revenue for the year to 30 September 2025 climbed 8% to &pound;319m, while pre-tax profit surged 55% to &pound;17m as improved project margins and tighter cost control boosted performance.<br />
This saw operating group margin hit 5% up from 3.5% in the prior year, while revenue expansion saw headcount rise by 12% to 469 during]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/record-order-book-fires-phoenix-me-towards-400m-turnover/</link><pubDate>Thu, 02 Jul 2026 08:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/record-order-book-fires-phoenix-me-towards-400m-turnover/</guid></item><item><title><![CDATA[Hill plots £2.3bn growth drive after resilient results]]></title><description><![CDATA[South East developer The Hill Group has unveiled a five-year growth plan to more than double turnover to &pound;2.3bn by 2030 after posting another year of resilient trading despite subdued housing market conditions.<br />
The UK&rsquo;s second largest privately-owned house builder lifted revenue to &pound;1.16bn in the year to 31 March 2026 from &pound;1.15bn previously, while pre-tax profit increased to &pound;93m from &pound;91m.<br />
Housing completions jumped 18% to 3,329 homes from 2,811 a year earli]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-plots-23bn-growth-drive-after-resilient-results/</link><pubDate>Thu, 02 Jul 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-plots-23bn-growth-drive-after-resilient-results/</guid></item><item><title><![CDATA[Construction site deaths fall to 25]]></title><description><![CDATA[Latest figures from the Health and Safety Executive reveal that 25 construction workers died following accidents during the year to March 31 2026.<br />
The figure is a significant decrease on the previous year&rsquo;s total of 35 and the five-year average for fatal injuries in the sector which stands at 37.<br />
Construction again accounted for the largest number of fatal accidents across all industries with the total death toll standing at 126 during the year.The most common cause of fatal injuries conti]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-site-deaths-fall-to-25/</link><pubDate>Wed, 01 Jul 2026 15:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-site-deaths-fall-to-25/</guid></item><item><title><![CDATA[Vinci wins contract for Liverpool Pall Mall scheme]]></title><description><![CDATA[Joint developers Liverpool City Council and Kier Property have chosen VINCI Construction as the design and build partner for the first &pound;55m phase of the Pall Mall scheme following a two-stage tender process.<br />
The development will deliver office space alongside ground-floor retail and a new 0.5 acre greenspace.<br />
Liverpool City Council is working with Kier Property to bring forward the first phase of the scheme, which forms part of a wider masterplan set to transform the Pall Mall area into a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vinci-wins-contract-for-liverpool-pall-mall-scheme/</link><pubDate>Wed, 01 Jul 2026 13:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vinci-wins-contract-for-liverpool-pall-mall-scheme/</guid></item><item><title><![CDATA[12 roofing firms named in ongoing bid-rigging probe]]></title><description><![CDATA[The Competition and Markets Authority has named the dozen businesses under investigation as part of its long-running probe into suspected bid-rigging in the supply of roofing and other construction services.<br />
The cartel watchdog first launched its probe in December 2024 over suspected anti-competitive arrangements linked to roofing work for schools applying to the Department for Education&rsquo;s Condition Improvement Fund.<br />
It has now confirmed the businesses currently under investigation are:AMR]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/12-roofing-firms-named-in-ongoing-bid-rigging-probe/</link><pubDate>Wed, 01 Jul 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/12-roofing-firms-named-in-ongoing-bid-rigging-probe/</guid></item><item><title><![CDATA[Steelwork specialist Barretts of Aspley ceases trading]]></title><description><![CDATA[Steelwork contractor Barretts of Aspley has ceased trading after four consecutive years of operating losses.<br />
The Milton Keynes-based business employed more than 50 staff and specialised in structural steelwork, architectural metalwork and balcony packages from its 100,000 sq ft fabrication facility on a 12-acre site.<br />
The firm traced its roots back more than 30 years, supplying steel-framed buildings before expanding into major commercial, regeneration and residential projects, delivering structu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/steelwork-specialist-barretts-of-aspley-ceases-trading/</link><pubDate>Wed, 01 Jul 2026 08:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/steelwork-specialist-barretts-of-aspley-ceases-trading/</guid></item><item><title><![CDATA[Eight picked for National Grid’s £640m cable programme]]></title><description><![CDATA[National Grid has picked eight contractors for a potential &pound;640m framework to install 66kV and 132kV electricity cables across its transmission and distribution networks.<br />
The one-year framework, with an option to extend for a further 12 months, will support cable installation work for National Grid Electricity Transmission and its electricity distribution businesses across the East Midlands, West Midlands, South West and South Wales.<br />
The successful firms are:Balfour Beatty Utility Solution]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/eight-picked-for-national-grids-640m-cable-programme/</link><pubDate>Wed, 01 Jul 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/eight-picked-for-national-grids-640m-cable-programme/</guid></item><item><title><![CDATA[Kelly Formwork lands £4m deal from Skanska]]></title><description><![CDATA[Kelly Formwork has strengthened its position in the UK infrastructure market after securing the A47/A11 Thickthorn Junction upgrade in Norfolk with Skanska.<br />
The &pound;4m job starts this month and is&nbsp;aimed at improving connectivity and reducing congestion on one of the region&rsquo;s busiest strategic road networks.<br />
Skanska&rsquo;s scope includes a 1.6km free-flow link road connecting the A11 northbound to the A47 eastbound via two new underpasses, together with a further 1km local link roa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kelly-formwork-lands-4m-deal-from-skanska/</link><pubDate>Tue, 30 Jun 2026 18:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kelly-formwork-lands-4m-deal-from-skanska/</guid></item><item><title><![CDATA[ISG school to be demolished over structural issues]]></title><description><![CDATA[A new school building partially completed by ISG company ESS Modular has been condemned after an inspection by Kier.<br />
The new home for Matford Brook Academy in Exeter was left unfinished when ISG went into administration in September 2024.<br />
Pupils have been taught since in a&nbsp; series of temporary building while Kier was called in earlier this year to assess the state of the new permanent building.Kier&rsquo;s report to the Department for Education found found the building does not meet the req]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/isg-school-to-be-demolished-over-structural-issues/</link><pubDate>Tue, 30 Jun 2026 15:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/isg-school-to-be-demolished-over-structural-issues/</guid></item><item><title><![CDATA[Road schemes to be scrapped to pay for better defence]]></title><description><![CDATA[Transport and energy projects will be scrapped to help pay for a &pound;15bn boost to defence spending unveiled by Kier Starmer on Tuesday.<br />
The Prime Minister said: &ldquo;Some capital projects &ndash; for example on roads and energy, which are important, but not immediately vital will no longer go ahead as planned.&rdquo;<br />
Starmer said the extra defence spending would be funded by &ldquo;reallocating spending from across government departments &ndash; reallocating capital budgets by one penny in]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/road-schemes-to-be-scrapped-to-pay-for-better-defence/</link><pubDate>Tue, 30 Jun 2026 14:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/road-schemes-to-be-scrapped-to-pay-for-better-defence/</guid></item><item><title><![CDATA[AJC Group lands £24m Bournemouth scheme]]></title><description><![CDATA[AJC Group has been appointed to deliver a &pound;23.9m regeneration scheme in the Boscombe suburb of Bournemouth.<br />
The Poole-based contractor has been awarded both phases of the landmark Hawkwood Road development on behalf of Bournemouth, Christchurch and Poole (BCP) Council.<br />
Phase one will include a new two-storey community centre, four retail kiosks and a new pedestrian link alongside associated landscaping, drainage and community space improvements.Phase two will see the construction of 68 res]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ajc-group-lands-24m-bournemouth-scheme/</link><pubDate>Tue, 30 Jun 2026 12:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ajc-group-lands-24m-bournemouth-scheme/</guid></item><item><title><![CDATA[M Group storms into UK contractor top four]]></title><description><![CDATA[M Group has smashed through the &pound;3bn turnover mark to become the UK&rsquo;s fourth biggest contractor after a year of strong growth and acquisitions.<br />
The growth spurt puts the private equity-backed infrastructure services giant behind only Balfour Beatty, Morgan Sindall and Kier in the UK contractor rankings.<br />
Revenue climbed 23% to &pound;3.1bn in the year to 31 March while EBITDA before exceptional items surged 40% to &pound;218m from &pound;156m.Across the group, EBITDA margin also impro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/m-group-storms-into-uk-contractor-top-four/</link><pubDate>Tue, 30 Jun 2026 09:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/m-group-storms-into-uk-contractor-top-four/</guid></item><item><title><![CDATA[New boss to lead Balfour major projects arm]]></title><description><![CDATA[Balfour Beatty has announced the appointment of Angus Murray as Managing Director of its UK Major Projects business.<br />
Murray will start his new role in September overseeing a portfolio of projects including Hinkley Point C and Net Zero Teesside.<br />
He will also lead Balfour Beatty&rsquo;s engagement in emerging complex infrastructure markets, including Small Modular Reactors and the UK reservoir programme.Murray most recently served as Chief Executive of Connect Plus, the 30-year consortium that inc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/new-boss-to-lead-balfour-major-projects-arm/</link><pubDate>Tue, 30 Jun 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/new-boss-to-lead-balfour-major-projects-arm/</guid></item><item><title><![CDATA[BAM bags first civils package on giant EGL3 link]]></title><description><![CDATA[BAM has secured the first civils package for the northern converter station on the proposed Eastern Green Link 3 power cable project.<br />
The contractor has signed an early contractor involvement deal with SSEN Transmission for design and buildability support on the Peterhead site in Aberdeenshire.<br />
EGL3 is being developed by SSEN Transmission and National Grid Electricity Transmission and is billed as the UK&rsquo;s biggest ever electricity transmission project.The 2GW, 525kV high-voltage direct cur]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bam-bags-first-civils-package-on-giant-egl3-link/</link><pubDate>Tue, 30 Jun 2026 08:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bam-bags-first-civils-package-on-giant-egl3-link/</guid></item><item><title><![CDATA[Stepnell builds profit as turnover hits £150m]]></title><description><![CDATA[Stepnell is forecasting further growth this year after lifting turnover by a third and nearly tripling profit.<br />
The family-owned Rugby contractor saw turnover rise to &pound;150m in the year to March 2026 from &pound;113m last time.<br />
Pre-tax profit climbed to &pound;2.8m from &pound;1m, while cash in the business rose sharply to &pound;21m.Chief executive Tom Wakeford said: &ldquo;We are pleased with our significantly improved performance in difficult market conditions, notably the increase in pro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/stepnell-builds-profit-as-turnover-hits-150m/</link><pubDate>Tue, 30 Jun 2026 07:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/stepnell-builds-profit-as-turnover-hits-150m/</guid></item><item><title><![CDATA[Fleet up for sale as plant hire boss retires]]></title><description><![CDATA[Euro Auctions is hosting an online sale of the entire fleet formerly run by Kent-based Skelton Plant Hire following the owners&rsquo; decision to retire from the industry.<br />
The sale will offer contractors, plant hire businesses, builders, groundworkers and equipment buyers the opportunity to acquire a substantial fleet of fresh, low-hour machinery and commercial vehicles direct from one of the South East&rsquo;s leading operators.<br />
The online auction takes place on Thursday 2 July. Much of the equ]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fleet-up-for-sale-as-plant-hire-boss-retires/</link><pubDate>Mon, 29 Jun 2026 16:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fleet-up-for-sale-as-plant-hire-boss-retires/</guid></item><item><title><![CDATA[Investment giant DWS buys stake in Flannery Plant Hire]]></title><description><![CDATA[Asset manager DWS has completed the acquisition of an interest in Flannery Plant Hire.<br />
The Flannery family has retained a significant interest alongside DWS, and Patrick and Martin Flannery will continue to lead the business as joint CEOs.<br />
The deal will support the next phase of growth for the business as it continues to provide services to major infrastructure projects.Flannery is the largest operated heavy construction plant-hire company in the UK, combining the lease of large-scale specialist]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/investment-giant-dws-buys-stake-in-flannery-plant-hire/</link><pubDate>Mon, 29 Jun 2026 13:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/investment-giant-dws-buys-stake-in-flannery-plant-hire/</guid></item><item><title><![CDATA[National Highways axes Skanska’s £300m A46 Newark bypass]]></title><description><![CDATA[National Highways has cancelled its contract with Skanska to advance the long-delayed A46 Newark Bypass project in the East Midlands.<br />
Skanska announced the cancellation of the &pound;297m contract this morning by National Highways, warning it adversely impacted the Swedish group&rsquo;s order book in the second quarter.<br />
The scheme to dual 6.5km of the A46 received development consent late last year but no timetable for the project&rsquo;s start has been released.Subcontractors had been pricing w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/national-highways-axes-skanskas-300m-a46-newark-bypass/</link><pubDate>Mon, 29 Jun 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/national-highways-axes-skanskas-300m-a46-newark-bypass/</guid></item><item><title><![CDATA[Highways chiefs axe Skanska’s £300m A46 Newark bypass contract]]></title><description><![CDATA[National Highways has cancelled its contract with Skanska to advance the long-delayed A46 Newark Bypass project in the East Midlands.<br />
Skanska announced the cancellation of the &pound;297m contract this morning by National Highways, warning it adversely impacted the Swedish group&rsquo;s order book in the second quarter.<br />
The scheme to dual 6.5km of the A46 received development consent late last year but no timetable for the project&rsquo;s start has been released.Subcontractors had been pricing w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/highways-chiefs-axe-skanskas-300m-a46-newark-bypass-contract/</link><pubDate>Mon, 29 Jun 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/highways-chiefs-axe-skanskas-300m-a46-newark-bypass-contract/</guid></item><item><title><![CDATA[Skanska gets start date for 55 Old Broad Street]]></title><description><![CDATA[Skanska will start main construction work at 55 Old Broad Street in the City of London in October under a &pound;282m deal.<br />
Work is due for completion in 2029 and will create around 270,000 sq ft of high-quality office accommodation across 23 storeys, alongside retail space and public realm at ground level.<br />
The former Landsec scheme had been on hold but private equity real estate firm AshbyCapital is taking the project forward with Landsec retaining a role as development manager.Skanska&rsquo;s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/skanska-gets-start-date-for-55-old-broad-street/</link><pubDate>Mon, 29 Jun 2026 08:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/skanska-gets-start-date-for-55-old-broad-street/</guid></item><item><title><![CDATA[Fusion plans 39-storey Manchester student tower]]></title><description><![CDATA[Fusion Student has lodged plans to finally develop a long-stalled Manchester city centre tower site.<br />
The developer wants to build a 39-storey, 818-bed student scheme at 10-12 Whitworth Street West, close to Deansgate Locks.<br />
Domis Construction is advising the client for planning, drawing up the construction and logistics plan for the job, while Gardiner &amp; Theobald is on board as cost manager. Consultant Amber is MEP engineer with Shear Design providing structural design.<br />
The vacant plot has a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fusion-plans-39-storey-manchester-student-tower/</link><pubDate>Mon, 29 Jun 2026 08:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fusion-plans-39-storey-manchester-student-tower/</guid></item><item><title><![CDATA[HS2 reset hinges on contractor deals and £8bn Euston plan]]></title><description><![CDATA[Transport chiefs have been warned that HS2&rsquo;s latest reset will fail unless they get a grip on contractor negotiations and nail down Euston plans.<br />
A National Audit Office report said the Department for Transport and HS2 Ltd are making progress on the overhaul.<br />
But the watchdog warned major risks remain around commercial deals, cost control, delivery skills and the unresolved London terminus.<br />
DfT now estimates HS2 will cost between &pound;88bn and &pound;103bn to complete &mdash; around doub]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-reset-hinges-on-contractor-deals-and-8bn-euston-plan/</link><pubDate>Mon, 29 Jun 2026 08:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-reset-hinges-on-contractor-deals-and-8bn-euston-plan/</guid></item><item><title><![CDATA[SCF starts hunt for £2bn+ framework contractors]]></title><description><![CDATA[The tender race has started for contractors to join Southern Construction Framework&rsquo;s (SCF&rsquo;s) sixth generation (SCF6) deal.<br />
The current framework delivers around &pound;500m of projects a year across London, the South East and the South West and the new deal will run for an initial four years from May 2027.<br />
Delivered jointly by Hampshire and Devon County Councils, since its inception in 2006, SCF has supported the delivery of &pound;10bn of public sector construction projects.SCF6 wi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scf-starts-hunt-for-2bn-framework-contractors/</link><pubDate>Fri, 26 Jun 2026 18:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scf-starts-hunt-for-2bn-framework-contractors/</guid></item><item><title><![CDATA[HS2 contractors fined £400,000 after tipper truck fall]]></title><description><![CDATA[A joint venture working on HS2 has been fined &pound;400,000 after the driver of a 20-tonne tipper truck was injured when his vehicle fell off the edge of an excavation ramp.<br />
The incident happened on 27 July 2021, at a site in Copthall North near Uxbridge, West London.<br />
The site was being run by SCS Railways, a joint venture of Skanska Construction UK Limited, Costain Limited and Strabag AG.The tipper truck fell approximately two metres and landed on the driver&rsquo;s side. The man behind the wh]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-contractors-fined-400000-after-tipper-truck-fall/</link><pubDate>Fri, 26 Jun 2026 14:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-contractors-fined-400000-after-tipper-truck-fall/</guid></item><item><title><![CDATA[Scottish ministers halt £2.1bn Laing O’Rourke hospital job]]></title><description><![CDATA[Health chiefs have been sent back to the drawing board on plans for Laing O&rsquo;Rourke to build a &pound;2.1bn replacement for Monklands Hospital after ministers refused to sign off the scheme over affordability concerns.<br />
Scottish health secretary Angela Constance said the proposed new hospital at Wester Moffat, near Airdrie, failed to represent value for money and ordered a &ldquo;comprehensive redesign&rdquo; of the project.<br />
The decision throws fresh uncertainty over the programme and is lik]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scottish-ministers-halt-21bn-laing-orourke-hospital-job/</link><pubDate>Fri, 26 Jun 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scottish-ministers-halt-21bn-laing-orourke-hospital-job/</guid></item><item><title><![CDATA[Ministers fail to plug imported fabricated steel tariff gap]]></title><description><![CDATA[The Government has stopped short of closing a controversial loophole in its new steel tariff regime, prompting warnings that cheap imported fabricated steelwork will flood the UK market and put thousands of jobs at risk.<br />
Ministers yesterday confirmed the final shape of the new safeguard measures ahead of their introduction on 1 July, after weeks of lobbying from the construction and fabrication sectors.<br />
Under the plans, imported steel sections will face quotas and tariffs, but fabricated steelwo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ministers-fail-to-plug-imported-fabricated-steel-tariff-gap/</link><pubDate>Fri, 26 Jun 2026 09:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ministers-fail-to-plug-imported-fabricated-steel-tariff-gap/</guid></item><item><title><![CDATA[Hinkley M&amp;E dispute leaves hundreds off site for three weeks]]></title><description><![CDATA[M&amp;E works at the Hinkley Point C nuclear project have been disrupted for over three weeks after a workforce dispute spiralled into a stand-off that saw hundreds of operatives sent home.<br />
The disruption was triggered when workers staged a sit-in protest on 2 June over safety concerns about new clocking-in stations, moved further into the job and away from canteens. Workers claimed the new clocking stations were dangerously close to a crane-lift zone which is denied by management.<br />
Project bosse]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hinkley-mampe-dispute-leaves-hundreds-off-site-for-three-weeks/</link><pubDate>Fri, 26 Jun 2026 08:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hinkley-mampe-dispute-leaves-hundreds-off-site-for-three-weeks/</guid></item><item><title><![CDATA[Glasgow green lights 25-storey student tower]]></title><description><![CDATA[A 25-storey student tower has won planning approval as developers press ahead with the &pound;250m transformation of a key Glasgow city centre gateway site.<br />
Developer CXG Glasgow has secured detailed consent for a 620-bed purpose-built student accommodation block at Elmbank Gardens, marking the first phase of the wider Charing Cross Gateway masterplan.<br />
Designed by Michael Laird Architects, the tower will rise on the corner of Bath Street and Newton Street as part of a mixed-use redevelopment tha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/glasgow-green-lights-25-storey-student-tower/</link><pubDate>Thu, 25 Jun 2026 23:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/glasgow-green-lights-25-storey-student-tower/</guid></item><item><title><![CDATA[Kier promotes finance chief to head highways business]]></title><description><![CDATA[Kier has promoted company veteran Barry Jupp to run its highways business as it looks to strengthen its grip on the roads market.<br />
Jupp steps into the managing director role on 1 July, taking charge of a 2,000-strong operation delivering highway construction and maintenance work across local authority and strategic road networks.<br />
The appointment crowns more than 23 years with Kier, where Jupp has risen through a string of leadership roles, most recently as finance director for its transportation]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-promotes-finance-chief-to-head-highways-business/</link><pubDate>Thu, 25 Jun 2026 22:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-promotes-finance-chief-to-head-highways-business/</guid></item><item><title><![CDATA[New boss takes charge at £118m revenue Barnwood]]></title><description><![CDATA[Regional building contractor Barnwood has promoted finance director Matthew Williams to group chief executive in a planned succession move at the &pound;118m turnover business.<br />
The 40-year-old takes over after a decade with the Gloucestershire contractor, replacing Simon Carey, who becomes group chairman after leading the firm since 2004.<br />
Employee Ownership Trust-backed Barnwood employs 230 people across its Construction, Shopfitting &amp; Interiors and General Works divisions and delivered more]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/new-boss-takes-charge-at-118m-revenue-barnwood/</link><pubDate>Thu, 25 Jun 2026 21:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/new-boss-takes-charge-at-118m-revenue-barnwood/</guid></item><item><title><![CDATA[Labourer falls to death through window opening]]></title><description><![CDATA[A contractor&nbsp; has been fined &pound;50,000 after one of its employees was killed when he fell through an unglazed window opening.<br />
Antonio Rodrigues, 55, had been working as a labourer for Lima Construction Limited on a project to redevelop a former department store on the High Street in New Malden, into a mixture of commercial and residential units.<br />
On 27 July 2022, Rodrigues fell from an external scaffolding platform through an unglazed window void, landing on an internal concrete ground f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/labourer-falls-to-death-through-window-opening/</link><pubDate>Thu, 25 Jun 2026 14:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/labourer-falls-to-death-through-window-opening/</guid></item><item><title><![CDATA[CField lands £176m Fusion student housing double]]></title><description><![CDATA[CField Construction has secured &pound;176m of work from developer Fusion Group to deliver two major student accommodation projects in London and Glasgow.<br />
The contracts will see CField build a combined 1,269 purpose-built student beds and 79 affordable homes, with both developments due to open for the 2028 academic year.The biggest award is a &pound;97m mixed-use scheme at Wood Green in north London. The project comprises a 636-bed PBSA block alongside 79 affordable homes and new public realm ar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cfield-lands-176m-fusion-student-housing-double/</link><pubDate>Thu, 25 Jun 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cfield-lands-176m-fusion-student-housing-double/</guid></item><item><title><![CDATA[Developer hunt for London iconic meat and fish markets rebuild]]></title><description><![CDATA[The Greater London Authority has launched a hunt for a development partner to deliver a &pound;220m rebuild of London&rsquo;s historic Billingsgate and Smithfield markets at the Royal Docks.<br />
GLA Land and Property has started market testing for the redevelopment of the 25-acre Albert Island site in Newham, where the capital&rsquo;s iconic fish and meat markets are set to relocate.<br />
The winning team will work alongside the City of London Corporation to build around 300,000 sq ft of new wholesale ma]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/developer-hunt-for-london-iconic-meat-and-fish-markets-rebuild/</link><pubDate>Thu, 25 Jun 2026 08:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/developer-hunt-for-london-iconic-meat-and-fish-markets-rebuild/</guid></item><item><title><![CDATA[Fresh inflation storm gathers over construction]]></title><description><![CDATA[Construction firms are bracing for another bout of price inflation as high oil prices, steel tariffs and carbon taxes combine to push up project costs over the next two years.<br />
Consultant Arcadis has increased the upper end of its previously already high tender price inflation forecasts for 2026 and 2027 by one percentage point to reflect the risk of Gulf-driven inflation following the recent Iran conflict.<br />
The biggest pain is expected to hit infrastructure projects, where higher oil prices feed]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fresh-inflation-storm-gathers-over-construction/</link><pubDate>Thu, 25 Jun 2026 08:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fresh-inflation-storm-gathers-over-construction/</guid></item><item><title><![CDATA[Habiko targets Chester with 342-home affordable flats scheme]]></title><description><![CDATA[Affordable homes consortium Habiko has lodged plans for 342 flats on a key regeneration site in Chester city centre, fresh from securing planning consent for its first development in Warrington four weeks ago.<br />
The joint venture between Pension Insurance Corporation, Muse and Homes England wants to build two apartment blocks rising to eight and 10 storeys on Charterhall Drive, close to Chester railway station.<br />
The scheme will deliver 342 one and two-bedroom affordable flats on land within the &po]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/habiko-targets-chester-with-342-home-affordable-flats-scheme/</link><pubDate>Thu, 25 Jun 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/habiko-targets-chester-with-342-home-affordable-flats-scheme/</guid></item><item><title><![CDATA[Balfour lands £325m SSEN grid superhub job in Scotland]]></title><description><![CDATA[Balfour Beatty has clinched a &pound;325m contract from Scottish and Southern Electricity Networks to build the Netherton Hub in Aberdeenshire, cementing its position at the heart of Britain&rsquo;s electricity transmission upgrade.<br />
The latest award further strengthens Balfour&rsquo;s foothold in the booming electricity transmission market as network operators accelerate investment to connect a new generation of renewable energy projects.<br />
The two-year deal, awarded through SSEN&rsquo;s Accelerat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-lands-325m-ssen-grid-superhub-job-in-scotland/</link><pubDate>Thu, 25 Jun 2026 08:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-lands-325m-ssen-grid-superhub-job-in-scotland/</guid></item><item><title><![CDATA[Watkin Jones lands £50m Oxford aparthotel job]]></title><description><![CDATA[Watkin Jones has checked in to build a 145-unit Wilde-branded lifestyle aparthotel in Oxford.<br />
The contractor has signed a building contract with Marick Real Estate to redevelop 38-40 George Street, close to Gloucester Green, in its first development partnership with the investor.<br />
Enabling works and demolition are due to begin in late August before the main construction phase gets under way, with completion targeted for early 2029.<br />
The scheme will transform the site into a design-led aparthotel f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-lands-50m-oxford-aparthotel-job/</link><pubDate>Wed, 24 Jun 2026 15:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-lands-50m-oxford-aparthotel-job/</guid></item><item><title><![CDATA[Sisk confirmed for £280m Battersea Power Station resi job]]></title><description><![CDATA[Battersea Power Station has confirmed Sisk will deliver the next residential phase of the massive redevelopment project in London<br />
Sisk will start work this summer on Phase 3C, the final two Frank Gehry-designed buildings that will complete Electric Boulevard.<br />
The project is expected to carry a build cost of &pound;250m&ndash;&pound;280m and includes a substantial basement and podium structure supporting two buildings rising to 15 storeys.Phase 3C is expected to create around 400 construction job]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sisk-confirmed-for-280m-battersea-power-station-resi-job/</link><pubDate>Wed, 24 Jun 2026 15:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sisk-confirmed-for-280m-battersea-power-station-resi-job/</guid></item><item><title><![CDATA[Fit-out firm BW gives subbies the raspberry with new hi-vis rule]]></title><description><![CDATA[London fit-out specialist BW is giving subcontractors a raspberry on site &ndash; literally.<br />
The contractor has rolled out mandatory raspberry-coloured hi-vis vests for all subcontractor operatives on its projects as part of a colour-coded identification system designed to boost visibility and accountability.<br />
Under the system, BW project teams wear black hi-vis, visitors wear white and subcontractors now wear raspberry jackets.The move is now in place across 14 live fit-out projects involving 13]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fit-out-firm-bw-gives-subbies-the-raspberry-with-new-hi-vis-rule/</link><pubDate>Wed, 24 Jun 2026 08:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fit-out-firm-bw-gives-subbies-the-raspberry-with-new-hi-vis-rule/</guid></item><item><title><![CDATA[BW gives subbies the raspberry with new hi-vis rule]]></title><description><![CDATA[London fit-out specialist BW is giving subcontractors a raspberry on site &ndash; literally.<br />
The contractor has rolled out mandatory raspberry-coloured hi-vis vests for all subcontractor operatives on its projects as part of a colour-coded identification system designed to boost visibility and accountability.<br />
Under the system, BW project teams wear black hi-vis, visitors wear white and subcontractors wear raspberry.The move is now in place across 14 live fit-out projects involving 137 supply cha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bw-gives-subbies-the-raspberry-with-new-hi-vis-rule/</link><pubDate>Wed, 24 Jun 2026 08:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bw-gives-subbies-the-raspberry-with-new-hi-vis-rule/</guid></item><item><title><![CDATA[NG Bailey tops £700m as grid boom powers profit growth]]></title><description><![CDATA[NG Bailey grew profits, expanded its workforce and broke through &pound;700m revenue for the first time last year as booming electricity infrastructure markets and a strategic reshaping of the business gathered pace.<br />
The UK&rsquo;s largest independent engineering and infrastructure services group hiked pretax profit 47% to &pound;26m in the year to February as turnover rose 7% to &pound;707m.<br />
The business also increased headcount by 5% to 3,648 employees and recruited more than 55 apprentices as]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ng-bailey-tops-700m-as-grid-boom-powers-profit-growth/</link><pubDate>Wed, 24 Jun 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ng-bailey-tops-700m-as-grid-boom-powers-profit-growth/</guid></item><item><title><![CDATA[Major nuclear project plan for former Cottam power station]]></title><description><![CDATA[US nuclear specialist Holtec International and EDF have submitted plans to the Government to build up to four small modular reactors at the former Cottam coal-fired power station site in Nottinghamshire.<br />
The partners have also signed heads of terms to establish a joint venture to develop the SMR scheme under the Government&rsquo;s Advanced Nuclear Framework, which is designed to accelerate advanced nuclear projects backed by private investment.<br />
The proposed development would see the former coal]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/major-nuclear-project-plan-for-former-cottam-power-station/</link><pubDate>Wed, 24 Jun 2026 08:51:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/major-nuclear-project-plan-for-former-cottam-power-station/</guid></item><item><title><![CDATA[Eleven firms land places on £1.5bn YORbuild framework refresh]]></title><description><![CDATA[Five contractors have broken into the latest &pound;1.5bn YORbuild Major Works framework for the first time as local authorities across Yorkshire and the North East refresh one of the country&rsquo;s busiest public sector procurement vehicles.<br />
Caddick Construction, Graham, McLaren Construction, Robertson Construction Group and Vinci Building have all secured their first places on the enlarged major projects framework. Meanwhile, BAM Construction and Bowmer + Kirkland have failed to make the cut]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/eleven-firms-land-places-on-15bn-yorbuild-framework-refresh/</link><pubDate>Wed, 24 Jun 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/eleven-firms-land-places-on-15bn-yorbuild-framework-refresh/</guid></item><item><title><![CDATA[Berkeley warns flat delivery times have jumped to eight years]]></title><description><![CDATA[Berkeley has launched a scathing attack on Britain&rsquo;s planning and regulatory system, warning it now takes at least eight years to deliver an apartment building in London compared with five years a decade ago.<br />
Executive chair Rob Perrins said the ever-lengthening process of securing planning permission, agreeing Section 106 obligations, satisfying statutory consultees, clearing pre-commencement conditions and obtaining Building Safety Regulator approvals was choking investment and stifling]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/berkeley-warns-flat-delivery-times-have-jumped-to-eight-years/</link><pubDate>Wed, 24 Jun 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/berkeley-warns-flat-delivery-times-have-jumped-to-eight-years/</guid></item><item><title><![CDATA[Five firms win £1.2bn of overhead power line work]]></title><description><![CDATA[National Grid has launched the next phase of its Electricity Transmission Partnership (ETP), appointing five delivery partners to carry out major overhead line upgrades across England and Wales.<br />
An initial &pound;1.2bn of reconductoring projects covering over 1,000km of routes have been allocated to Balfour Beatty, M Group, Morgan Sindall Infrastructure, Murphy and OTW, through a partnership model which transforms how National Grid works with its supply chain.<br />
Reconductoring involves upgrading e]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/five-firms-win-12bn-of-overhead-power-line-work/</link><pubDate>Tue, 23 Jun 2026 12:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/five-firms-win-12bn-of-overhead-power-line-work/</guid></item><item><title><![CDATA[Eque2 acquires Chalkstring]]></title><description><![CDATA[Software specialist Eque2 has acquired Chalkstring &ndash; an innovator in modern, cloud-based estimating and cost management solutions.<br />
The move will form the foundation of Eque2&rsquo;s next-generation estimating platform, strengthening its ability to give contractors greater control over costs, risk and margin from the earliest stages of construction projects.<br />
Chalkstring&rsquo;s market-leading cloud estimating and cost management technology will become a core part of Eque2&rsquo;s future est]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/eque2-acquires-chalkstring/</link><pubDate>Tue, 23 Jun 2026 12:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/eque2-acquires-chalkstring/</guid></item><item><title><![CDATA[B+K gets green light for £40m Cumbria school rebuild]]></title><description><![CDATA[Cumberland council planners have given the green light replace ageing buildings at Cockermouth School with a new 137,000 sq ft campus<br />
The approval clears the way for the demolition of existing buildings and construction of replacement teaching accommodation and sports facilities on the Castlegate Drive site.<br />
Bowmer + Kirkland is lined up to deliver the project, thought to be worth over &pound;40m, which will provide a modern campus for 1,440 pupils and 135 full-time staff.The existing school wil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bk-gets-green-light-for-40m-cumbria-school-rebuild/</link><pubDate>Tue, 23 Jun 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bk-gets-green-light-for-40m-cumbria-school-rebuild/</guid></item><item><title><![CDATA[Mulalley wins £1.8m claim over defective tower render system]]></title><description><![CDATA[Mulalley has secured a &pound;1.8m High Court judgment against the German parent of cladding manufacturer Sto over the cost of replacing unsafe external wall systems installed at a residential tower block in Essex.<br />
The ruling marks one of the first major contribution claims under the Building Safety Act to reach judgment and underlines the financial risks facing product manufacturers linked to historic cladding defects.<br />
The Technology and Construction Court heard that Mulalley had designed and b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mulalley-wins-18m-claim-over-defective-tower-render-system/</link><pubDate>Tue, 23 Jun 2026 09:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mulalley-wins-18m-claim-over-defective-tower-render-system/</guid></item><item><title><![CDATA[Herefordshire unveils £95m highways framework line-up]]></title><description><![CDATA[Herefordshire Council has appointed 14 firms to a new four-year highways and public realm framework worth up to &pound;95m.<br />
The framework will support delivery of highways and public realm schemes under the council&rsquo;s new mixed-economy service model, running alongside the authority&rsquo;s new Public Realm Contract from June 2026.<br />
Tarmac landed the biggest single package, securing the &pound;55m surfacing lot, while Eurovia won the &pound;12.5m surface dressing package and Telent took the t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/herefordshire-unveils-95m-highways-framework-line-up/</link><pubDate>Tue, 23 Jun 2026 08:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/herefordshire-unveils-95m-highways-framework-line-up/</guid></item><item><title><![CDATA[Severfield sinks to £40m loss as new boss clears decks for recovery]]></title><description><![CDATA[Structural steel giant Severfield crashed to a &pound;40m pre-tax loss last year as new chief executive Paul McNerney took a &pound;50m hit to simplify the business, exit modular construction and draw a line under legacy issues.<br />
Britain&rsquo;s biggest steelwork contractor booked &pound;50m of exceptional charges during the year to 28 March 2026, including &pound;22m of impairment charges and &pound;13m linked to closing its Modular Solutions arm.The long-running bridge defects saga also continu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/severfield-sinks-to-40m-loss-as-new-boss-clears-decks-for-recovery/</link><pubDate>Tue, 23 Jun 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/severfield-sinks-to-40m-loss-as-new-boss-clears-decks-for-recovery/</guid></item><item><title><![CDATA[Man Utd secure land for giant 100,000-seat stadium]]></title><description><![CDATA[Manchester United have secured the majority of the land needed to build a new 100,000-capacity stadium, marking a major step forward in Sir Jim Ratcliffe&rsquo;s ambition to replace Old Trafford.<br />
The club has acquired a 25-acre triangle of land between Wharfside Way, Europa Way and John Gilbert Way, immediately behind the Stretford End, providing enough space to construct what would become the largest football stadium in the UK.<br />
The new ground, dubbed &lsquo;New Trafford&rsquo; in project docume]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/man-utd-secure-land-for-giant-100000-seat-stadium/</link><pubDate>Mon, 22 Jun 2026 20:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/man-utd-secure-land-for-giant-100000-seat-stadium/</guid></item><item><title><![CDATA[Balfour lands £121m Suffolk substation extension deal]]></title><description><![CDATA[Balfour Beatty has won a &pound;121m contract from National Grid to extend the Bramford 400kV substation in Suffolk as part of plans to strengthen electricity supplies across East Anglia.<br />
The four-year deal, awarded through National Grid&rsquo;s EPC framework, forms a key element of the Great Grid Upgrade programme and will increase transmission capacity on the network.<br />
Under the contract, Balfour will design and install an extension to the existing substation, creating connections for four new]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-lands-121m-suffolk-substation-extension-deal/</link><pubDate>Mon, 22 Jun 2026 19:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-lands-121m-suffolk-substation-extension-deal/</guid></item><item><title><![CDATA[FM Conway lands £1.25bn Westminster highways deal]]></title><description><![CDATA[Westminster City Council has awarded a major highways and public realm contract to FM Conway, working with WSP, to maintain and improve the city&rsquo;s roads, pavements, and public spaces.<br />
The contract, awarded for an initial 8.5-year term with the option to extend for a further four years, has an estimated total value of &pound;1.25bn over 12.5 years.<br />
It covers the design, construction, inspection and maintenance of Westminster&rsquo;s public highway assets, including carriageways, footways, s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fm-conway-lands-125bn-westminster-highways-deal/</link><pubDate>Mon, 22 Jun 2026 14:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fm-conway-lands-125bn-westminster-highways-deal/</guid></item><item><title><![CDATA[Tory MP-linked house builder falls into administration]]></title><description><![CDATA[Devonshire Homes, the Westcountry house builder partly owned by the family interests of former Conservative MP David Heathcoat-Amory, has fallen into administration after losses on an ill-fated bespoke housing scheme pushed the company into the red.<br />
Sarah Collins and Jonathan Marston of Alvarez &amp; Marsal Europe LLP were appointed joint administrators on 18 June.<br />
The administration affects Devonshire Homes Limited only and does not extend to other Devonshire Homes-branded developments or assoc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tory-mp-linked-house-builder-falls-into-administration/</link><pubDate>Mon, 22 Jun 2026 09:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tory-mp-linked-house-builder-falls-into-administration/</guid></item><item><title><![CDATA[Kier confirms next £101m phase of Bridgwater Tidal Barrier job]]></title><description><![CDATA[Kier has confirmed the award a further &pound;101m contract to advance the next phase of the Bridgwater Tidal Barrier Scheme in Somerset after the project underwent a design review to keep costs under control.<br />
The Environment Agency and Somerset Council have awarded the Construction Continuation Contract, allowing work to progress on the barrier structure.<br />
The latest award forms part of a phased procurement strategy adopted by the Environment Agency to minimise financial risk, manage constructio]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-confirms-next-101m-phase-of-bridgwater-tidal-barrier-job/</link><pubDate>Mon, 22 Jun 2026 09:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-confirms-next-101m-phase-of-bridgwater-tidal-barrier-job/</guid></item><item><title><![CDATA[Alun Griffiths returns to profit after owner-led rescue and reset]]></title><description><![CDATA[Civil engineering contractor Alun Griffiths (Contractors) has returned to profit a year after founder Alun Griffiths bought back the business he started and launched a radical reset of its operations.<br />
The contractor swung to an operating profit of &pound;7.2m in 2025 from a &pound;38m loss the previous year as pre-tax profit recovered to &pound;3.9m from a &pound;44m loss.Turnover fell by nearly a third to &pound;140m as the business deliberately shrank to rebuild margins and focus on lower-risk]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/alun-griffiths-returns-to-profit-after-owner-led-rescue-and-reset/</link><pubDate>Mon, 22 Jun 2026 08:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/alun-griffiths-returns-to-profit-after-owner-led-rescue-and-reset/</guid></item><item><title><![CDATA[Refurb and fit-out specialist Pexhurst hits £70m turnover]]></title><description><![CDATA[Refurbishment and fit out contractor Pexhurst has seen its turnover hit &pound;70m.<br />
The Hertfordshire-based firm increased its annual revenue by 63% on the last financial year driven by higher average project values and stronger client retention.<br />
The firm specialises in fit out and refurbishment projects that improve the sustainability and functionality of properties across the industrial, logistics, office and specialist sectors.Pexhurst also benefited from broadening its workload outside of th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/refurb-and-fit-out-specialist-pexhurst-hits-70m-turnover/</link><pubDate>Mon, 22 Jun 2026 06:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/refurb-and-fit-out-specialist-pexhurst-hits-70m-turnover/</guid></item><item><title><![CDATA[Kier seals &pound;35m deal to give empty Walsall M&amp;S a second life]]></title><description><![CDATA[Kier has sealed a &pound;35m contract to transform a vacant former Marks &amp; Spencer store in Walsall town centre into a new gateway and adult learning centre.<br />
The contractor has been appointed by Walsall Council under a direct award through the Pagabo Major Works Framework to deliver the Connected Gateway and Adult Learning Centre project, including enabling works, demolition and the main build.<br />
The scheme will breathe new life into the Park Street building at the Saddlers Shopping Centre, wh]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-seals-pound35m-deal-to-give-empty-walsall-mamps-a-second-life/</link><pubDate>Sat, 20 Jun 2026 11:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-seals-pound35m-deal-to-give-empty-walsall-mamps-a-second-life/</guid></item><item><title><![CDATA[Judge scraps Premier Modular’s £1.65m adjudication win]]></title><description><![CDATA[A High Court judge has thrown out a &pound;1.65m adjudication award in favour of modular specialist Premier Modular after ruling the adjudicator effectively invented a new case that neither party had argued.<br />
In a significant ruling on adjudication natural justice, the Technology and Construction Court found that the adjudicator had gone off on a &ldquo;frolic of his own&rdquo; when deciding a dispute between Premier Modular and Maidstone and Tunbridge Wells NHS Trust over delays to a hospital th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/judge-scraps-premier-modulars-165m-adjudication-win/</link><pubDate>Fri, 19 Jun 2026 17:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/judge-scraps-premier-modulars-165m-adjudication-win/</guid></item><item><title><![CDATA[£7.4bn supply chain hunt starts for electricity network upgrade]]></title><description><![CDATA[Electricity network owner SSEN Transmission has launched a major new supply chain framework for suppliers across the north of Scotland and beyond worth &pound;7.4bn.<br />
Winning contractors will support the delivery of critical infrastructure projects as part of SSEN Transmission&rsquo;s &pound;29bn investment programme to upgrade the network.<br />
The deal covers a broad range of onshore transmission works, including civils, building construction, overhead lines and underground cable installation.Paul L]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/74bn-supply-chain-hunt-starts-for-electricity-network-upgrade/</link><pubDate>Fri, 19 Jun 2026 15:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/74bn-supply-chain-hunt-starts-for-electricity-network-upgrade/</guid></item><item><title><![CDATA[Bathroom pod maker OEP went down owing £3.5m]]></title><description><![CDATA[Lancaster based bathroom pod specialist Offsite Engineered Products UK Ltd (OEP UK) went down owing more than &pound;3.5m.<br />
The company called in administrators last month. Its sister company OEP Building Services went into administration in 2021 owing 135 suppliers &pound;1.7m.<br />
OEP UK bought OEP Building Services in a pre-pack sale for &pound;85,000 led by managing director Iain Crabtree.Since the original deal was finalised OEP UK hasdwon a series of pod supply deals with major contractors and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bathroom-pod-maker-oep-went-down-owing-35m/</link><pubDate>Fri, 19 Jun 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bathroom-pod-maker-oep-went-down-owing-35m/</guid></item><item><title><![CDATA[Barratt Redrow hires ex-Britvic finance chief as CFO]]></title><description><![CDATA[Barratt Redrow has appointed former Britvic finance chief Rebecca Napier as its new chief financial officer and executive director.<br />
Napier will join the UK&rsquo;s biggest house builder on 3 August, replacing interim arrangements put in place following last year&rsquo;s merger between Barratt Developments and Redrow.<br />
She joins after serving as chief financial officer at Britvic until the soft drinks group&rsquo;s takeover by Carlsberg last year. Before that, she spent 17 years at IAG, including]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-hires-ex-britvic-finance-chief-as-cfo/</link><pubDate>Fri, 19 Jun 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-hires-ex-britvic-finance-chief-as-cfo/</guid></item><item><title><![CDATA[Mace loses another key executive ahead of business rebrand]]></title><description><![CDATA[Mace Construct finance chief David Allen is leaving the contractor this autumn, becoming the second senior departure from the business after chief executive officer Jason Millett announced plans to step down at the end of the year.<br />
Allen, who joined Mace at the start of 2023 after serving as chief executive officer at Wates, will leave in October after overseeing a major overhaul of the group&rsquo;s finance operations, including its refinancing last year and the recent carve-out of Mace Consult]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-loses-another-key-executive-ahead-of-business-rebrand/</link><pubDate>Fri, 19 Jun 2026 08:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-loses-another-key-executive-ahead-of-business-rebrand/</guid></item><item><title><![CDATA[Alun Griffiths looking to expand supply chain in the South West]]></title><description><![CDATA[Alun Griffiths (Contractors) Ltd is looking to meet with potential suppliers following the award of new contracts across South West England.<br />
Griffiths will be hosting a Meet the Buyer Day in Bristol on July 15 2026 at Bedminster Cricket Club.<br />
Deputy Managing Director Simon Dunn said: &ldquo;Following the recent appointment to a number of frameworks and projects in Bristol, North Somerset, Somerset and Gloucestershire, we would like to meet new supply chain partners to support project delivery.&l]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/alun-griffiths-looking-to-expand-supply-chain-in-the-south-west/</link><pubDate>Fri, 19 Jun 2026 08:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/alun-griffiths-looking-to-expand-supply-chain-in-the-south-west/</guid></item><item><title><![CDATA[Multiplex sold to Japanese contractor Obayashi]]></title><description><![CDATA[Canadian owner Brookfield Business Corporation has sold its contracting arm Multiplex to Japanese construction firm Obayashi Corporation for &pound;492m.<br />
Multiplex was acquired by Brookfield in 2007 and became a standalone construction business as part of Brookfield Business Corporation in 2016.<br />
The company is a main contractor across the UK, Australia and Canada and a major player in the London commercial market.Anuj Ranjan, CEO of Brookfield Business Corporation, said: &ldquo;Multiplex is a le]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/multiplex-sold-to-japanese-contractor-obayashi/</link><pubDate>Thu, 18 Jun 2026 23:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/multiplex-sold-to-japanese-contractor-obayashi/</guid></item><item><title><![CDATA[PfP digs for partners on £295m groundworks deal]]></title><description><![CDATA[Housing group Places for People has launched a near &pound;300m national framework renewal hunt for groundworks specialists across England and Scotland for the next four years.<br />
The National Groundworkers Framework will cover everything from site clearance, earthworks and foundations to drainage, utilities, roads and external works for both Places for People and its development arm, PfP Developments.<br />
M&amp;J Evans Construction, Carmac (Building &amp; Civil Engineering), Churngold Construction and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pfp-digs-for-partners-on-295m-groundworks-deal/</link><pubDate>Thu, 18 Jun 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pfp-digs-for-partners-on-295m-groundworks-deal/</guid></item><item><title><![CDATA[Approved installer register to tackle home insulation scandal]]></title><description><![CDATA[The Government has committed to launch an approved installer register to clean up Britain&rsquo;s crisis-hit home insulation market.<br />
Ministers are drawing up a national register of approved retrofit installers and arming regulators with powers to ban poor performers after the home insulation scandal left up to 23,000 properties needing repair work.<br />
The move comes after a blistering National Audit Office investigation found that 98% of external wall insulation installations inspected under govern]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/approved-installer-register-to-tackle-home-insulation-scandal/</link><pubDate>Thu, 18 Jun 2026 08:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/approved-installer-register-to-tackle-home-insulation-scandal/</guid></item><item><title><![CDATA[Strabag UK rejigs Van Elle leadership after takeover]]></title><description><![CDATA[Strabag UK has rejigged the senior leadership team at piling contractor Van Elle after formally completing the &pound;59m takeover of the Nottingham-based specialist this week.<br />
Van Elle chief executive Mark Cutler will move to an advisory role across the Strabag UK business.<br />
Moving forward, former COO Malcolm O&rsquo;Sullivan and preconstruction director Matt Love are promoted to joint managing director roles, working alongside chief financial officer Graeme Campbell.Strabag&rsquo;s move for the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/strabag-uk-rejigs-van-elle-leadership-after-takeover/</link><pubDate>Thu, 18 Jun 2026 07:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/strabag-uk-rejigs-van-elle-leadership-after-takeover/</guid></item><item><title><![CDATA[G&amp;H lands &pound;16m brace of M&amp;E deals]]></title><description><![CDATA[G&amp;H has won more work in the healthcare sector with two mechanical, electrical and public health (MEP) contract wins worth a combined &pound;16.3m with new client Elliott Group and existing client HBC Construction.<br />
Elliott Group has appointed MEP to deliver Affidea&rsquo;s flagship medical centre at Wimbledon Quarter &ndash; the first private medical centre to be located in a UK retail destination.<br />
Opening late 2026, the centre will provide private GP care, a minor injuries unit, advanced di]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gamph-lands-pound16m-brace-of-mampe-deals/</link><pubDate>Thu, 18 Jun 2026 00:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gamph-lands-pound16m-brace-of-mampe-deals/</guid></item><item><title><![CDATA[G&amp;H bags &pound;16m brace of M&amp;E deals]]></title><description><![CDATA[G&amp;H has won more work in the healthcare sector with two mechanical, electrical and public health (MEP) contract wins worth a combined &pound;16.3m with new client Elliott Group and existing client HBC Construction.<br />
Elliott Group has appointed MEP to deliver Affidea&rsquo;s flagship medical centre at Wimbledon Quarter &ndash; the first private medical centre to be located in a UK retail destination.<br />
Opening late 2026, the centre will provide private GP care, a minor injuries unit, advanced di]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gamph-bags-pound16m-brace-of-mampe-deals/</link><pubDate>Thu, 18 Jun 2026 00:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gamph-bags-pound16m-brace-of-mampe-deals/</guid></item><item><title><![CDATA[AGD offers super productive crawler cranes]]></title><description><![CDATA[Hire specialist AGD is highlighting the effectiveness of&nbsp;Sennebogen Crawler Cranes.AGD said the machines lead the market because they can operate at wind speeds of up to 20 m/sec &ndash; the highest permissible for any make of crawler crane &ndash; resulting in less downtime, more productivity, and maximum return on projects.AGD also supplies SafeAid wireless anemometers which track and download accurate wind speed data &mdash; giving confidence and backup customers need when it matters mos]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/agd-offers-super-productive-crawler-cranes/</link><pubDate>Thu, 18 Jun 2026 00:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/agd-offers-super-productive-crawler-cranes/</guid></item><item><title><![CDATA[Wates wins £138m Sevenoaks town centre revamp]]></title><description><![CDATA[Wates has been named as preferred contractor to take forward &pound;138m plans to regenerate Sevenoaks town centre.<br />
At the heart of the Land East of Sevenoaks High Street project will be a new leisure centre alongside a new cultural hub and market hall, improved public transport links, new public green spaces and new energy-efficient homes.<br />
During construction, 263 new jobs could be created.In the coming months, Wates will produce early project designs for the public to have their say. Following]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-wins-138m-sevenoaks-town-centre-revamp/</link><pubDate>Wed, 17 Jun 2026 18:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-wins-138m-sevenoaks-town-centre-revamp/</guid></item><item><title><![CDATA[Ardmore collapse triggers 275 job losses]]></title><description><![CDATA[More than 275 staff have lost their jobs following the collapse of major London contractor Ardmore, as administrators begin winding down several parts of the business.<br />
Two insolvency practitioners &ndash; BTG and Panos Eliades Callender &amp; Co &ndash; are now acting as joint administrators for five Ardmore companies.<br />
The companies in administration are Ardmore Construction Group, Ardmore Major Projects, Ardmore Fitout, Ardmore Regeneration and Landmark Facades last Thursday. A sixth business,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-collapse-triggers-275-job-losses/</link><pubDate>Wed, 17 Jun 2026 16:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-collapse-triggers-275-job-losses/</guid></item><item><title><![CDATA[Ardmore collapse hits bond providers for £100m]]></title><description><![CDATA[Bonding providers are understood to be facing &pound;100m hit from the collapse of London contractor Ardmore.<br />
Sources in the market say surety providers are braced for a &pound;100m hit compounding a few torrid years of losses from high-profile contractor collapses.<br />
One source told the Enquirer: &ldquo;While Ardmore&rsquo;s hit will be less than the &pound;160m from the collapse of Henry Projects it will still spook the surety market and the cost of bonding is sure to rise again.<br />
Surety provider]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-collapse-hits-bond-providers-for-100m/</link><pubDate>Wed, 17 Jun 2026 16:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-collapse-hits-bond-providers-for-100m/</guid></item><item><title><![CDATA[Costain lands road job to unlock giant estate]]></title><description><![CDATA[Costain has been chosen by Norfolk County Council to finalise the detailed design and build the West Winch Housing Access Road scheme near King&rsquo;s Lynn, Norfolk.<br />
The new 1.5-mile road will connect the A47 with the existing A10 to serve up to four thousand new homes planned for the new Growth Area south of King&rsquo;s Lynn. Once opened, the new road will become part of the A10.<br />
Costain will also oversee creation of new roundabouts that will provide access to the new housing areas, a cycle p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-lands-road-job-to-unlock-giant-estate/</link><pubDate>Wed, 17 Jun 2026 15:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-lands-road-job-to-unlock-giant-estate/</guid></item><item><title><![CDATA[Speedy Hire racks-up £32m loss]]></title><description><![CDATA[Speedy Hire has posted a pre-tax loss of &pound;32.3m in its latest results.<br />
The plant and tool hire giant showed revenue flat at &pound;416.1m for the year to March 31 2026 as pre-tax losses deepened to &pound;32.3m from &pound;1.5m last time.<br />
Bosses blamed &ldquo;continued macro&#8209;economic uncertainty and subdued activity level&rdquo; and higher borrowing costs for investment in new kit.Chief Executive Dan Rayner said better times were ahead as the company&rsquo;s &ldquo;Velocity&rdquo; gr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/speedy-hire-racks-up-32m-loss/</link><pubDate>Wed, 17 Jun 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/speedy-hire-racks-up-32m-loss/</guid></item><item><title><![CDATA[RE:GEN, Esh and Bell set for slice of £48m Gentoo retrofit push]]></title><description><![CDATA[Housing association Gentoo is rolling out a &pound;48m programme of improvement works across more than 2,800 homes in Sunderland this year.<br />
The investment package will be delivered through a team of framework partners including RE:GEN Group, Esh Construction, Bell Group, PHS and Isoler.<br />
Works will include external decorations, new kitchens and bathrooms, electrical rewires, replacement communal entrance doors and roof renewals.The programme forms part of Gentoo&rsquo;s long-term investment strat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/regen-esh-and-bell-set-for-slice-of-48m-gentoo-retrofit-push/</link><pubDate>Wed, 17 Jun 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/regen-esh-and-bell-set-for-slice-of-48m-gentoo-retrofit-push/</guid></item><item><title><![CDATA[Bachy creates technical director role as ex-Skanska boss joins]]></title><description><![CDATA[Geotechnical contractor Bachy Soletanche has strengthened its senior leadership team with the creation of a new technical director role and the appointment of a former Cementation Skanska director to lead its southern business.<br />
Martin Stanley has been promoted to the newly-created role of technical director after 20 years with the business.<br />
He will oversee technical, design, operational systems, quality and digital functions, with responsibility spanning business development, preconstruction and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bachy-creates-technical-director-role-as-ex-skanska-boss-joins/</link><pubDate>Wed, 17 Jun 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bachy-creates-technical-director-role-as-ex-skanska-boss-joins/</guid></item><item><title><![CDATA[Higgins lands first phase of £500m estate revamp]]></title><description><![CDATA[Camden Council has appointed Higgins Partnerships to deliver the first phase of the regeneration of the &pound;500m of the West Kentish Town Estate.<br />
The Enquirer understands Higgins&rsquo; contract is worth around &pound;27m to deliver 52 new&nbsp;affordable&nbsp;homes&nbsp;across&nbsp;two six-storey blocks.<br />
Declan Higgins, Chief Executive Officer for Higgins Group, said: &ldquo;Alongside&nbsp;providing&nbsp;high-quality, affordable homes, we will work closely with&nbsp;the local community to cr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/higgins-lands-first-phase-of-500m-estate-revamp/</link><pubDate>Wed, 17 Jun 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/higgins-lands-first-phase-of-500m-estate-revamp/</guid></item><item><title><![CDATA[TCC helps with new Costa Coffee drive through]]></title><description><![CDATA[A new drive-through coffee shop is taking shape in Shrewsbury, with help from a Birmingham-based construction consultancy.<br />
The Construction Consultants (TCC) have been appointed to support the development of a new &pound;800,000 Costa Coffee drive-through on the Sentinel Trade Park in Shrewsbury.<br />
This is the 10th Costa Coffee project supported by TCC. The consultancy has worked on Costa developments in Bristol, Wolverhampton and Andover among other locations.<br />
TCC is providing employers agent ser]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tcc-helps-with-new-costa-coffee-drive-through/</link><pubDate>Tue, 16 Jun 2026 19:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tcc-helps-with-new-costa-coffee-drive-through/</guid></item><item><title><![CDATA[Graham signals start of £17m railway museum rebuild]]></title><description><![CDATA[Graham has signed up to deliver the National Railway Museum&rsquo;s long-awaited Central Hall project in York, paving the way for construction work to begin on a landmark new entrance building.<br />
The contractor, which completed pre-construction services on the scheme, will now start main construction work on the project, expected to take around two years to complete.<br />
The new building forms a key part of the museum&rsquo;s wider transformation programme and sits at the heart of the York Central reg]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-signals-start-of-17m-railway-museum-rebuild/</link><pubDate>Tue, 16 Jun 2026 16:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-signals-start-of-17m-railway-museum-rebuild/</guid></item><item><title><![CDATA[£1bn London film quarter scheme in Camden approved]]></title><description><![CDATA[London&rsquo;s Camden Council has granted planning permission for a &pound;1bn regeneration scheme that will create one of the UK&rsquo;s biggest film and television production hubs alongside hundreds of new homes in north London.<br />
The Camden Film Quarter project at Regis Road in Kentish Town will deliver 11 purpose-built sound stages, more than 100,000 sq ft of creative workspace and 485 homes, half of them affordable.<br />
Developer Yoo Capital said the scheme would create a fully integrated screen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/1bn-london-film-quarter-scheme-in-camden-approved/</link><pubDate>Tue, 16 Jun 2026 16:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/1bn-london-film-quarter-scheme-in-camden-approved/</guid></item><item><title><![CDATA[Race starts to create blueprint for ultra-low-carbon schools]]></title><description><![CDATA[The Department for Education has begun assembling the team to develop and built a demonstrator for the next-generation ultra-low-carbon school buildings across England.<br />
Ministers have launched a &pound;3.9m procurement for an innovation lead to spearhead the Regenerative Schools Pilot, a flagship initiative that will test new construction methods, bio-based materials and nature-led design solutions for future school buildings.<br />
The successful consultant will become the Department&rsquo;s principa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/race-starts-to-create-blueprint-for-ultra-low-carbon-schools/</link><pubDate>Tue, 16 Jun 2026 08:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/race-starts-to-create-blueprint-for-ultra-low-carbon-schools/</guid></item><item><title><![CDATA[London mayor invests £100m in Silvertown revamp]]></title><description><![CDATA[Mayor of London, Sadiq Khan has launched a &lsquo;Singapore-style&rsquo; housing development arm for the capital with a &pound;100m investment in the Silvertown Partnership.<br />
Public money from the Greater London Authority will be pumped into the scheme to deliver 7,000 new homes in the Royal Docks.<br />
The move sees City Hall becoming an active developer &ndash; intervening in London&rsquo;s land market to &ldquo;maximise affordable housing delivery and accelerate the speed of building&rdquo;.The ini]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-mayor-invests-100m-in-silvertown-revamp/</link><pubDate>Tue, 16 Jun 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-mayor-invests-100m-in-silvertown-revamp/</guid></item><item><title><![CDATA[Marlborough beats big rivals to £150m West Berkshire roads deal]]></title><description><![CDATA[West Berkshire Council has handed fast-expanding Marlborough Highways a &pound;150m highways maintenance deal after seeing off bids from four major rivals.<br />
The Essex-based contractor beat Ringway, VolkerHighways, M Group Highways and Costain to secure the seven-year contract, which starts in October and can be extended by a further three years.<br />
West Berkshire spends more than &pound;15m a year on highway maintenance, covering reactive and planned works, winter maintenance and asset management, a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/marlborough-beats-big-rivals-to-150m-west-berkshire-roads-deal/</link><pubDate>Tue, 16 Jun 2026 08:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/marlborough-beats-big-rivals-to-150m-west-berkshire-roads-deal/</guid></item><item><title><![CDATA[Platform collapse fractures neck of drilling worker]]></title><description><![CDATA[Two construction companies have been fined after a drilling operative sustained fractures to his neck and back when a temporary platform loaded with concrete debris collapsed on top of him.<br />
Steve Zschoch, now 60, was working for contractors Diacutt Limited on 23 February 2024 at Paxton House in the City of London. The refurbishment project, which was being run by principal contractor Roots Contractors Limited, involved cutting openings through five concrete floors to create a service riser shaft]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/platform-collapse-fractures-neck-of-drilling-worker/</link><pubDate>Mon, 15 Jun 2026 18:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/platform-collapse-fractures-neck-of-drilling-worker/</guid></item><item><title><![CDATA[Winvic lands £130m Leeds BTR towers job]]></title><description><![CDATA[Winvic has secured a &pound;130m contract to build a pair of residential towers in Leeds after the scheme became one of the latest major high-rise projects to clear the Building Safety Regulator&rsquo;s Gateway 2 hurdle.<br />
The contractor has been appointed by Lisbon Street Developments, a joint venture between Marrico Asset Management and Helios Real Estate, to deliver 578 build-to-rent flats on the former International Swimming Pool site close to Leeds city centre.<br />
Construction is expected to sta]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winvic-lands-130m-leeds-btr-towers-job/</link><pubDate>Mon, 15 Jun 2026 15:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winvic-lands-130m-leeds-btr-towers-job/</guid></item><item><title><![CDATA[Winvic lands £130m Leeds BTR towers after Gateway 2 approval]]></title><description><![CDATA[Winvic has secured a &pound;130m contract to build a pair of residential towers in Leeds after the scheme became one of the latest major high-rise projects to clear the Building Safety Regulator&rsquo;s Gateway 2 hurdle.<br />
The contractor has been appointed by Lisbon Street Developments, a joint venture between Marrico Asset Management and Helios Real Estate, to deliver 578 build-to-rent flats on the former International Swimming Pool site close to Leeds city centre.<br />
Construction is expected to sta]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winvic-lands-130m-leeds-btr-towers-after-gateway-2-approval/</link><pubDate>Mon, 15 Jun 2026 15:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winvic-lands-130m-leeds-btr-towers-after-gateway-2-approval/</guid></item><item><title><![CDATA[Domis clears Gateway 2 hurdle for Manchester tower]]></title><description><![CDATA[Domis is set to start construction next month on a 24-storey flats and aparthotel tower in Manchester after the project secured long-awaited Building Safety Regulator Gateway 2 approval.<br />
The green light unlocks delivery of the Vivere Residences scheme at Cornbrook, where developer Forshaw Land &amp; Property Group plans to build 237 flats alongside an 88-key aparthotel on a prominent gateway site next to Cornbrook Metrolink station.<br />
The mixed-use project forms part of Peel Waters&rsquo; wider Ma]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/domis-clears-gateway-2-hurdle-for-manchester-tower/</link><pubDate>Mon, 15 Jun 2026 14:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/domis-clears-gateway-2-hurdle-for-manchester-tower/</guid></item><item><title><![CDATA[Construction leaders recognised in King’s birthday honours]]></title><description><![CDATA[Former Tideway chief executive Andy Mitchell has been awarded a knighthood in the King&rsquo;s Birthday Honours list for services to the construction industry.<br />
Mitchell led the delivery of the &pound;5bn Thames Tideway Tunnel project, one of the UK&rsquo;s largest infrastructure schemes, before stepping down from the business earlier this year.<br />
The honour recognises his role overseeing the financing, construction and delivery of London&rsquo;s successful 25km &ldquo;super sewer&rdquo; project.Se]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-leaders-recognised-in-kings-birthday-honours/</link><pubDate>Mon, 15 Jun 2026 09:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-leaders-recognised-in-kings-birthday-honours/</guid></item><item><title><![CDATA[Steel tariff loophole puts 30,000 fabrication jobs on the line]]></title><description><![CDATA[The UK&rsquo;s steel fabrication sector has warned that up to 30,000 jobs could disappear over the next seven years unless ministers rethink new steel tariffs due to come into force on 1 July.<br />
Industry leaders claim the measures are creating a major loophole that will penalise UK fabricators while allowing overseas competitors to ship in fabricated steelwork tariff-free.<br />
The Construction Leadership Council and British Construction Steelwork Association has stepped up lobbying efforts ahead of th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/steel-tariff-loophole-puts-30000-fabrication-jobs-on-the-line/</link><pubDate>Mon, 15 Jun 2026 08:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/steel-tariff-loophole-puts-30000-fabrication-jobs-on-the-line/</guid></item><item><title><![CDATA[CITB  set for £20m pension windfall]]></title><description><![CDATA[The Construction Industry Training Board is set for a multi-million pound windfall from a pension fund in the process of being wound-up.<br />
Industry sources estimate the training body could be in line for a payout of up-to &pound;20m.<br />
The windfall will come from the closing ITB Pension Fund which manages money for all current and former industry training boards.The closure of the scheme was triggered after it reached maximum funding levels.<br />
The ongoing pension needs of employees will be met by an i]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/citb-set-for-20m-pension-windfall/</link><pubDate>Mon, 15 Jun 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/citb-set-for-20m-pension-windfall/</guid></item><item><title><![CDATA[Met Police launches £560m construction framework hunt]]></title><description><![CDATA[The Metropolitan Police has launched a procurement drive for a &pound;560m building works framework covering refurbishment, maintenance, security and new-build projects across its estate.<br />
The nine-lot framework will become the force&rsquo;s main route for delivering capital works from February 2027 and could run for up to five years if an extension option is exercised.<br />
Works will range from internal refurbishments, fit-outs and M&amp;E upgrades through to demolition, asbestos removal, security i]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/met-police-launches-560m-construction-framework-hunt/</link><pubDate>Mon, 15 Jun 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/met-police-launches-560m-construction-framework-hunt/</guid></item><item><title><![CDATA[Met Police launch £560m construction framework hunt]]></title><description><![CDATA[The Metropolitan Police has launched a procurement drive for a &pound;560m building works framework covering refurbishment, maintenance, security and new-build projects across its estate.<br />
The nine-lot framework will become the force&rsquo;s main route for delivering capital works from February 2027 and could run for up to five years if an extension option is exercised.<br />
Works will range from internal refurbishments, fit-outs and M&amp;E upgrades through to demolition, asbestos removal, security i]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/met-police-launch-560m-construction-framework-hunt/</link><pubDate>Mon, 15 Jun 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/met-police-launch-560m-construction-framework-hunt/</guid></item><item><title><![CDATA[Vistry launches voluntary exit scheme for staff]]></title><description><![CDATA[Vistry has offered staff voluntary redundancy as the partnerships house builder steps up efforts to preserve cash and cut debt.<br />
The firm has written to staff below managing director level, inviting them to apply for an enhanced voluntary exit scheme<br />
Vistry has not specified the number of roles impacted, emphasising the programme offers options for employees amid operational changes.<br />
The move comes weeks after new chief executive Adam Daniels paused the group&rsquo;s share buyback programme and w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-launches-voluntary-exit-scheme-for-staff/</link><pubDate>Mon, 15 Jun 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-launches-voluntary-exit-scheme-for-staff/</guid></item><item><title><![CDATA[Scores bag places on £9.5bn education building framework]]></title><description><![CDATA[Salford-based education buying body Crescent Purchasing Consortium has selected 50 contractors and demolition specialists for a new eight-year construction framework targeted at building projects across England, Wales and Scotland.<br />
The Construction &amp; Capital Works framework is designed to support new-build and refurbishment projects for schools, colleges, universities, academies, museums and wider public sector clients.<br />
The agreement is split into 45 regional and contract-form lots covering]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scores-bag-places-on-95bn-education-building-framework/</link><pubDate>Mon, 15 Jun 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scores-bag-places-on-95bn-education-building-framework/</guid></item><item><title><![CDATA[Groundworks firm Mackoy bought in pre-pack deal]]></title><description><![CDATA[Groundworks contractor Mackoy Limited has been sold out of administration in a pre-pack deal to Geocore Civils Limited.<br />
Mackoy went into administration on Tuesday with Quantuma taking charge of the &pound;23m turnover business which was one of the biggest groundworks specialists in the South of England focused on infrastructure for housing and commercial schemes.<br />
Qauntuma said the&nbsp;pre-pack sale protects 20 jobs and &ldquo;secures the future of the business&rdquo; which is based in Chandler&]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/groundworks-firm-mackoy-bought-in-pre-pack-deal/</link><pubDate>Fri, 12 Jun 2026 12:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/groundworks-firm-mackoy-bought-in-pre-pack-deal/</guid></item><item><title><![CDATA[Guildmore gets start date for £68m leisure centre]]></title><description><![CDATA[Guildmore Group will start work on site this autumn after being officially appointed to lead the &pound;68m regeneration of St George&rsquo;s Leisure Centre in The London Borough of Tower Hamlets.<br />
Demolition of the existing building is scheduled to begin this Autumn 2026 with construction works expected to start in early 2027. The new leisure centre and homes are anticipated to be completed in 2029.<br />
The existing leisure centre in Shadwell will be demolished and replaced with a modern four-storey]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/guildmore-gets-start-date-for-68m-leisure-centre/</link><pubDate>Fri, 12 Jun 2026 09:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/guildmore-gets-start-date-for-68m-leisure-centre/</guid></item><item><title><![CDATA[McAlpine replaced on £4bn Somerset gigafactory job]]></title><description><![CDATA[Battery giant Agratas is replacing Sir Robert McAlpine on its flagship &pound;4bn Somerset gigafactory project as it seeks to get the delayed Gravity Smart Campus development back on track.<br />
The Tata-owned business will part company with McAlpine at the end of this month and is preparing to install a new construction partner to take the vast battery manufacturing scheme through its next phase.<br />
Agratas has not revealed who will replace McAlpine, but industry sources told the Enquirer that logistic]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcalpine-replaced-on-4bn-somerset-gigafactory-job/</link><pubDate>Fri, 12 Jun 2026 09:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcalpine-replaced-on-4bn-somerset-gigafactory-job/</guid></item><item><title><![CDATA[New boss strengthens Severfield delivery team]]></title><description><![CDATA[Steelwork giant Severfield has drafted in two senior appointments as new chief executive Paul McNerney presses ahead with plans to reshape the business.<br />
McNerney, who joined from Laing O&rsquo;Rourke last November, has completed a review of Severfield&rsquo;s markets, operations and organisational structure following a turbulent year for the group.<br />
As part of the shake-up, he has appointed former Laing O&rsquo;Rourke colleague Vasily Lovkovskiy as head of transformation.Lovkovskiy worked alongsi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/new-boss-strengthens-severfield-delivery-team/</link><pubDate>Fri, 12 Jun 2026 09:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/new-boss-strengthens-severfield-delivery-team/</guid></item><item><title><![CDATA[Contractors circle to finish Ardmore’s 10 big London jobs]]></title><description><![CDATA[Clients of collapsed contractor Ardmore Construction Group have already started lining up replacement builders in a bid to keep its &pound;1bn-plus portfolio of London projects moving.<br />
Rapid handovers on Ardmore&rsquo;s 10 major sites could help limit the fallout from the &pound;350m-turnover contractor&rsquo;s collapse and reduce disruption for subcontractors and suppliers caught up in the failure.<br />
One industry source told the Enquirer: &ldquo;It was clear that Ardmore was in trouble because of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-circle-to-finish-ardmores-10-big-london-jobs/</link><pubDate>Fri, 12 Jun 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-circle-to-finish-ardmores-10-big-london-jobs/</guid></item><item><title><![CDATA[Kier wins £140m water contract extension]]></title><description><![CDATA[Kier has been awarded a &pound;140m contract extension across South West Water&rsquo;s network over the next two years.<br />
Kier is the sole contractor appointed on the extension of the Network Services Alliance (NSA) framework.<br />
The contractor will continue to deliver repair and maintenance, leakage activity, network reliability schemes, metering and developer services alongside local supply chains.In the last year Kier has delivered more than 25,000 repair and maintenance jobs, alongside over 32,00]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-wins-140m-water-contract-extension/</link><pubDate>Fri, 12 Jun 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-wins-140m-water-contract-extension/</guid></item><item><title><![CDATA[Ardmore Construction Group collapses into administration]]></title><description><![CDATA[Ardmore Construction Group is being placed into administration today after mounting concerns over potential liabilities linked to legacy residential projects undermined its ability to secure new work and squeezed cash flow.<br />
Major London sites were shut down this morning as the group moved to enter administration through the courts following missed payments to staff and subcontractors.<br />
Group businesses affected include Ardmore Major Projects, Ardmore Hotels &amp; Commercial, Ardmore Regeneration,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-construction-group-collapses-into-administration/</link><pubDate>Thu, 11 Jun 2026 13:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-construction-group-collapses-into-administration/</guid></item><item><title><![CDATA[Allied London unveils landmark Castlefield tower plan]]></title><description><![CDATA[A 46-storey residential tower could rise above Manchester&rsquo;s Castlefield district under plans to deliver nearly 600 homes on one of the city centre&rsquo;s last major vacant brownfield sites.<br />
Developer Allied London is behind the plan to replace a stalled scheme at the site that never got off the ground.<br />
The proposed One Castlefield development would see a 46-storey tower and an adjoining eight-storey block rise on Ellesmere Street, plugging the final gap in the wider St George&rsquo;s rege]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/allied-london-unveils-landmark-castlefield-tower-plan/</link><pubDate>Thu, 11 Jun 2026 09:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/allied-london-unveils-landmark-castlefield-tower-plan/</guid></item><item><title><![CDATA[Subcontractors wanted for jobs across Yorkshire]]></title><description><![CDATA[Constructionline is hosting its latest event in Leeds next week.<br />
The Marketplace Live event will highlight work opportunities for subcontractors and suppliers across Yorkshire.<br />
Companies looking to boost their supply chain will include McLaren, Balfour Beatty, Seddon, GMI, Fortem Solutions, Robertson Group and United Infrastructure.The event will take place at Leeds United&rsquo;s Centenary Pavillion on June 18.<br />
Registration for Marketplace Live is open to paid members of the Once For All networ]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/subcontractors-wanted-for-jobs-across-yorkshire/</link><pubDate>Thu, 11 Jun 2026 08:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/subcontractors-wanted-for-jobs-across-yorkshire/</guid></item><item><title><![CDATA[Gatwick picks 11 firms to drive £2bn airport upgrade]]></title><description><![CDATA[London Gatwick has refreshed its contractor roster choosing 11 firms to deliver a &pound;2bn decade-long upgrade of the airport.<br />
The selected suppliers include major tier 1s and several regional specialists. Together they will support management and delivery of airport projects such as pier refurbishments, installation of electric vehicle charging stations, self-check-in system enhancements and upgrading of terminal facilitiesLondon Gatwick line-up<br />
BP Installations<br />
Camgo Electrical<br />
Costain<br />
Gatwi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gatwick-picks-11-firms-to-drive-2bn-airport-upgrade/</link><pubDate>Thu, 11 Jun 2026 08:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gatwick-picks-11-firms-to-drive-2bn-airport-upgrade/</guid></item><item><title><![CDATA[Derby backs 1,150-home Derbion masterplan]]></title><description><![CDATA[Shopping centre owner Derbion has secured planning approval for a major city centre regeneration scheme that will deliver 1,150 new homes across two key redevelopment sites in Derby.<br />
The consent covers the transformation of the former Eagle Market site and the nearby Bradshaw Way Retail Park, both identified by Derby City Council as priority regeneration locations within its Vision for Derby strategy.<br />
At the former Eagle Market site, Derbion plans to deliver 674 homes across six residential buil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/derby-backs-1150-home-derbion-masterplan/</link><pubDate>Thu, 11 Jun 2026 08:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/derby-backs-1150-home-derbion-masterplan/</guid></item><item><title><![CDATA[Lorne Stewart returns to profit after two years in the red]]></title><description><![CDATA[Saudi-owned M&amp;E contractor Lorne Stewart has returned to profit after a board-led turnaround programme cut costs, shut underperforming regions and tightened project selection.<br />
The Greenford-based engineering and facilities services specialist posted a pre-tax profit of &pound;1.6m for the year to 31 December 2025, reversing a &pound;1.6m loss the previous year and ending two consecutive years in the red.<br />
Turnover edged up 5% to &pound;107m, while operating profit recovered to &pound;1.2m fro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lorne-stewart-returns-to-profit-after-two-years-in-the-red/</link><pubDate>Thu, 11 Jun 2026 08:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lorne-stewart-returns-to-profit-after-two-years-in-the-red/</guid></item><item><title><![CDATA[Mott MacDonald Bentley to host recruitment event]]></title><description><![CDATA[Mott MacDonald Bentley (MMB) is continuing its expansion across the South West following its first long-term framework award with Wessex Water &ndash; strengthening its project design and delivery capability and inviting prospective candidates to a recruitment event in Poole this month.<br />
As a capital delivery partner on two multi-million-pound lots, MMB will help deliver part of a &pound;3.7bn AMP8 investment programme across the South West of England. The work supports improvements in wastewater]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mott-macdonald-bentley-to-host-recruitment-event/</link><pubDate>Wed, 10 Jun 2026 23:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mott-macdonald-bentley-to-host-recruitment-event/</guid></item><item><title><![CDATA[G&amp;H lands deals with Wates and Tilbury Douglas]]></title><description><![CDATA[G&amp;H has been appointed to deliver two school mechanical, electrical and public health (MEP) design and build contracts worth &pound;7.8m, including its first project in collaboration with Wates.<br />
Following competitive tender processes, G&amp;H will support Wates, to deliver the new Joseph Norton Academy on behalf of Kirklees Council. It will also collaborate with Tilbury Douglas on Brunswick Community Primary School for the Department of Education.<br />
Based in Huddersfield, the Joseph Norton Aca]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gamph-lands-deals-with-wates-and-tilbury-douglas/</link><pubDate>Wed, 10 Jun 2026 22:51:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gamph-lands-deals-with-wates-and-tilbury-douglas/</guid></item><item><title><![CDATA[CCTV captures scaffolder’s skylight roof plunge]]></title><description><![CDATA[Two construction companies have been fined &pound;79,300 after a scaffolder broke his arm, leg and suffered head lacerations after falling through a roof skylight while installing temporary edge protection at a warehouse in Yorkshire.<br />
James Cranswick, 26, was installing temporary scaffolding edge protection for Clover Access Systems Limited at a warehouse at Acre Mills in Keighley, West Yorkshire, when the incident took place. CCTV footage shows Cranswick falling onto a pallet truck before landi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cctv-captures-scaffolders-skylight-roof-plunge/</link><pubDate>Wed, 10 Jun 2026 15:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cctv-captures-scaffolders-skylight-roof-plunge/</guid></item><item><title><![CDATA[Motorway concrete barrier safety drive hits the hard shoulder]]></title><description><![CDATA[Government road safety chiefs have been accused of dragging their heels on plans to replace ageing motorway steel barriers with safer concrete systems.<br />
Parliamentary answers have revealed National Highways has replaced just 53km of life-expired steel central reserve barrier with concrete between 2020 and 2025.<br />
That is despite its own 2022 improvement plan identifying around 1,620km of steel barrier needing replacement across the network.<br />
The Department for Transport mandated in 2005 that stronge]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/motorway-concrete-barrier-safety-drive-hits-the-hard-shoulder/</link><pubDate>Wed, 10 Jun 2026 08:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/motorway-concrete-barrier-safety-drive-hits-the-hard-shoulder/</guid></item><item><title><![CDATA[Sellafield site pay dispute sparks new week-long strike]]></title><description><![CDATA[Construction workers at Sellafield are set to stage a fresh week-long strike after talks over a nuclear site allowance failed to make progress.<br />
Nearly 2,000 trades workers will walk out from 15-21 June in an escalating dispute over demands for a site-specific payment recognising the specialist skills and hazards involved in working at the UK&rsquo;s largest nuclear complex.<br />
Trades planning to take action include electricians, joiners, pipe-fitters, riggers, welders and groundworkers working for]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sellafield-site-pay-dispute-sparks-new-week-long-strike/</link><pubDate>Wed, 10 Jun 2026 08:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sellafield-site-pay-dispute-sparks-new-week-long-strike/</guid></item><item><title><![CDATA[Portsmouth lines up £120m tower block safety blitz]]></title><description><![CDATA[Portsmouth City Council has launched a &pound;120m framework to accelerate fire safety and building remediation works across its high-rise housing stock, with up to six contractors set to share a six-year programme.<br />
The framework will cover several higher-risk residential towers alongside selected medium and low-rise blocks, with the council aiming to appoint contractors by October.<br />
The programme is valued between &pound;60m and &pound;120m over the maximum six-year term.A distinctive feature of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/portsmouth-lines-up-120m-tower-block-safety-blitz/</link><pubDate>Wed, 10 Jun 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/portsmouth-lines-up-120m-tower-block-safety-blitz/</guid></item><item><title><![CDATA[McAlpine/Vinci £1.3bn Crewe hospital gets green light]]></title><description><![CDATA[Plans for the &pound;1.3bn redevelopment of Leighton Hospital in Crewe have gained planning consent, paving the way for one of the first projects in the Government&rsquo;s New Hospital Programme to move into delivery.<br />
The hybrid planning application from Mid Cheshire Hospitals NHS Foundation Trust covers the replacement of the ageing Crewe hospital with a 1.2m sq ft super hospital built largely to the north of the existing estate.<br />
The scheme was accelerated after reinforced autoclaved aerated co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcalpinevinci-13bn-crewe-hospital-gets-green-light/</link><pubDate>Wed, 10 Jun 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcalpinevinci-13bn-crewe-hospital-gets-green-light/</guid></item><item><title><![CDATA[Quartet of care home wins for Kori]]></title><description><![CDATA[Kori Construction has landed four new care home jobs worth a combined &pound;47m.<br />
Kori will be delivering two schemes each for repeat clients Care UK and Barchester Healthcare.<br />
Construction set to start this summer on the sites in Burnham, Weybridge, Liss and Crowthorne.The four developments are scheduled for completion from late 2027 and throughout 2028.<br />
Jordan Connachie, Managing Director at Kori Construction, said:&nbsp;&ldquo;Securing four new projects with two of the UK&rsquo;s leading care]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/quartet-of-care-home-wins-for-kori/</link><pubDate>Wed, 10 Jun 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/quartet-of-care-home-wins-for-kori/</guid></item><item><title><![CDATA[Duo share £1.2bn coastal beach management framework]]></title><description><![CDATA[The Environment Agency has appointed dredging and marine engineering specialists Van Oord and VBA Joint Venture to a &pound;1.23bn framework to maintain England&rsquo;s beaches and coastal flood defences over the next eight years.<br />
The Beach Management Framework will run initially for six years to 2032, with an option to extend for a further two years to 2034.<br />
The new deal effectively squeezes out firms like BAM Nuttall, Kier, and Jackson Civil Engineering which have historically been involved as]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/duo-share-12bn-coastal-beach-management-framework/</link><pubDate>Tue, 09 Jun 2026 23:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/duo-share-12bn-coastal-beach-management-framework/</guid></item><item><title><![CDATA[Plan unveiled for new London high-rise hospital in Paddington]]></title><description><![CDATA[Imperial College Healthcare has unveiled its plans for a landmark 30-storey replacement for St Mary&rsquo;s Hospital in Paddington that could open by 2035, eight years ahead of the current Government programme timetable.<br />
The proposed 800-bed major trauma and general hospital would replace ageing facilities at the 175-year-old west London site, where mounting maintenance problems and the discovery of reinforced autoclaved aerated concrete have accelerated the need for redevelopment.<br />
The scheme wo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plan-unveiled-for-new-london-high-rise-hospital-in-paddington/</link><pubDate>Tue, 09 Jun 2026 15:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plan-unveiled-for-new-london-high-rise-hospital-in-paddington/</guid></item><item><title><![CDATA[Thieves steal 6,000 litres of petrol from motorway site]]></title><description><![CDATA[Thousands of litres of petrol have been stolen from a construction site in Cheltenham.<br />
Gloucestershire Police are now appealing for witnesses after the raid at junction 10 of the M5 where Galliford Try is overseeing early works on a &pound;372m improvement job.<br />
Police said 6,000 litres of petrol were taken from plant assisting with the construction work.The theft is believed to have taken place over the late May Bank Holiday, between 5pm on Friday 23 May and 7am on Tuesday 26 May.<br />
Offenders brok]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/thieves-steal-6000-litres-of-petrol-from-motorway-site/</link><pubDate>Tue, 09 Jun 2026 12:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/thieves-steal-6000-litres-of-petrol-from-motorway-site/</guid></item><item><title><![CDATA[Glencar appoints former Curo director]]></title><description><![CDATA[Glencar has appointed Patrick Mays as Group Business Development Director.<br />
Mays joins from Curo Construction which suddenly ceased trading last month.<br />
He has more than two decades of construction experience having held similar roles at McLaren and Oakmont Construction.In his new role Mays will lead Glencar&rsquo;s business development strategy, focusing on&nbsp; strengthening client relationships, identifying new opportunities and supporting the company&rsquo;s&nbsp; continued expansion across i]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/glencar-appoints-former-curo-director/</link><pubDate>Tue, 09 Jun 2026 08:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/glencar-appoints-former-curo-director/</guid></item><item><title><![CDATA[Gleeson warns on profits after major land sale delay]]></title><description><![CDATA[Land sale delays have knocked a hole in MJ Gleeson&rsquo;s profit expectations after a major strategic site disposal slipped into the next financial year.<br />
The affordable homes builder warned that adjusted pre-tax profit for the year ending 30 June 2026 will come in about &pound;7.5m below market forecasts after its biggest planned land sale failed to complete before year-end.<br />
The delayed transaction accounts for around half of Gleeson Land&rsquo;s forecast plot sales this year and, alongside two]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gleeson-warns-on-profits-after-major-land-sale-delay/</link><pubDate>Tue, 09 Jun 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gleeson-warns-on-profits-after-major-land-sale-delay/</guid></item><item><title><![CDATA[Ceiling specialist Zentia falls into administration]]></title><description><![CDATA[Acoustic ceiling manufacturer Zentia has gone into administration with the loss of 170 jobs.<br />
Gateshead based Zentia Limited and Zentia Profiles had a combined turnover of more than &pound;50m.<br />
Will Wright and James Lumb from Interpath were appointed joint administrators to both businesses yesterday.The firms were&nbsp;market leading manufacturers of complete acoustic ceiling solutions, including mineral ceiling tiles, suspension grids, and floating ceiling systems.<br />
Interpath said the companies h]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ceiling-specialist-zentia-falls-into-administration/</link><pubDate>Tue, 09 Jun 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ceiling-specialist-zentia-falls-into-administration/</guid></item><item><title><![CDATA[Mace bags top spot in the May contracts rankings]]></title><description><![CDATA[Mace harvested the biggest crop of work in May after landing the &pound;250m contract to build the John Innes Centre and Sainsbury Laboratory plant and microbial research hub in Norwich. Alongside a noffice upgrade job in West London&rsquo;s Belgravia, it took the firm&rsquo;s tally of work to &pound;320m.<br />
House builder Hill Partnerships came in second place after securing two projects to build around 240 flats in London for Enfield Council and housing association Clarion Group respectively.<br />
McL]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-bags-top-spot-in-the-may-contracts-rankings/</link><pubDate>Tue, 09 Jun 2026 08:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-bags-top-spot-in-the-may-contracts-rankings/</guid></item><item><title><![CDATA[Galliford Try lands £39m East London SEND school build]]></title><description><![CDATA[Galliford Try has sealed a &pound;39m contract to build one of Britain&rsquo;s largest specialist schools after successfully completing the project&rsquo;s pre-construction phase.<br />
The London Borough of Havering has awarded the contractor the main works package for the Balgores SEND School at Gidea Park through a call-off from the Southern Construction Framework 5.<br />
The new school will provide places for up to 300 children and young people aged four to 19 with autistic spectrum disorder, severe le]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-lands-39m-east-london-send-school-build/</link><pubDate>Tue, 09 Jun 2026 08:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-lands-39m-east-london-send-school-build/</guid></item><item><title><![CDATA[Council building workers to strike over pay]]></title><description><![CDATA[More than a thousand local government craftworkers will take strike action later this month in a dispute over pay and conditions.<br />
The strikers &ndash; who predominantly undertake local authority housing maintenance and repair work &ndash; are employed at Bristol, Southwark, Stoke-on-Trent, Newham, Leeds and Babergh and Mid Suffolk councils.<br />
The workers will strike on 17,18, 23 and 24 June following the latest local government pay offer to Red Book workers.Employers offered a 3.2% increase linked]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/council-building-workers-to-strike-over-pay/</link><pubDate>Mon, 08 Jun 2026 16:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/council-building-workers-to-strike-over-pay/</guid></item><item><title><![CDATA[Tilbury Douglas reshuffles regional building team]]></title><description><![CDATA[Tilbury Douglas has promoted Simon Butler to managing director of its regional building business after growing its order book to &pound;1.6bn.<br />
Butler will lead the regional building arm as the contractor pushes ahead with its five-year growth plan and targets further expansion.<br />
The move follows a strong 2025 for the building, infrastructure, engineering and fit-out specialist. Butler&rsquo;s previous role at Tilbury Douglas was managing director of Building Central.Tilbury Douglas has also stren]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tilbury-douglas-reshuffles-regional-building-team/</link><pubDate>Mon, 08 Jun 2026 15:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tilbury-douglas-reshuffles-regional-building-team/</guid></item><item><title><![CDATA[Rhatigan’s UK arm powers towards £200m turnover mark]]></title><description><![CDATA[Irish contractor JJ Rhatigan&rsquo;s UK arm has continued its fast expansion, growing turnover by more than seven-fold in five years as it cements its position in the British market.<br />
The contractor, which recently opened a new London headquarters at 26 Finsbury Square in the City, lifted revenue 26% to &pound;195m in the year to October 2025 from &pound;154m previously. Pre-tax profit surged 74% to &pound;16.9m from &pound;9.7m a year earlier.<br />
The latest performance caps a period of rapid growth]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rhatigans-uk-arm-powers-towards-200m-turnover-mark/</link><pubDate>Mon, 08 Jun 2026 15:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rhatigans-uk-arm-powers-towards-200m-turnover-mark/</guid></item><item><title><![CDATA[£50m rescue loan to keep Manchester’s tallest tower on track]]></title><description><![CDATA[Manchester&rsquo;s bid to build the tallest tower outside London has been rescued after the Greater Manchester Combined Authority stepped in with a &pound;50m funding package to bridge a viability gap on the landmark scheme.<br />
The GMCA is reported to have approved the huge loan from its Good Growth Fund to unlock delivery of developer Salboy&rsquo;s Viadux Phase 2 development, paving the way for the 76-storey Nobu Manchester tower and a separate affordable housing block.<br />
Planning approval for the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/50m-rescue-loan-to-keep-manchesters-tallest-tower-on-track/</link><pubDate>Mon, 08 Jun 2026 09:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/50m-rescue-loan-to-keep-manchesters-tallest-tower-on-track/</guid></item><item><title><![CDATA[National Grid delay threatens McAlpine’s £1.25bn steel furnace finish]]></title><description><![CDATA[National Grid delays to a major power upgrade could leave Sir Robert McAlpine&rsquo;s &pound;1.25bn electric arc furnace project at Port Talbot waiting months for a live electricity connection after construction is complete.<br />
Tata Steel has revealed that problems delivering the electrical infrastructure needed to power the giant furnace will delay commissioning by between six and eight months and potentially longer.<br />
The critical path for delivery of the UK&rsquo;s key green steel production proje]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/national-grid-delay-threatens-mcalpines-125bn-steel-furnace-finish/</link><pubDate>Mon, 08 Jun 2026 08:48:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/national-grid-delay-threatens-mcalpines-125bn-steel-furnace-finish/</guid></item><item><title><![CDATA[Kier opens £70m subcontractor hunt on Army barracks rebuild]]></title><description><![CDATA[Kier has launched a major supply chain recruitment drive for its &pound;243m overhaul of Keogh Barracks in Aldershot, inviting firms to bid for major construction packages worth nearly &pound;70m.<br />
The contractor is delivering the Ministry of Defence scheme under the Defence Estate Optimisation Single Living Accommodation and Technical Infrastructure Programme, which will modernise living, working and training facilities across the Army base over the next five years.<br />
Kier has now started market e]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-opens-70m-subcontractor-hunt-on-army-barracks-rebuild/</link><pubDate>Mon, 08 Jun 2026 08:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-opens-70m-subcontractor-hunt-on-army-barracks-rebuild/</guid></item><item><title><![CDATA[Getjar revenue up a third as Gateway 2 bottlenecks start to ease]]></title><description><![CDATA[Concrete frame specialist Getjar lifted turnover by a third and increased pre-tax profit in 2025 as it continued to expand its piling, groundworks, cut-and-carve and precast operations despite tough market conditions.<br />
The Borehamwood-based contractor grew revenue by around a third to &pound;96m in the year to 31 August 2025 from &pound;72m previously, while pre-tax profit edged up 14% to &pound;2m.<br />
Directors said the business had maintained a strong balance sheet despite severe competition, high]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/getjar-revenue-up-a-third-as-gateway-2-bottlenecks-start-to-ease/</link><pubDate>Mon, 08 Jun 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/getjar-revenue-up-a-third-as-gateway-2-bottlenecks-start-to-ease/</guid></item><item><title><![CDATA[Brick firms buys fencing company]]></title><description><![CDATA[Construction materials distributor BRCK Group has acquired H.S. Jackson &amp; Son (Fencing) Limited for an initial consideration of &pound;15m.<br />
BRCK Group &ndash; formerly known as Brickability &ndash; was the subject of a failed takeover bid earlier this year by Bovis owner Atlas.<br />
Kent headquartered Jacksons is a designer, manufacturer and installer of premium timber and steel fencing, gates and perimeter security systems and serves a broad range of residential, commercial, industrial and high-]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/brick-firms-buys-fencing-company/</link><pubDate>Mon, 08 Jun 2026 08:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/brick-firms-buys-fencing-company/</guid></item><item><title><![CDATA[Curo Living changes name after construction arm collapse]]></title><description><![CDATA[Residential contractor Curo Living has changed its name weeks after the main Curo Construction and Curo Interiors operations ceased trading.<br />
Curo Living is now known as Sorel Living. The company said: &ldquo;This isn&rsquo;t just a rebrand, it&rsquo;s a reflection of how far we&rsquo;ve come and where we&rsquo;re headed.<br />
&ldquo;Our new name and strapline &lsquo;Building Better Homes&rsquo; captures everything we stand for: quality, collaboration, professionalism, and always putting our clients f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/curo-living-changes-name-after-construction-arm-collapse/</link><pubDate>Mon, 08 Jun 2026 08:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/curo-living-changes-name-after-construction-arm-collapse/</guid></item><item><title><![CDATA[Knights Brown rides coastal work boom to record profit haul]]></title><description><![CDATA[Hampshire-based civils contractor Knights Brown almost doubled pre-tax profit in a record year as a surge in coastal and ports work helped drive revenue past &pound;136m.<br />
The specialist contractor increased turnover 17% to &pound;136m in the year to March 2026, up from &pound;116m previously, while pre-tax profit climbed 62% to &pound;4.6m from &pound;2.8m.<br />
Operating margin rose to 3.3% from 2.5% a year earlier as project delivery and commercial performance improved across the business.The 350-s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/knights-brown-rides-coastal-work-boom-to-record-profit-haul/</link><pubDate>Fri, 05 Jun 2026 11:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/knights-brown-rides-coastal-work-boom-to-record-profit-haul/</guid></item><item><title><![CDATA[McAlpine hires former Wates director as healthcare MD]]></title><description><![CDATA[Sir Robert McAlpine has hired healthcare specialist Simon Kydd to spearhead its health sector business as the race to deliver the Government&rsquo;s New Hospital Programme gathers pace.<br />
Kydd joins as health sector managing director, replacing Stuart McArthur, who is stepping down after a decade helping build the contractor&rsquo;s healthcare operation and its market-leading IHP joint venture with Vinci Building.<br />
He brings more than 20 years of healthcare sector experience to Sir Robert McAlpine.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcalpine-hires-former-wates-director-as-healthcare-md/</link><pubDate>Fri, 05 Jun 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcalpine-hires-former-wates-director-as-healthcare-md/</guid></item><item><title><![CDATA[Erith bags Ratcliffe power station demolition mega-job]]></title><description><![CDATA[Erith has been appointed to dismantle the former Ratcliffe-on-Soar Power Station in a vast four-year demolition programme that will eventually bring down the site&rsquo;s iconic cooling towers.<br />
The contractor will mobilise this summer before starting demolition works later this year on what remains one of the UK&rsquo;s largest industrial clearance projects.<br />
Over the next four years Erith will strip out and demolish all former structures, remove waste materials and leave the 700-acre site ready]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/erith-bags-ratcliffe-power-station-demolition-mega-job/</link><pubDate>Fri, 05 Jun 2026 08:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/erith-bags-ratcliffe-power-station-demolition-mega-job/</guid></item><item><title><![CDATA[Raft of redundancies at consultant Cundall]]></title><description><![CDATA[Consultancy giant Cundall has undergone a round of redundancies as industry work levels continue to fall.<br />
The Enquirer understands that &ldquo;low single digit&rdquo; job losses have been implemented across Cundall&rsquo;s 1,300 strong workforce<br />
A Cundall spokesperson said:&nbsp; &ldquo;To ensure we are meeting project requirements and client workloads, we have taken steps to streamline our operations, which has included moving some colleagues into growth sectors and, regrettably, some unavoidab]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/raft-of-redundancies-at-consultant-cundall/</link><pubDate>Fri, 05 Jun 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/raft-of-redundancies-at-consultant-cundall/</guid></item><item><title><![CDATA[Watkin Jones green light for Cardiff 33-storey co-living tower]]></title><description><![CDATA[Developer Watkin Jones has secured planning committee backing for a 400-unit co-living tower in the centre of Cardiff.<br />
The build-to-rent specialist has received a resolution to grant planning permission for the Custom House Street scheme, subject to completion of a Section 106 agreement.<br />
Formal planning permission is expected in late summer.The 33-storey project will regenerate a long-vacant city centre site close to Cardiff Central Station and St David&rsquo;s Shopping Centre. An originally pla]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-green-light-for-cardiff-33-storey-co-living-tower/</link><pubDate>Thu, 04 Jun 2026 20:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-green-light-for-cardiff-33-storey-co-living-tower/</guid></item><item><title><![CDATA[House building downturn drags construction to six-year low]]></title><description><![CDATA[The UK construction sector suffered its steepest downturn for six years in May as house building activity sank further, new orders dried up and contractors faced the sharpest materials inflation since 2022.<br />
Latest data from the S&amp;P Global UK Construction PMI showed overall activity falling to 38.2 in May from 39.7 in April, marking a seventeenth consecutive month of contraction and the weakest reading since the pandemic shock of May 2020.<br />
Outside the pandemic period, the decline was the shar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/house-building-downturn-drags-construction-to-six-year-low/</link><pubDate>Thu, 04 Jun 2026 13:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/house-building-downturn-drags-construction-to-six-year-low/</guid></item><item><title><![CDATA[Green light for £59m Swadlincote civic and leisure hub]]></title><description><![CDATA[Enabling works are set to start this summer on a &pound;59m leisure centre and civic office scheme in Swadlincote after planners gave the project the green light.<br />
The South Derbyshire District Council scheme will replace the existing Green Bank Leisure Centre and council offices as part of a wider town centre regeneration push.<br />
BAM and Bowmer &amp; Kirkland are understood to chasing the build contract for the complex which was designed by CPMG Architects.The leisure element will include a six-co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-59m-swadlincote-civic-and-leisure-hub/</link><pubDate>Thu, 04 Jun 2026 13:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-59m-swadlincote-civic-and-leisure-hub/</guid></item><item><title><![CDATA[Scottish Hydro sparks £7.4bn contractor framework race]]></title><description><![CDATA[Scottish Hydro Electric Transmission has launched a &pound;7.4bn framework hunt for contractors to help deliver its expanding high-voltage network investment programme across Scotland.<br />
The utility giant is seeking long-term strategic delivery partners across six workstreams covering civils, buildings, overhead lines and underground cable construction under framework agreements that could run for up to eight years.<br />
The framework will support transmission network upgrades, customer connections, as]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scottish-hydro-sparks-74bn-contractor-framework-race/</link><pubDate>Thu, 04 Jun 2026 13:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scottish-hydro-sparks-74bn-contractor-framework-race/</guid></item><item><title><![CDATA[A9 dualling race starts for £1.9bn mega framework]]></title><description><![CDATA[Transport for Scotland has kicked off the race to find contractors to deliver the final 58mile stretch of the A9 dualling programme from Perth to Inverness.<br />
After a delivery review it is switching to a framework-led approach to deliver the final five contracts on the programme, ditching the previous project-by-project tender model.<br />
The new &pound;1.94bn framework is designed to bring contractors into schemes earlier through an early contractor involvement model. Officials believe the approach wi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/a9-dualling-race-starts-for-19bn-mega-framework/</link><pubDate>Thu, 04 Jun 2026 13:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/a9-dualling-race-starts-for-19bn-mega-framework/</guid></item><item><title><![CDATA[Labourer drowns in water-filled site excavation]]></title><description><![CDATA[A contractor has been fined after a man drowned when he fell into an exposed excavation hole described as a &lsquo;death trap&rsquo;, at a building site in Hertfordshire.<br />
Mykhalio Hustei had been working for Alchemist DB Limited as a labourer on a project building several flats on the High Street in Bovington.<br />
The 35-year-old had been living in a property adjoining the site when he attempted to make his way home from a night out on 22 October 2021. As he tried to access his own home he fell into]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/labourer-drowns-in-water-filled-site-excavation/</link><pubDate>Thu, 04 Jun 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/labourer-drowns-in-water-filled-site-excavation/</guid></item><item><title><![CDATA[Hollywood giant gears up for £5bn UK resort build]]></title><description><![CDATA[Main construction work is poised to start on Hollywood giant Universal&rsquo;s &pound;5bn UK theme park after ministers committed &pound;1.3bn to unlock the transport and infrastructure upgrades needed to make the Bedfordshire mega-project a reality.<br />
The entertainment resort, branded Universal United Kingdom Resort, will rise on the former Kempston Hardwick brickworks site and is set to become Universal&rsquo;s first theme park destination in Europe.<br />
Government backing will fund road, rail and c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hollywood-giant-gears-up-for-5bn-uk-resort-build/</link><pubDate>Thu, 04 Jun 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hollywood-giant-gears-up-for-5bn-uk-resort-build/</guid></item><item><title><![CDATA[Hinkley workers locked-out of site after canteen sit-in]]></title><description><![CDATA[M&amp;E workers at the Hinkley Point C nuclear site have been banned from the job for a week after staging a canteen sit-in.<br />
Hundreds of workers from the MEH Alliance have been told not to return to the job until next Monday.<br />
A long-running dispute came to a head earlier this week as workers staged the sit-in protest over shift pattern changes and safety concerns.Site management told the protesters not to return to the site until next week without pay.<br />
A heavy police presence was also evident th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hinkley-workers-locked-out-of-site-after-canteen-sit-in/</link><pubDate>Thu, 04 Jun 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hinkley-workers-locked-out-of-site-after-canteen-sit-in/</guid></item><item><title><![CDATA[Hunt starts for £60m Crystal Palace Park housing contractor]]></title><description><![CDATA[Clarion Housing has launched the search for a main contractor to deliver 202 affordable homes at Crystal Palace Park following planning approval for the long-awaited scheme.<br />
The housing association&rsquo;s development arm has issued a &pound;60m design-and-build tender covering two sites at Rockhills and Sydenham Villas on the edge of the South London park.<br />
The project will deliver 148 homes for social rent and 54 shared ownership properties, alongside a new community centre, landscaping, access]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hunt-starts-for-60m-crystal-palace-park-housing-contractor/</link><pubDate>Thu, 04 Jun 2026 08:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hunt-starts-for-60m-crystal-palace-park-housing-contractor/</guid></item><item><title><![CDATA[BSR turns the tide as approvals outpace new home applications]]></title><description><![CDATA[The Building Safety Regulator is finally getting ahead of the Gateway 2 queue, approving more new homes than are entering the system for the first time since the regime was introduced.<br />
In the 12 weeks to 30 May, the regulator determined applications covering 14,928 homes while receiving new submissions for 13,964 homes, signalling that the long-running backlog is beginning to move in the right direction.<br />
Project approval rates are also climbing sharply.Across all Gateway 2 categories &ndash; new]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bsr-turns-the-tide-as-approvals-outpace-new-home-applications/</link><pubDate>Thu, 04 Jun 2026 08:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bsr-turns-the-tide-as-approvals-outpace-new-home-applications/</guid></item><item><title><![CDATA[Government and Hill seal land for 10,000-home Cambridge site]]></title><description><![CDATA[Hill Group and Homes England have set a 2029 start date for the first homes at the giant Cambridge East development after completing the acquisition of the 700-acre former airport site.<br />
The partners plan to begin construction of an initial phase of up to 500 homes from 2029 as they push ahead with one of the UK&rsquo;s largest urban extension projects. The wider scheme will eventually deliver more than 10,000 homes, 3m sq ft of commercial space and around 9,000 jobs.<br />
The deal sees Homes England,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-and-hill-seal-land-for-10000-home-cambridge-site/</link><pubDate>Wed, 03 Jun 2026 17:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-and-hill-seal-land-for-10000-home-cambridge-site/</guid></item><item><title><![CDATA[Government and Hill seal land for 10,000-home Cambridge East scheme]]></title><description><![CDATA[THill Group and Homes England have set a 2029 start date for the first homes at the giant Cambridge East development after completing the acquisition of the 700-acre former airport site.<br />
The partners plan to begin construction of an initial phase of up to 500 homes from 2029 as they push ahead with one of the UK&rsquo;s largest urban extension projects. The wider scheme will eventually deliver more than 10,000 homes, 3m sq ft of commercial space and around 9,000 jobs.<br />
The deal sees Homes England]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-and-hill-seal-land-for-10000-home-cambridge-east-scheme/</link><pubDate>Wed, 03 Jun 2026 17:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-and-hill-seal-land-for-10000-home-cambridge-east-scheme/</guid></item><item><title><![CDATA[Murphy builds record £412m cash pile in 75th year]]></title><description><![CDATA[Murphy capped its 75th anniversary year with record revenue, profit and cash reserves as booming investment in Britain&rsquo;s energy and infrastructure networks pushed its order book beyond &pound;8bn for the first time.<br />
The family-owned contractor increased revenue 13% to nearly &pound;1.6bn in 2025 while operating profit climbed 8% to a record &pound;86m.<br />
Cash reserves further strengthened, rising to &pound;412m, leaving Murphy with one of the strongest balance sheets in the industry.The perf]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/murphy-builds-record-412m-cash-pile-in-75th-year/</link><pubDate>Wed, 03 Jun 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/murphy-builds-record-412m-cash-pile-in-75th-year/</guid></item><item><title><![CDATA[Willmott Dixon keeping close eye on supply chain]]></title><description><![CDATA[Willmott Dixon is promising to look after its supply chain amid worries over industry price inflation.<br />
The contractor has posted a strong set of annual results and reported an encouraging start to this financial year.<br />
But&nbsp; Chief Executive Officer Graham Dundas said: &ldquo;We remain far from complacent about the wider economic picture, including the risk of renewed inflation from geopolitical events.&ldquo;Across our industry, prices are coming under strain, and I&rsquo;m conscious that our]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-keeping-close-eye-on-supply-chain/</link><pubDate>Wed, 03 Jun 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-keeping-close-eye-on-supply-chain/</guid></item><item><title><![CDATA[McLaren wins £1bn data centre campus near M25]]></title><description><![CDATA[McLaren Construction has been drafted in to spearhead delivery of US developer Corscale&rsquo;s &pound;1bn data centre campus at Iver in Buckinghamshire.<br />
The contractor and MEP specialist Phoenix ME have secured a pre-construction services agreement for the 14-acre Court Lane site alongside the M25, launching a scheme that will transform a rundown industrial estate into a hyperscale data centre campus.<br />
Works will start on 1 July with site clearance, utility diversions and remediation operations]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-wins-1bn-data-centre-campus-near-m25/</link><pubDate>Wed, 03 Jun 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-wins-1bn-data-centre-campus-near-m25/</guid></item><item><title><![CDATA[HS2 finally slides in giant Curzon bridge after welding delay]]></title><description><![CDATA[HS2 engineers have finally slid the tallest bridge on the scheme into position above Birmingham&rsquo;s Cross City railway line after overcoming major welding challenges that delayed the operation by almost a year.<br />
The 4,200-tonne Curzon 2 structure was moved 180 metres in a complex three-stage launch and is now locked onto permanent piers, creating a new 40m-high landmark on the approach to Curzon Street Station.The successful launch marks a major milestone on the Birmingham section of the rail]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-finally-slides-in-giant-curzon-bridge-after-welding-delay/</link><pubDate>Wed, 03 Jun 2026 08:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-finally-slides-in-giant-curzon-bridge-after-welding-delay/</guid></item><item><title><![CDATA[Construction test scam kingpin jailed over 500 fake safety passes]]></title><description><![CDATA[A test centre boss has been jailed after running a large-scale fraud racket that helped hundreds of workers dodge mandatory construction safety exams.<br />
William White, 63, was sentenced to two years and seven months in prison after admitting conspiracy to defraud and converting criminal property following a joint investigation by the Construction Industry Training Board and Essex Police.<br />
The investigation exposed a sophisticated operation at the Whitewaters Training Centre in Halstead, Essex, wher]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-test-scam-kingpin-jailed-over-500-fake-safety-passes/</link><pubDate>Tue, 02 Jun 2026 15:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-test-scam-kingpin-jailed-over-500-fake-safety-passes/</guid></item><item><title><![CDATA[Drainage giant Lanes names ex-Telent chief as new CEO]]></title><description><![CDATA[Lanes Group has appointed former Telent chief executive Jo Gretton as its new chief executive officer, ending more than three decades under the leadership of Wayne Earnshaw.<br />
Gretton will take over on 29 June as the UK&rsquo;s biggest drainage and wastewater maintenance specialist prepares for its next stage of growth following BlackRock&rsquo;s investment in the business last year.<br />
Gretton will work alongside Earnshaw to ensure a smooth transition before formally taking charge at the end of June]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/drainage-giant-lanes-names-ex-telent-chief-as-new-ceo/</link><pubDate>Tue, 02 Jun 2026 15:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/drainage-giant-lanes-names-ex-telent-chief-as-new-ceo/</guid></item><item><title><![CDATA[Tide unlocks £500m of projects after Gateway 2 approvals]]></title><description><![CDATA[Modular tower specialist Tide Construction has finally secured building safety regulator approvals on several major schemes, releasing more than &pound;500m of projects after Gateway 2 delays hit turnover last year.<br />
The contractor saw turnover slump 42% to &pound;109m in the year to 31 August 2025, while pre-tax profit fell to &pound;2.3m from &pound;4.9m as the firm waited for regulatory sign-off on several projects.<br />
A spokesman for Tide said: &ldquo;With the requirements of the Building Safety]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tide-unlocks-500m-of-projects-after-gateway-2-approvals/</link><pubDate>Tue, 02 Jun 2026 14:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tide-unlocks-500m-of-projects-after-gateway-2-approvals/</guid></item><item><title><![CDATA[£640m Slough town centre reboot heads for planning]]></title><description><![CDATA[Plans have been lodged for the &pound;640m North West Quadrant regeneration scheme in Slough, paving the way for one of the largest town centre redevelopment projects in the South East.<br />
Developer Muse and Homes England have submitted a planning application to transform the 3.6ha former Thames Valley University site into a mixed-use neighbourhood delivering around 1,500 homes, offices, shops, caf&eacute;s and community facilities over the next decade.<br />
The project forms a cornerstone of Slough tow]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/640m-slough-town-centre-reboot-heads-for-planning/</link><pubDate>Tue, 02 Jun 2026 13:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/640m-slough-town-centre-reboot-heads-for-planning/</guid></item><item><title><![CDATA[Balfour shakes-up leadership to “sharpen focus”]]></title><description><![CDATA[Balfour Beatty has confirmed a raft of leadership changes to &ldquo;strengthen customer focus, improve project performance and drive greater efficiencies&rdquo;.<br />
The moves bring together the group&rsquo;s capabilities across UK transport, energy and defence&nbsp; in a bid to enable &ldquo;faster, more joined-up delivery of major infrastructure programmes and closer alignment with critical national infrastructure priorities.&rdquo;<br />
(L-r) Nick Crossfield, Phil Clifton, Steve Tarr<br />
UK Defence, Power]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-shakes-up-leadership-to-sharpen-focus/</link><pubDate>Tue, 02 Jun 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-shakes-up-leadership-to-sharpen-focus/</guid></item><item><title><![CDATA[Housing civils firm Agetur files for administration]]></title><description><![CDATA[Northamptonshire civil engineering and groundworks contractor Agetur has filed a notice of intention to appoint administrators leaving more than 100 staff facing redundancies.<br />
The move yesterday marks the first formal step in an insolvency process for the Brackley-based housing infrastructure specialist, giving it temporary protection from creditor action while administrators are appointed and options for the business are explored.<br />
Agetur was founded in 1985 by Rob Rexton and built its reputatio]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/housing-civils-firm-agetur-files-for-administration/</link><pubDate>Tue, 02 Jun 2026 08:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/housing-civils-firm-agetur-files-for-administration/</guid></item><item><title><![CDATA[Building control shake-up backed by ministers]]></title><description><![CDATA[Ministers have pledged &pound;55m to overhaul England&rsquo;s building control system as they consider banning clients from choosing their own inspectors.<br />
The Government has accepted the core principles of Dame Judith Hackitt&rsquo;s Building Control Independent Panel, which warned the current system is fragmented, inconsistent and exposed to commercial pressure.<br />
The panel said the present set-up cannot provide consistent assurance that building work is safe, with inspectors battling shortages,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/building-control-shake-up-backed-by-ministers/</link><pubDate>Fri, 22 May 2026 09:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/building-control-shake-up-backed-by-ministers/</guid></item><item><title><![CDATA[Government starts renewal race for £120bn mega framework]]></title><description><![CDATA[Crown Commercial Service has fired the starting gun on bidding for the Government&rsquo;s biggest construction framework renewal.<br />
The third-generation Construction Works and Associated Services framework, including ProCure24, has now gone out to tender with an estimated total value of &pound;120bn.<br />
The pan-Government deal, known as RM6320, will replace and consolidate several major routes to market for public sector building, infrastructure, defence, healthcare, nuclear and overseas works.<br />
It wi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-starts-renewal-race-for-120bn-mega-framework/</link><pubDate>Fri, 22 May 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-starts-renewal-race-for-120bn-mega-framework/</guid></item><item><title><![CDATA[Trading in Hercules shares resumes after audit concerns]]></title><description><![CDATA[Shares in labour supply specialist Hercules resumed trading this morning following a two-month suspension after the firm&rsquo;s delayed results were finally published.<br />
The shares were suspended in March but results have now been released for the year to 30 September 2025 containing qualifications from the auditor.<br />
The auditor said: &ldquo;During our audit work, we were approached by an individual who raised concerns relating to payments made to a limited number of training and consultancy servi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/trading-in-hercules-shares-resumes-after-audit-concerns/</link><pubDate>Fri, 22 May 2026 09:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/trading-in-hercules-shares-resumes-after-audit-concerns/</guid></item><item><title><![CDATA[£150m Cambridge busway opens race for contractor]]></title><description><![CDATA[Contractors are being called up to bid for the &pound;150m Cambourne to Cambridge guided busway.<br />
Cambridgeshire County Council, acting for the Greater Cambridge Partnership, is seeking to appoint a single contractor to deliver the transport scheme.<br />
The scheme will deliver a new dedicated busway linking the fast-growing settlement of Cambourne with Cambridge, alongside a new park-and-ride site aimed at cutting congestion on the A428 corridor.Construction is expected to start in early 2027 with wo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/150m-cambridge-busway-opens-race-for-contractor/</link><pubDate>Fri, 22 May 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/150m-cambridge-busway-opens-race-for-contractor/</guid></item><item><title><![CDATA[JJ Rhatigan lands £32m London Chest Hospital housing job]]></title><description><![CDATA[JJ Rhatigan has beaten Lovell, Graham and Formation Design &amp; Build to a &pound;32m first phase job at the former London Chest Hospital site in Bethnal Green.<br />
The design and build deal covers two blocks providing 76 affordable homes and associated landscaping works.<br />
Client Bonner Road LLP, linked to Clarion Housing Group&rsquo;s development arm Latimer, picked Rhatigan after a four-way tender race.A contract will be signed from 1 June with works running through to February 2031.<br />
The phase for]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jj-rhatigan-lands-32m-london-chest-hospital-housing-job/</link><pubDate>Fri, 22 May 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jj-rhatigan-lands-32m-london-chest-hospital-housing-job/</guid></item><item><title><![CDATA[Competition and markets watchdog blows whistle on civils costs]]></title><description><![CDATA[The competition watchdog has called for a major shake-up of public road and rail procurement after warning that high costs and overruns are holding back the civil engineering market.<br />
The Competition and Markets Authority said fragmented buying, short-term funding and inconsistent procurement are weakening contractor confidence and stopping firms from investing in people, plant and innovation.<br />
Its final Civil Engineering Market Study said public bodies spent around &pound;19bn on roads and rail i]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/competition-and-markets-watchdog-blows-whistle-on-civils-costs/</link><pubDate>Thu, 21 May 2026 12:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/competition-and-markets-watchdog-blows-whistle-on-civils-costs/</guid></item><item><title><![CDATA[Rydon losses deepen as remediation spend hits £31m]]></title><description><![CDATA[Rydon Group sank to a &pound;4.9m pre-tax loss last year as building safety remediation costs continued to weigh on the maintenance and construction business.<br />
Latest accounts for the Dartford-based group show losses widened sharply in the year to 30 September 2025 from &pound;1.0m last time as turnover also fell 14% to &pound;52m from &pound;61m.<br />
Revenue has fallen sharply since pre-Grenfell disaster levels that stood around &pound;250m for the group.<br />
Rydon said its maintenance arm continued to]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rydon-losses-deepen-as-remediation-spend-hits-31m/</link><pubDate>Thu, 21 May 2026 09:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rydon-losses-deepen-as-remediation-spend-hits-31m/</guid></item><item><title><![CDATA[Winchmore wins brickwork package on Kori care home]]></title><description><![CDATA[Winchmore Brickwork has won the &pound;2.5m masonry package on a new &pound;30m care home being built by Kori Construction in north London.<br />
Winchmore will start on site towards the back end of this year.<br />
The specialist is looking to work with Kori on other projects as the company expands its presence in and around London.<br />
The Enquirer understands Winchmore is also in negotiations with Kori at its care home site in Chiswick.Winchmore Managing Director Lee Campbell highlighted the benefits of form]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winchmore-wins-brickwork-package-on-kori-care-home/</link><pubDate>Thu, 21 May 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winchmore-wins-brickwork-package-on-kori-care-home/</guid></item><item><title><![CDATA[Contractors forced into weekly price checks as volatility grows]]></title><description><![CDATA[Subcontractors are being forced to check material prices and availability every week as renewed market volatility hits construction.<br />
Southern Construction Framework&rsquo;s latest market report for the first quarter of the year warns that pricing and supply conditions are now shifting week by week rather than month by month.<br />
The report, based on a survey of over 150 subcontractors, said tender workload rose by 2.6% during the first quarter as clients continued to test the market and bring scheme]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-forced-into-weekly-price-checks-as-volatility-grows/</link><pubDate>Thu, 21 May 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-forced-into-weekly-price-checks-as-volatility-grows/</guid></item><item><title><![CDATA[Hunt for developer to restart stalled Broad Marsh site]]></title><description><![CDATA[Homes England has started the hunt for a developer partner to reboot the stalled redevelopment of Nottingham&rsquo;s former Broad Marsh shopping centre.<br />
The government housing agency launched preliminary market engagement at UKREiiF as it looks to turn the stalled city centre site into a new mixed-use quarter.<br />
The former shopping centre has stood partly demolished since retail giant intu collapsed in 2020, leaving one of Nottingham&rsquo;s most prominent sites in limbo.<br />
Homes England stepped in]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hunt-for-developer-to-restart-stalled-broad-marsh-site/</link><pubDate>Thu, 21 May 2026 08:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hunt-for-developer-to-restart-stalled-broad-marsh-site/</guid></item><item><title><![CDATA[Yorkshire house builder unveils rebrand]]></title><description><![CDATA[A family-owned housebuilder based in West Yorkshire has unveiled its new name as it rebrands.<br />
Avari, formerly known as Yorkshire Choice Homes, has been established for just over a decade and has constructed a number of developments primarily in West and South Yorkshire.<br />
It forms one part of the newly established Avari Homes which also incorporates Avari Partnerships, Avari Construction and Avari Civil Engineering.<br />
Jason Begg, Managing Director, Avari Homes said:&nbsp; &ldquo;The Yorkshire Choice]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/yorkshire-house-builder-unveils-rebrand/</link><pubDate>Wed, 20 May 2026 22:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/yorkshire-house-builder-unveils-rebrand/</guid></item><item><title><![CDATA[Barry Dodd takes charge at PJ Hegarty UK business]]></title><description><![CDATA[PJ Hegarty has appointed Barry Dodd as Managing Director UK where he will oversee a business with a projected turnover of &pound;110m this year.<br />
Dodd joined PJ Hegarty in 1998 and played a key role in the successful launch of the UK business in 2010 with a focus on civil engineering and industrial projects.<br />
Current and recent works include HS2, Sizewell C and Gatwick Airport as well as large private pharma projects.Dodd said: &ldquo;Having been part of PJ Hegarty for more than 25 years and invol]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barry-dodd-takes-charge-at-pj-hegarty-uk-business/</link><pubDate>Wed, 20 May 2026 14:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barry-dodd-takes-charge-at-pj-hegarty-uk-business/</guid></item><item><title><![CDATA[Capital&amp;Centric to lead &pound;50m Plymouth civic centre revival]]></title><description><![CDATA[Developer Capital&amp;Centric has been picked to deliver the &pound;50m revival of Plymouth&rsquo;s long-empty Civic Centre tower.<br />
The social impact developer will convert the Grade II-listed 14-storey landmark on Armada Way into 144 build-to-rent flats.<br />
A full planning application for the BDP-designed retrofit was submitted in March and early works to strip cladding from the former council headquarters are due to start this summer.Plymouth City Council has now agreed to enter into an agreement]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/capitalampcentric-to-lead-pound50m-plymouth-civic-centre-revival/</link><pubDate>Wed, 20 May 2026 12:51:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/capitalampcentric-to-lead-pound50m-plymouth-civic-centre-revival/</guid></item><item><title><![CDATA[Willmott Dixon brings development under one roof]]></title><description><![CDATA[Willmott Dixon has launched a new developments business<br />
Willmott Dixon Developments brings together the group&rsquo;s existing development, investment and regeneration capability under a single national platform.<br />
It is led by David Atkinson, Director of Development and Investment, and Chris Wheeler, National Head of Land and Development, supported by regional development teams across England and Wales.The business will target four areas where it has an established track record:Regeneration and d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-brings-development-under-one-roof/</link><pubDate>Wed, 20 May 2026 12:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-brings-development-under-one-roof/</guid></item><item><title><![CDATA[Dalkia to deliver green hydrogen plant in Cumbria]]></title><description><![CDATA[Dalkia has the contract to deliver the Barrow Green Hydrogen project in Cumbria.<br />
Main construction works will start in the summer with the start of commercial operation within the next two years.<br />
The project is being delivered by Green Hydrogen Energy Company (GHECO) and the 30MW green hydrogen plant will be used by Kimberly-Clark to power its factory in the town.Dalkia will manage the total range of services from design to commissioning using modular construction and prefabrication techniques t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dalkia-to-deliver-green-hydrogen-plant-in-cumbria/</link><pubDate>Wed, 20 May 2026 11:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dalkia-to-deliver-green-hydrogen-plant-in-cumbria/</guid></item><item><title><![CDATA[Retentions axe will take three years to fall]]></title><description><![CDATA[Government plans to outlaw cash retentions in construction will take up to three years to fully bite once the new Commercial Payments Bill becomes law.<br />
The Bill sets out the clearest route yet to scrap the hated retention system after decades of campaigning by subcontractors and specialist contractors.<br />
Retentions see clients and main contractors hold back a slice of supply chain payments, usually until defects are fixed or a defects period expires.<br />
Specialists have long argued the system drains]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/retentions-axe-will-take-three-years-to-fall/</link><pubDate>Wed, 20 May 2026 08:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/retentions-axe-will-take-three-years-to-fall/</guid></item><item><title><![CDATA[Funding boost for construction V Levels]]></title><description><![CDATA[The government is pledging a &pound;96m boost for construction training as new V Levels are introduced in more site subjects.<br />
New subjects include construction design, bricklaying and plumbing at V Level which replace legacy qualifications like BTECs.<br />
Tens of thousands of extra work placements will also be created for learners who start their construction courses this September.The new V (vocational) Levels will sit alongside A levels and T levels. Equivalent to one A Level, they will allow stud]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/funding-boost-for-construction-v-levels/</link><pubDate>Wed, 20 May 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/funding-boost-for-construction-v-levels/</guid></item><item><title><![CDATA[Morgan Sindall wins lead role in £25m Andover theatre build]]></title><description><![CDATA[Morgan Sindall is set to sign a &pound;25m contract to build Andover&rsquo;s new town centre theatre.<br />
Test Valley Borough Council picked the contractor through a two-stage tender to deliver pre-construction services and main works for the flagship regeneration scheme.<br />
The new venue will replace the former Poundstretcher unit on the High Street, which is being demolished under a separate contract.It will become the new home for The Lights theatre, currently based next to Andover leisure centre.<br />
T]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-wins-lead-role-in-25m-andover-theatre-build/</link><pubDate>Wed, 20 May 2026 08:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-wins-lead-role-in-25m-andover-theatre-build/</guid></item><item><title><![CDATA[10 contractors paired with new hospital jobs worth £14bn]]></title><description><![CDATA[Ten contractors have been paired with NHS trusts to deliver the first tranche of the &pound;14bn Wave 1 of the Government&rsquo;s New Hospital Programme.<br />
Skanska is the only firm to land two schemes after being lined up for the James Paget Hospital rebuild in Great Yarmouth and the Queen Elizabeth Hospital job in King&rsquo;s Lynn.<br />
The Wave 1 hospital jobs include seven RAAC-hit hospitals that were pushed to the front of the &pound;60bn programme after reviews found they could not safely operate]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/10-contractors-paired-with-new-hospital-jobs-worth-14bn/</link><pubDate>Wed, 20 May 2026 08:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/10-contractors-paired-with-new-hospital-jobs-worth-14bn/</guid></item><item><title><![CDATA[Twenty firms could face charges over Grenfell fire]]></title><description><![CDATA[Up to 20 companies and 57 individuals could face criminal charges over the Grenfell Tower fire.<br />
The figures were confirmed in an update by the Metropolitan Police into the investigation following the disaster in 2017 which killed 72 people.<br />
The police investigation is set to complete by September when files will be handed to the Crown Prosecution Service for charging decisions.Potential charges include corporate manslaughter, gross negligence manslaughter, misconduct in public office, fraud and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/twenty-firms-could-face-charges-over-grenfell-fire/</link><pubDate>Tue, 19 May 2026 16:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/twenty-firms-could-face-charges-over-grenfell-fire/</guid></item><item><title><![CDATA[Cost to complete HS2 hits £102.7bn]]></title><description><![CDATA[The cost of completing HS2 has risen again with a new estimated budget in the range of &pound; 87.7 &ndash; 102.7 billion.<br />
The latest numbers were unveiled by Transport Secretary Heidi Alexander as she also confirmed the opening of the full route between London Euston to Birmingham Curzon Street and to the connection to the West Coast Main Line at Handsacre Junction will not happen until &ldquo;between May 2040 and December 2043.&rdquo;<br />
Top speeds on the route will also be reduced to cut costs.H]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cost-to-complete-hs2-hits-1027bn/</link><pubDate>Tue, 19 May 2026 15:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cost-to-complete-hs2-hits-1027bn/</guid></item><item><title><![CDATA[Renew snaps up electricity design specialist EDES]]></title><description><![CDATA[Renew Holdings has snapped-up high voltage design specialist Electricity Distribution Engineering Services for up to &pound;9m.<br />
EDES provides engineering design services for underground and overhead electricity lines in the energy distribution market.<br />
The deal will strengthen Renew&rsquo;s Excalon business as it targets growing work in the power transmission and distribution market.Renew said around &pound;50bn-&pound;60bn of investment is committed across the electricity network over the RIIO-2]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/renew-snaps-up-electricity-design-specialist-edes/</link><pubDate>Tue, 19 May 2026 09:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/renew-snaps-up-electricity-design-specialist-edes/</guid></item><item><title><![CDATA[Forterra plans brick and block price hikes]]></title><description><![CDATA[Forterra is looking to implement &ldquo;pricing surcharges&rdquo; on concrete products and bricks from next month.<br />
The materials giant said it has also been slowing down production with a shift to more output in the second half of the year.<br />
In a trading update today the firm said: &ldquo;The ongoing crisis in the Middle East has created further challenges for our business, with additional cost inflation driven by significant increases in the cost of diesel, transport services and natural gas. Th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/forterra-plans-brick-and-block-price-hikes/</link><pubDate>Tue, 19 May 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/forterra-plans-brick-and-block-price-hikes/</guid></item><item><title><![CDATA[Over 90 jobs axed as Falkirk steelwork firms collapse]]></title><description><![CDATA[Over 90 jobs have been axed after two connected Scottish steelwork firms collapsed into administration just days after workers staged a protest over unpaid wages.<br />
Falkirk-based sister companies AIM Engineering &amp; Fabrication Group and Hescott Engineering Company have called in administrators from Interpath Advisory after losing a major customer.<br />
The collapse with the loss of 93 jobs comes a week after Hescott workers were told to stay at home, bringing site activity to a halt.Up to 40 staff g]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/over-90-jobs-axed-as-falkirk-steelwork-firms-collapse/</link><pubDate>Tue, 19 May 2026 08:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/over-90-jobs-axed-as-falkirk-steelwork-firms-collapse/</guid></item><item><title><![CDATA[Keady Construction lands £150m Stockport resi scheme]]></title><description><![CDATA[Developer Amstone has appointed Keady Construction as main contractor to build its &pound;150m No.1 Knightsbridge residential scheme in Stockport.<br />
Construction will start on site in the first quarter of 2027 to deliver 588 apartments in phases over the following 2.5 years.<br />
Three residential blocks will be built with heights of five to 15 storeys.Keady is part of the wider OHOB Group.<br />
Adnan Siddiqi, Director at Amstone Ventures said; &ldquo;We were attracted to Keady Construction due to their sig]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keady-construction-lands-150m-stockport-resi-scheme/</link><pubDate>Tue, 19 May 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keady-construction-lands-150m-stockport-resi-scheme/</guid></item><item><title><![CDATA[Sixteen win £1bn Southern Gas Networks deal]]></title><description><![CDATA[Southern Gas Networks has confirmed the line-up of 16 specialist utility contractors it will use to deliver a &pound;1bn gas mains replacement framework across southern England.<br />
Contractors Clancy Docwra and Network Delivery Associates achieved a clean sweep across all four sub-regions on the southern gas mains replacement framework.<br />
Across all four regions, SGN is targeting more than 566km of annual mains replacement work.I&amp;G Contractors also emerged as another big beneficiary after landing]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sixteen-win-1bn-southern-gas-networks-deal/</link><pubDate>Tue, 19 May 2026 08:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sixteen-win-1bn-southern-gas-networks-deal/</guid></item><item><title><![CDATA[Kier submits plan for £60m Ellesmere Port school rebuild]]></title><description><![CDATA[Kier has lodged plans to demolish and replace a major RAAC-hit secondary school in Ellesmere Port.<br />
The contractor will design and build a new home for Ellesmere Port Catholic High School after unsafe reinforced autoclaved aerated concrete was found across large parts of the existing campus.<br />
Plans submitted to Cheshire West and Chester Council will see all existing school buildings demolished once the replacement facilities are open.The project is being brought forward for the Our Lady Help of Ch]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-submits-plan-for-60m-ellesmere-port-school-rebuild/</link><pubDate>Tue, 19 May 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-submits-plan-for-60m-ellesmere-port-school-rebuild/</guid></item><item><title><![CDATA[Mace Construct chief executive to step down]]></title><description><![CDATA[Mace chief executive Jason Millett is to step down at the end of the year as the contractor beds-in its new standalone contractor business.<br />
Millett, aged 61, will leave his role as Group CEO of Mace Group and Mace Construct but will continue to sit on the board of newly-independent Mace Consult as a non executive director while also exploring fresh opportunities.His departure follows the completion of Mace&rsquo;s demerger of its Consult business, leaving Mace Construct to push ahead as a simple]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-construct-chief-executive-to-step-down/</link><pubDate>Tue, 19 May 2026 08:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-construct-chief-executive-to-step-down/</guid></item><item><title><![CDATA[Statom Holdings posts increased turnover and profits]]></title><description><![CDATA[Results for the wider Statom business have been shared with the Enquirer highlighting a landmark year of growth at the specialist engineering and construction contractor.<br />
Numbers set to be posted at Companies House for Statom Holdings Limited for the year to November 30 2025 show turnover up more than 40% to &pound;252.8m from &pound;180m last time as pre-tax profits edged-up to &pound;10.8m from &pound;10.3m.<br />
The group also enters FY2026 with a strong secured order book of &pound;670m across mu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/statom-holdings-posts-increased-turnover-and-profits/</link><pubDate>Mon, 18 May 2026 17:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/statom-holdings-posts-increased-turnover-and-profits/</guid></item><item><title><![CDATA[Dalkia lands M&amp;E deal at &pound;300m Children&rsquo;s Cancer Centre]]></title><description><![CDATA[Dalkia has landed the MEP package on Sisk&rsquo;s &pound;300m Children&rsquo;s Cancer Centre at Great Ormond Street Hospital in central London.<br />
The Sisk/BDP design, which Dalkia will deliver, incorporates air source heat pumps as a central element of the hospital&rsquo;s decarbonisation strategy, reducing reliance on fossil fuels and improving long-term energy performance.<br />
As the new centre is being built within the hospital&rsquo;s existing footprint, the construction methodology and MEP progra]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dalkia-lands-mampe-deal-at-pound300m-childrenrsquos-cancer-centre/</link><pubDate>Mon, 18 May 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dalkia-lands-mampe-deal-at-pound300m-childrenrsquos-cancer-centre/</guid></item><item><title><![CDATA[Morrisroe order book jumps 40% after Villa Park and Battersea wins]]></title><description><![CDATA[Specialist contractor Morrisroe has grown its forward order book by 41% after landing major jobs at Villa Park and Battersea Power Station.<br />
The concrete frame, piling, demolition and joinery specialist said orders stood at &pound;340m in January 2026, up from &pound;241m a year earlier.<br />
The haul includes the design and build of Aston Villa&rsquo;s new North Stand at Villa Park and a major piling, basement and superstructure package for Sisk on phase 3C of the Battersea Power Station redevelopmen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morrisroe-order-book-jumps-40-after-villa-park-and-battersea-wins/</link><pubDate>Mon, 18 May 2026 08:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morrisroe-order-book-jumps-40-after-villa-park-and-battersea-wins/</guid></item><item><title><![CDATA[Trial date set after passer-by killed by falling window pane]]></title><description><![CDATA[Four firms involved in the development of a luxury residential tower will stand trial after a passer-by was killed by a window pane which fell 25 floors from the penthouse.<br />
Mick Ferris, 53, was hit by the glass on central London&rsquo;s Albert Embankment on the morning of 2 October 2018.<br />
The window fell from the penthouse of The Corniche scheme. Coach driver Ferris, who worked for Clarkes Of London, had parked opposite the building.The BBC reported that four firms appeared at Inner London Crown]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/trial-date-set-after-passer-by-killed-by-falling-window-pane/</link><pubDate>Mon, 18 May 2026 08:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/trial-date-set-after-passer-by-killed-by-falling-window-pane/</guid></item><item><title><![CDATA[Norwich’s first build-to-rent scheme approved]]></title><description><![CDATA[Property investor Zive Capital has secured planning approval for the &pound;80m Victoria Gardens scheme&nbsp; in the heart of Norwich<br />
The Queens Road brownfield site was previously home to the former Marsh office block, which was demolished in 2024 after lying empty since the pandemic.<br />
The Broadway Malyan-designed scheme will deliver 432 rented homes across five main buildings, stepping down towards a run of townhouses at the southern end of the site.Plans also include 500 sq m of flexible comme]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/norwichs-first-build-to-rent-scheme-approved/</link><pubDate>Mon, 18 May 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/norwichs-first-build-to-rent-scheme-approved/</guid></item><item><title><![CDATA[London office fit-out second most pricey in the world]]></title><description><![CDATA[The flight to better-quality offices has made London the world&rsquo;s second-most expensive office fit-out market, as occupiers fight for scarce top-grade workspace.<br />
Consultant Turner &amp; Townsend&rsquo;s latest global fit-out report ranks London behind only New York, despite costs in the capital easing 1% over the last year.<br />
High-specification fit-out costs in London now stand at $5,872 (&pound;4,397) per sq m, just behind New York at $5,886 (&pound;4,407) per sq m.The consultant said demand]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-office-fit-out-second-most-pricey-in-the-world/</link><pubDate>Fri, 15 May 2026 15:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-office-fit-out-second-most-pricey-in-the-world/</guid></item><item><title><![CDATA[Statom builds £617m order book after board strengthened]]></title><description><![CDATA[Statom Group has pushed turnover to a new high and built a record &pound;617m order book after reshaping the business into a broader capability specialist engineering contractor.<br />
The Essex-based group, founded as a concrete contractor in 2020, lifted revenue 15% to &pound;184m in the year to 30 November 2025 as growth in infrastructure, civil engineering and specialist foundations offset a slower residential market.<br />
But pre-tax profit dipped to &pound;6.8m from &pound;8.7m last time as the firm]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/statom-builds-617m-order-book-after-board-strengthened/</link><pubDate>Fri, 15 May 2026 14:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/statom-builds-617m-order-book-after-board-strengthened/</guid></item><item><title><![CDATA[Speller Metcalfe replaces Curo on £18m leisure job]]></title><description><![CDATA[Fenland District Council has parachuted Speller Metcalfe in to replace Curo Construction, which has ceased trading, to keep the &pound;18m Manor Leisure Centre redevelopment on track.<br />
The council said project delivery partner Alliance Leisure acted quickly to replace Curo after the London-based firm collapsed earlier this week.<br />
All pre-contract work with Curo has now been cancelled and Speller Metcalfe will take the Whittlesey scheme forward.<br />
The council said an immediate review was carried out]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/speller-metcalfe-replaces-curo-on-18m-leisure-job/</link><pubDate>Fri, 15 May 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/speller-metcalfe-replaces-curo-on-18m-leisure-job/</guid></item><item><title><![CDATA[Bachy and Kilnbridge team up for ground-to-frame offer]]></title><description><![CDATA[Foundations specialist Bachy Soletanche has teamed up with concrete contractor Kilnbridge to launch a new specialist venture targetting complex city construction jobs.<br />
UrbanCore will offer clients a single integrated package covering demolition, dismantling, material reuse, foundations, basements, reinforced concrete and steel frames.<br />
The two firms said the new venture has been set up to cut risk on tight city schemes where the split between groundworks, substructure and structural packages can]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bachy-and-kilnbridge-team-up-for-ground-to-frame-offer/</link><pubDate>Fri, 15 May 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bachy-and-kilnbridge-team-up-for-ground-to-frame-offer/</guid></item><item><title><![CDATA[Developers called up for £10bn Old Oak mega-scheme]]></title><description><![CDATA[London&rsquo;s biggest brownfield regeneration scheme is being readied for take-off after public bodies struck a landmark land deal around HS2&rsquo;s Old Oak Common station<br />
The Old Oak and Park Royal Development Corporation has agreed heads of terms with government, the Department for Transport and Network Rail to pull 70 acres at Old Oak into a single public sector development site.<br />
The move gives the developer market a clear run at one of the UK&rsquo;s largest regeneration plays, with plans]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/developers-called-up-for-10bn-old-oak-mega-scheme/</link><pubDate>Fri, 15 May 2026 08:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/developers-called-up-for-10bn-old-oak-mega-scheme/</guid></item><item><title><![CDATA[Lovell signs off £1bn Birmingham estate regen deal]]></title><description><![CDATA[Partnership housing specialist Lovell has signed a formal agreement with Birmingham City Council to lead the &pound;1bn regeneration of the Druid&rsquo;s Heath estate.<br />
The deal clears the way for one of the city&rsquo;s biggest estate renewal programmes, with around 3,500 homes planned over the next 20 years.<br />
Just over half of the homes will be affordable, with 1,785 planned in total and 400 built for social rent.<br />
The council said the partnership agreement gives a legal guarantee that 51% of hom]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lovell-signs-off-1bn-birmingham-estate-regen-deal/</link><pubDate>Thu, 14 May 2026 16:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lovell-signs-off-1bn-birmingham-estate-regen-deal/</guid></item><item><title><![CDATA[Road worker loses leg in milling machine]]></title><description><![CDATA[A road planing contractor has been fined &pound;92,450 after a worker&rsquo;s leg became entangled in a milling machine and had to be amputated.<br />
On 14 February 2024, the 32-year-old employee, working for Power Plane Limited, was operating a road milling machine at Wade Road in Basingstoke.<br />
The operator&rsquo;s foot became caught by the rotating milling drum, dragging him into the machine.His right leg had to be amputated by emergency services at the scene to free him from the machine. The life-c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/road-worker-loses-leg-in-milling-machine/</link><pubDate>Thu, 14 May 2026 13:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/road-worker-loses-leg-in-milling-machine/</guid></item><item><title><![CDATA[Legendre to start £70m Mayfair office revamp]]></title><description><![CDATA[Legendre UK has been confirmed by Berkeley Estate Asset Management (BEAM) as main contractor for a &pound;70m office redevelopment in Mayfair.<br />
Main construction work will start on site next month at 50 Stratton Street with completion expected in mid-2028.<br />
Designed by architects Stiff + Trevillion, the 135,000 sq ft cheme will include generous 12,000 sq ft floor plates, high-end finishes and a range of communal and private terraces.The all-electric building will be delivered with a zero embodied]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/legendre-to-start-70m-mayfair-office-revamp/</link><pubDate>Thu, 14 May 2026 11:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/legendre-to-start-70m-mayfair-office-revamp/</guid></item><item><title><![CDATA[Landsec flags more delays on major housing starts]]></title><description><![CDATA[Landsec is continuing to push back potential start dates for four huge residential schemes capable of delivering 9,000 homes.<br />
In its last trading statement the developer first starts in 2027 on major projects at Mayfield in Manchester, Lewisham in south-east London, Finchley Road in north London and MediaCity in Salford were not expected until 2027.<br />
That has now been pushed back further until not before &ldquo;late 2027.&rdquo; as the developer looks to an easing in affordable housing requiremen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/landsec-flags-more-delays-on-major-housing-starts/</link><pubDate>Thu, 14 May 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/landsec-flags-more-delays-on-major-housing-starts/</guid></item><item><title><![CDATA[Ageing M53 bridges first in line for £1bn motorway structures repair]]></title><description><![CDATA[National Highways will start the first bridge renewal package next week from the Government&rsquo;s new &pound;1bn Structures Fund with a &pound;50m upgrade of the ageing M53 in the North West.<br />
The new fund was unveiled in the Department for Transport&rsquo;s Road Investment Strategy 3 to fix England&rsquo;s bridges, flyovers and tunnels.<br />
The M53 upgrade package in Merseyside and Cheshire is the first major bridge replacement programme to advance with the new funding.<br />
Work starts with a &pound;3]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ageing-m53-bridges-first-in-line-for-1bn-motorway-structures-repair/</link><pubDate>Thu, 14 May 2026 08:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ageing-m53-bridges-first-in-line-for-1bn-motorway-structures-repair/</guid></item><item><title><![CDATA[Falkirk steelwork firm workers protest after wages fail to land]]></title><description><![CDATA[Workers at Falkirk steelwork contractor Hescott Engineering staged a protest yesterday over unpaid wages after being told to halt work a week ago.<br />
Up to 40 staff gathered at the company&rsquo;s works after managers told them last week to stay at home, bringing site activity to a halt.<br />
One worker told the Enquirer: &ldquo;We were told to go home last Wednesday (6th) and nobody has been paid. We&rsquo;ve been completely left in the dark about what is happening.&ldquo;We heard nothing more since an]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/falkirk-steelwork-firm-workers-protest-after-wages-fail-to-land/</link><pubDate>Thu, 14 May 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/falkirk-steelwork-firm-workers-protest-after-wages-fail-to-land/</guid></item><item><title><![CDATA[Plans in for £100m Buxton town centre reboot]]></title><description><![CDATA[Developer Capital&amp;Centric has lodged final plans for a &pound;100m-plus town centre reboot of The Springs shopping centre in Buxton.<br />
The social-impact developer is working with High Peak Borough Council to turn the site into a new residential-led neighbourhood with 332 homes for rent.<br />
The scheme will also deliver space for bars, shops and caf&eacute;s, alongside new public squares, riverside spaces and a better pedestrian route from Buxton railway station into the town centre.Capital&amp;Cen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-100m-buxton-town-centre-reboot/</link><pubDate>Thu, 14 May 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-100m-buxton-town-centre-reboot/</guid></item><item><title><![CDATA[Costain on track for 4% margin as workload builds]]></title><description><![CDATA[Costain is on course to hit its 4% operating margin target this year as the contractor prepares for a bigger step-up in performance from 2027.<br />
The infrastructure specialist said trading since the start of January remained in line with board expectations, with revenue and adjusted operating profit both expected to rise this year.<br />
In an AGM trading update, Costain said work volumes would build through the second half of 2026 as major customers accelerate investment programmes across water, transpo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-on-track-for-4-margin-as-workload-builds/</link><pubDate>Thu, 14 May 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-on-track-for-4-margin-as-workload-builds/</guid></item><item><title><![CDATA[King’s speech building safety bill puts manufacturers in firing line]]></title><description><![CDATA[The King&rsquo;s Speech has set out a raft of new Bills to facilitate the construction of infrastructure, new social housing and speed up payments in the supply chain.<br />
Among the key changes in the legislative agenda for the year ahead is the Remediation Bill which seeks to remove technical legal barriers that will allow developers and contractors to pursue construction product manufacturers to pay their share of fixing cladding and building safety shortcomings.<br />
New laws on supply chain payment w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kings-speech-building-safety-bill-puts-manufacturers-in-firing-line/</link><pubDate>Wed, 13 May 2026 16:23:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kings-speech-building-safety-bill-puts-manufacturers-in-firing-line/</guid></item><item><title><![CDATA[Ex-Skanska VP joins M Group as energy infrastructure chief]]></title><description><![CDATA[M Group has hired former Skanska chief operating officer Andrew English to lead its growing energy infrastructure business.<br />
English joins as managing director &ndash; energy infrastructure as M Group ramps up investment in one of its key growth markets.<br />
He will spearhead the group&rsquo;s whole-life energy infrastructure offer, targeting complex engineering and utilities work as clients upgrade critical assets and push towards net zero.<br />
M Group said the division will play a central role in moder]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ex-skanska-vp-joins-m-group-as-energy-infrastructure-chief/</link><pubDate>Wed, 13 May 2026 14:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ex-skanska-vp-joins-m-group-as-energy-infrastructure-chief/</guid></item><item><title><![CDATA[Vistry warns first-half profits to be hit by discount drive]]></title><description><![CDATA[Vistry has warned first-half profits will fall sharply below last year after heavier discounting on private homes and rising cost pressure from the Middle East conflict hit margins.<br />
The partnership homes giant said it had stepped up incentives to clear completed and near-completed open market homes as part of a major cash drive.<br />
In an AGM statement today new chief executive Adam Daniels said he was also carrying out an operational review of the business, with findings due no later than the inter]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-warns-first-half-profits-to-be-hit-by-discount-drive/</link><pubDate>Wed, 13 May 2026 08:47:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-warns-first-half-profits-to-be-hit-by-discount-drive/</guid></item><item><title><![CDATA[Glencar revealed as builder of £50m Minecraft World]]></title><description><![CDATA[Glencar has confirmed its role as main contractor on the new &pound;50m Minecraft World at Chessington World of Adventures.<br />
Theme Park owner&nbsp;Merlin Entertainment said its latest attraction based on the video game is set to open in 2027.<br />
Glencar has now gone public with its role after initial works started on site last month and the first steelwork for the main roller coaster has arrived.The contractor said: &ldquo;The scheme will bring one of the world&rsquo;s most recognisable gaming brand]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/glencar-revealed-as-builder-of-50m-minecraft-world/</link><pubDate>Wed, 13 May 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/glencar-revealed-as-builder-of-50m-minecraft-world/</guid></item><item><title><![CDATA[Strabag UK gears up for civils work surge next year]]></title><description><![CDATA[Strabag UK is gearing up for a major civils surge next year as three big tunnelling-led jobs move into full construction.<br />
The contractor said its UK workload is set to accelerate after revenue across Strabag&rsquo;s UK operations slipped from &pound;700m to &pound;600m in 2025 after work was deferred on HS2 and Anglo American&rsquo;s Woodsmith mine project.<br />
Strabag UK managing director Andrew Dixon said momentum was now building for 2027 and beyond, with major infrastructure, energy and tunnelli]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/strabag-uk-gears-up-for-civils-work-surge-next-year/</link><pubDate>Wed, 13 May 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/strabag-uk-gears-up-for-civils-work-surge-next-year/</guid></item><item><title><![CDATA[TfL names trio for £700m station upgrade framework]]></title><description><![CDATA[Transport for London has picked Amey Rail, Costain and Dragados for a &pound;700m infrastructure improvement framework covering a pipeline of station, tram and step-free access upgrades.<br />
The three firms beat Morgan Sindall, Taylor Woodrow and Octavius to places on the deal.<br />
The framework will be used to deliver multi-disciplinary infrastructure and construction projects across the capital, taking schemes from early contractor involvement through design, construction and completion.TfL said the w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tfl-names-trio-for-700m-station-upgrade-framework/</link><pubDate>Wed, 13 May 2026 08:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tfl-names-trio-for-700m-station-upgrade-framework/</guid></item><item><title><![CDATA[Fusion21 starts race for £350m housing repairs framework]]></title><description><![CDATA[Fusion21 has opened bidding for spots on its third-generation &pound;350m responsive repairs and voids framework.<br />
The four-year national deal will support social landlords with day-to-day repairs, void property works, security, clearance, pest control, disrepair works and contact centre services.<br />
It is due to launch in October 2026 and will be used to call off work through competitive or direct selection.<br />
Lotting structure<br />
Lot<br />
Workstream<br />
1<br />
Responsive repairs and maintenance<br />
2<br />
Void property impro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fusion21-starts-race-for-350m-housing-repairs-framework/</link><pubDate>Tue, 12 May 2026 19:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fusion21-starts-race-for-350m-housing-repairs-framework/</guid></item><item><title><![CDATA[Scaffolding firm saved by Yorkshire Maintenance Co]]></title><description><![CDATA[The Yorkshire Maintenance Co has stepped-in to save Hull based Stratus Scaffolding Ltd and its 22 employees.<br />
Stratus had suffered a very difficult trading period caused by a combination of cash flow pressures, delayed client payments, increasing supplier demands, and limited support from the banks.<br />
The business had reached a critical point and was at real risk of closure before Yorkshire Maintenance made its move.<br />
The fit-out specialist acquired control from several shareholders securing the fut]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scaffolding-firm-saved-by-yorkshire-maintenance-co/</link><pubDate>Tue, 12 May 2026 17:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scaffolding-firm-saved-by-yorkshire-maintenance-co/</guid></item><item><title><![CDATA[Quinn London sold to staff]]></title><description><![CDATA[Quinn London has become the latest contractor to transition to an Employee Ownership Trust (EOT).<br />
The firm was founded in 2000 and has grown to a turnover of &pound;109m making a pre-tax profit of &pound;4m for the year to 31 May 2025.<br />
Founder Semus Quinn said: &ldquo;The move to an Employee Ownership Trust represents an exciting new chapter for Quinn London.&ldquo;Our people have always been central to our success, and this transition ensures they have a direct stake in the future of the busine]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/quinn-london-sold-to-staff/</link><pubDate>Tue, 12 May 2026 16:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/quinn-london-sold-to-staff/</guid></item><item><title><![CDATA[More fines and bans for former Carillion chiefs]]></title><description><![CDATA[Two former Carillion finance directors and three company accountants have been fined and banned by the accounting industry watchdog.<br />
The Financial Reporting Council&rsquo;s latest ruling saw former Group Finance Director Richard Adam, and his successor in that role Zafar Khan fined &pound;222,019 and &pound;60,228 respectively alongside exclusion from the Institute of Chartered Accountants in England and Wales for 15 and 10 years.<br />
The fines follow heavy penalties for the pair imposed by the Fina]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/more-fines-and-bans-for-former-carillion-chiefs/</link><pubDate>Tue, 12 May 2026 16:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/more-fines-and-bans-for-former-carillion-chiefs/</guid></item><item><title><![CDATA[ProcurePro raises millions to deliver AI upgrades]]></title><description><![CDATA[Construction procurement platform ProcurePro has secured US$11 million in a funding round led by QIC Ventures &ndash; one of Australia&rsquo;s largest sovereign wealth funds and a major infrastructure asset owner.<br />
Existing venture investors Airtree and Glitch Capital participated, together with global construction giants Bouygues via its VC fund managed by ISAI.<br />
The funding will be used to accelerate ProcurePro&rsquo;s construction-focused AI product suite, whilst supporting expansion across the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/procurepro-raises-millions-to-deliver-ai-upgrades/</link><pubDate>Tue, 12 May 2026 13:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/procurepro-raises-millions-to-deliver-ai-upgrades/</guid></item><item><title><![CDATA[Vistry gets £600m Olympic Park homes go-ahead]]></title><description><![CDATA[Vistry has got the green light for the first phase of its &pound;600m Pudding Mill Lane neighbourhood next to the Queen Elizabeth Olympic Park.<br />
Newham Council has approved the opening 355-home phase of the Stratford scheme being delivered by partnership homes specialist Vistry and the London Legacy Development Corporation.<br />
The full development next to Pudding Mill Lane DLR station will deliver 948 mixed-tenure homes across four phases, with a minimum of 45% affordable housing.The first phase wil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-gets-600m-olympic-park-homes-go-ahead/</link><pubDate>Tue, 12 May 2026 12:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-gets-600m-olympic-park-homes-go-ahead/</guid></item><item><title><![CDATA[London builder Curo Construction ceases trading]]></title><description><![CDATA[London building and fitout contractor Curo Construction has ceased trading with more than 100 staff told the business had &ldquo;exhausted all options&rdquo; to stay afloat.<br />
Employees at both Curo Construction and Curo Interiors were issued letters on Friday confirming the firms had ceased trading with immediate effect.<br />
In a message sent to staff, directors Darren Pettitt and Steve Conlin said: &ldquo;We exhausted all options but have been unable to secure a solution that allows the business to]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-builder-curo-construction-ceases-trading/</link><pubDate>Tue, 12 May 2026 09:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-builder-curo-construction-ceases-trading/</guid></item><item><title><![CDATA[Kier and Multiplex line up for Derwent London office starts]]></title><description><![CDATA[Derwent London is preparing to fire the starting gun on two major central London office schemes after reporting a strong rebound in leasing activity and rental growth.<br />
The developer has already started demolition at Holden House on Oxford Street, a 133,500 sq ft retained fa&ccedil;ade redevelopment opposite the Dean Street Elizabeth line station.<br />
Kier has been appointed under a pre-construction services agreement for the main construction works, with practical completion targeted for the second]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-and-multiplex-line-up-for-derwent-london-office-starts/</link><pubDate>Tue, 12 May 2026 08:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-and-multiplex-line-up-for-derwent-london-office-starts/</guid></item><item><title><![CDATA[McLaren lands £99m London Bond Street over-station job]]></title><description><![CDATA[McLaren Construction has been picked by British Land for a &pound;99m redevelopment above West One Shopping Centre and Bond Street Underground Station in London.<br />
The job at 75 Davies Street will deliver 94,000 sq ft of offices over seven floors while shops and the busy Tube station remain open below.<br />
Designed by AHMM, the scheme will almost double the existing office space by adding three extra floors.The late 1970s building will be partly stripped back and rebuilt, with around 60% of the existi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-lands-99m-london-bond-street-over-station-job/</link><pubDate>Tue, 12 May 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-lands-99m-london-bond-street-over-station-job/</guid></item><item><title><![CDATA[£26bn Pagabo developer framework goes live for bidders]]></title><description><![CDATA[Pagabo has kicked-off bidding for places on its next-generation &pound;26bn developer-led framework covering major public sector regeneration and development schemes.<br />
The procurement specialist has teamed up again with Yorkshire Purchasing Organisation to launch the four-year framework, set to go live from October 2026.<br />
It marks the third framework renewal to hit the market since Pagabo and YPO forged their long-term strategic delivery partnership last month to reshape construction procurement r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/26bn-pagabo-developer-framework-goes-live-for-bidders/</link><pubDate>Tue, 12 May 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/26bn-pagabo-developer-framework-goes-live-for-bidders/</guid></item><item><title><![CDATA[Cardo gains place on L&amp;Q&rsquo;s &pound;3bn home upgrade programme]]></title><description><![CDATA[Cardo has joined the established delivery contractor team on L&amp;Q&rsquo;s &pound;3bn Major Works Investment Programme.<br />
The property services specialist will support the 15-year programme over the next 12 years, starting with fire remediation projects in 2026/27.<br />
It joins existing delivery partners Amber Construction Services, Axis Europe, Durkan Regen, Equans UK &amp; Ireland, Foster Property Maintenance, Kier Places, Morgan Sindall Property Services, United Infrastructure and Wates Property]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cardo-gains-place-on-lampqrsquos-pound3bn-home-upgrade-programme/</link><pubDate>Mon, 11 May 2026 14:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cardo-gains-place-on-lampqrsquos-pound3bn-home-upgrade-programme/</guid></item><item><title><![CDATA[Fox snaps up highways contractor and readymix firm]]></title><description><![CDATA[Construction materials distribution and civils specialist Fox Group has snapped up surfacing contractor DSD Construction and concrete supplier Moore Readymix as it accelerates plans to build a vertically integrated circular economy business.<br />
The acquisitive Blackpool-based group, backed by investor Stellex Capital Management, said the deals would strengthen its ability to control more of the construction supply chain from materials production through to on-site delivery and recycling.<br />
Carlisle-b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fox-snaps-up-highways-contractor-and-readymix-firm/</link><pubDate>Mon, 11 May 2026 14:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fox-snaps-up-highways-contractor-and-readymix-firm/</guid></item><item><title><![CDATA[Starmer confirms plan to nationalise British Steel]]></title><description><![CDATA[Sir Keir Starmer will unveil legislation in Wednesday&rsquo;s King&rsquo;s Speech giving ministers powers to bring British Steel back into public ownership for the first time since 1988.<br />
The move follows the collapse of talks to secure a commercial sale of the Scunthorpe steelmaker from Chinese owner Jingye.<br />
Under the proposed legislation, the Government would gain powers to nationalise British Steel if a public interest test is met, with ministers arguing the move is needed to protect national]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/starmer-confirms-plan-to-nationalise-british-steel/</link><pubDate>Mon, 11 May 2026 13:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/starmer-confirms-plan-to-nationalise-british-steel/</guid></item><item><title><![CDATA[Panattoni plans 23-acre scheme in Wakefield]]></title><description><![CDATA[Developer Panattoni has acquired a 23-acre site at Wakefield Europort, West Yorkshire, from Delin Property where it will deliver a 500,000 sq ft speculative cross-docked logistics and warehousing scheme.<br />
Construction is scheduled to start this quarter on Panattoni Wakefield 500 which will feature 56 dock doors, 8 level access doors, &nbsp;yard depths of up to 50 metres, 62 HGV spaces and 384 car parking spaces.<br />
Andrew Preston, Senior Development Director at Panattoni, said: &ldquo;Wakefield Euro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/panattoni-plans-23-acre-scheme-in-wakefield/</link><pubDate>Mon, 11 May 2026 09:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/panattoni-plans-23-acre-scheme-in-wakefield/</guid></item><item><title><![CDATA[Ardmore loses High Court appeal bid to halt £14.9m Crest payout]]></title><description><![CDATA[Ardmore group-related companies have failed in a last-ditch bid to stop Crest Nicholson enforcing a &pound;14.9m building safety payout after the High Court refused permission to appeal and rejected pleas for more time to pay.<br />
In a fresh blow for the contractor group, Mr Justice Constable also refused an application for more time to pay, ruling the companies must satisfy the adjudication award within 14 days.<br />
The Technology and Construction Court found there was no real prospect of overturning l]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-loses-high-court-appeal-bid-to-halt-149m-crest-payout/</link><pubDate>Mon, 11 May 2026 09:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-loses-high-court-appeal-bid-to-halt-149m-crest-payout/</guid></item><item><title><![CDATA[Kori lands latest deal for Care UK]]></title><description><![CDATA[Kori Construction has been appointed by Care UK to deliver a new 64-bed care home in Mitcham.<br />
Demolition of the existing building will start this week marking the fourth scheme delivered in partnership between the two organisations.<br />
The new &pound;12m three-storey development has been carefully designed to provide high-quality specialist accommodation for older people requiring residential, nursing and dementia care.Jordan Connachie, Managing Director of Kori Construction, said: &ldquo;We are de]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kori-lands-latest-deal-for-care-uk/</link><pubDate>Mon, 11 May 2026 09:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kori-lands-latest-deal-for-care-uk/</guid></item><item><title><![CDATA[Keltbray scales down as revenue drops]]></title><description><![CDATA[Keltbray Built Environment has spent &pound;1m on redundancies as the business reacts to a fall in the London commercial market.<br />
The numbers were confirmed in a results update ahead of Companies House filing for the year ended October 2025 showing an underlying pre&#8209;tax profit of &pound;5.3m compared to &pound;3.2m last time.<br />
Looking forward the firm said:&rdquo;Keltbray expects 2026 to be a transitional year. Performance in the first half of the year is in line with budget expectations, re]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keltbray-scales-down-as-revenue-drops/</link><pubDate>Mon, 11 May 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keltbray-scales-down-as-revenue-drops/</guid></item><item><title><![CDATA[East London council £500m housing major works drive]]></title><description><![CDATA[The London Borough of Tower Hamlets has put contractors on alert for a &pound;500m major works programme covering housing upgrades, fire safety and refurbishment across its estate over the next decade.<br />
The east London borough plans to split the work into eight major contracts supporting delivery of its long-term capital investment programme, with procurement expected to launch formally this summer.<br />
The council said the programme would cover a broad mix of refurbishment and compliance work includ]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/east-london-council-500m-housing-major-works-drive/</link><pubDate>Mon, 11 May 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/east-london-council-500m-housing-major-works-drive/</guid></item><item><title><![CDATA[Taylor Woodrow scoops £856m HS2 control centre mega job]]></title><description><![CDATA[Taylor Woodrow has scooped an &pound;856m contract to build HS2&rsquo;s flagship train depot and control centre in Birmingham.<br />
The contractor will deliver the massive Washwood Heath complex in joint venture with Aureos Rail on the 70-hectare former LDV van makerand Metro-Cammell industrial site.<br />
The deal covers construction of HS2&rsquo;s rolling stock maintenance depot alongside the network integrated control centre that will oversee train dispatch, driver communications and day-to-day railway]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/taylor-woodrow-scoops-856m-hs2-control-centre-mega-job/</link><pubDate>Mon, 11 May 2026 01:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/taylor-woodrow-scoops-856m-hs2-control-centre-mega-job/</guid></item><item><title><![CDATA[Go-ahead for 1m sq ft Northumberland industrial park]]></title><description><![CDATA[The UK logistics parks pipeline is starting to swell again after planners backed a giant Northumberland industrial scheme earmarked to deliver more than 1m sq ft of employment space.<br />
Northumberland planners unanimously approved Arlington Real Estate&rsquo;s outline plan for the 126-acre West Hartford Park development at Cramlington, which is being brought forward with Homes England.<br />
The approval adds fresh momentum to the recovering big-box market as developers revive major industrial and distri]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-1m-sq-ft-northumberland-industrial-park/</link><pubDate>Fri, 08 May 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-1m-sq-ft-northumberland-industrial-park/</guid></item><item><title><![CDATA[1m sq ft Northumberland industrial park approved]]></title><description><![CDATA[The UK logistics parks pipeline is starting to swell again after planners backed a giant Northumberland industrial scheme earmarked to deliver more than 1m sq ft of employment space.<br />
Northumberland planners unanimously approved Arlington Real Estate&rsquo;s outline plan for the 126-acre West Hartford Park development at Cramlington, which is being brought forward with Homes England.<br />
The approval adds fresh momentum to the recovering big-box market as developers revive major industrial and distri]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/1m-sq-ft-northumberland-industrial-park-approved/</link><pubDate>Fri, 08 May 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/1m-sq-ft-northumberland-industrial-park-approved/</guid></item><item><title><![CDATA[Henry Boot chief prepares exit after strategic overhaul]]></title><description><![CDATA[Henry Boot chief executive Tim Roberts is to step down later this year after six years leading the listed land, development and house building group.<br />
The company has named Edward Hutchinson, presently interim managing director of Boot&rsquo;s joint venture housing business Stonebridge Homes, as ceo designate.<br />
Hutchinson was formerly managing director of Henry Boot Developments, before taking the reins at Stonebridge last year following the departure of Steve Errington.<br />
(L-r) Chief executive Tim]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/henry-boot-chief-prepares-exit-after-strategic-overhaul/</link><pubDate>Fri, 08 May 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/henry-boot-chief-prepares-exit-after-strategic-overhaul/</guid></item><item><title><![CDATA[HS2 chief pushes major project reset back to end of 2026]]></title><description><![CDATA[HS2 chief Mark Wild has pushed back publication of his big project reset until the end of the year to explore whether billions can be saved by stripping out complexity from the railway.<br />
The reset had been expected to set a fresh budget and delivery timetable in March.<br />
But Transport Secretary Heidi Alexander intervened and ordered HS2 to test whether a simpler railway specification could cut costs and get services running sooner.<br />
Top of the hit list is HS2&rsquo;s original 360km/h design speed.Mi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hs2-chief-pushes-major-project-reset-back-to-end-of-2026/</link><pubDate>Fri, 08 May 2026 08:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hs2-chief-pushes-major-project-reset-back-to-end-of-2026/</guid></item><item><title><![CDATA[Briggs &amp; Forrester banks &pound;511m record pipeline after stronger year]]></title><description><![CDATA[Briggs &amp; Forrester has entered the new financial year sitting on a record &pound;511m order book as contractors turned to the M&amp;E specialist as a safe pair of hands on major projects.<br />
The Northampton-based building services contractor said the forward workload now represents around two years of future work.<br />
The pipeline is up 18% from &pound;435m last year and includes &pound;221m of secured orders plus a further &pound;290m of contracts in final negotiation.<br />
That covers 89% of next year]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/briggs-amp-forrester-banks-pound511m-record-pipeline-after-stronger-year/</link><pubDate>Fri, 08 May 2026 08:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/briggs-amp-forrester-banks-pound511m-record-pipeline-after-stronger-year/</guid></item><item><title><![CDATA[Winvic tops April contracts league after shed hub win]]></title><description><![CDATA[Winvic took pole position in April&rsquo;s contracts league led by a major &pound;200m logistics hub win in the East Midlands.<br />
The 33-hectare Enderby scheme close to Junction 21 of the M1 near Leicester will see 1,130,000 sq ft of warehouse and distribution space built with five warehouses.<br />
Willmott Dixon came a close second with half a dozen building jobs together worth around &pound;263m. The haul included a &pound;100m data centre win in the Tees Valley at Preston Farm Industrial Estate in St]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winvic-tops-april-contracts-league-after-shed-hub-win/</link><pubDate>Fri, 08 May 2026 00:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winvic-tops-april-contracts-league-after-shed-hub-win/</guid></item><item><title><![CDATA[FP McCann tests graphene roof tiles on site]]></title><description><![CDATA[FP McCann has successfully advanced its graphene-enhanced concrete roof tile project in the push towards lower carbon construction materials.<br />
Following a series of rigorous production trials at its Cadeby plant, the manufacturer has demonstrated that graphene-enhanced formulations can be seamlessly integrated into existing, high-volume manufacturing processes.<br />
The latest phase of the programme builds upon an initial run in January, during which FP McCann produced a batch of 2,500 graphene-enhanc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fp-mccann-tests-graphene-roof-tiles-on-site/</link><pubDate>Thu, 07 May 2026 13:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fp-mccann-tests-graphene-roof-tiles-on-site/</guid></item><item><title><![CDATA[Construction buyers report rampant cost inflation]]></title><description><![CDATA[Construction input cost inflation saw its steepest rise since January 2022 in the latest survey of industry buyers.<br />
The bellwether S&amp;P Global UK Construction Purchasing Managers&rsquo; Index highlighted another challenging month registering 39.7 in April, down from 45.6 in March and indicative of a sharp fall in overall business activity.<br />
Reduced output has been seen in each month since January 2025 and the latest reading was the weakest for five months.Fuel surcharges contributed to a rapid]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-buyers-report-rampant-cost-inflation/</link><pubDate>Thu, 07 May 2026 12:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-buyers-report-rampant-cost-inflation/</guid></item><item><title><![CDATA[Caddick taps B&amp;K veteran to spearhead East Midlands drive]]></title><description><![CDATA[Caddick Construction has poached a senior Bowmer + Kirkland boss to spearhead its expansion drive into the East Midlands.<br />
The contractor has appointed Paul Sykes as regional managing director for the East Midlands as it looks to build on the rapid growth of its Midlands operation, which already boasts a &pound;1bn pipeline and &pound;300m forward order book.<br />
Sykes joins after nearly 30 years at Bowmer + Kirkland, where he most recently led the contractor&rsquo;s North West business following his]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-taps-bampk-veteran-to-spearhead-east-midlands-drive/</link><pubDate>Thu, 07 May 2026 08:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-taps-bampk-veteran-to-spearhead-east-midlands-drive/</guid></item><item><title><![CDATA[Go-ahead for another giant data centre at Redhill]]></title><description><![CDATA[Planners have given the green light to a new 15MW data centre in Surey.<br />
It is the latest stage of expansion of the site which was acquired by real estate investor Castleforge in partnership with Galaxy Data Centers last year.<br />
The new owners are planning to invest another &pound;200m in the site bringing its gross project value to around &pound;500m.Situated on the existing 3.1-hectare industrial estate at Foxboro Business Park, the consented&nbsp;project&nbsp;comprises&nbsp;a single two-storey d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-another-giant-data-centre-at-redhill/</link><pubDate>Thu, 07 May 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-another-giant-data-centre-at-redhill/</guid></item><item><title><![CDATA[Port of Dover picks 14 firms for civils and marine works]]></title><description><![CDATA[Port of Dover has unveiled its new line-up of contractors to deliver a rolling programme of civils, marine and infrastructure projects as the UK&rsquo;s busiest ferry hub gears up for major long-term investment.<br />
The harbour authority has appointed 15 firms across two multi-year frameworks covering schemes ranging from utilities and berth upgrades to highways, structures and building works.<br />
The biggest winners were FM Conway, Jackson Civil Engineering, Mitie and UK Power Networks Services after s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/port-of-dover-picks-14-firms-for-civils-and-marine-works/</link><pubDate>Thu, 07 May 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/port-of-dover-picks-14-firms-for-civils-and-marine-works/</guid></item><item><title><![CDATA[HG targets £500m turnover after Gateway 2 approval surge]]></title><description><![CDATA[HG Construction is targeting almost &pound;500m turnover after a surge in Gateway 2 approvals helped the contractor ride out the Building Safety Act slowdown.<br />
The Hitchin-based contractor said workload and pipeline are now at record levels after investing heavily in compliance systems and pre-construction expertise ahead of the tougher higher-risk building regime.<br />
HG held turnover flat at &pound;387m in the year to December 2025 as developers across the sector battled Building Safety Regulator d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hg-targets-500m-turnover-after-gateway-2-approval-surge/</link><pubDate>Thu, 07 May 2026 08:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hg-targets-500m-turnover-after-gateway-2-approval-surge/</guid></item><item><title><![CDATA[Balfour Beatty powers ahead on energy and defence boom]]></title><description><![CDATA[Balfour Beatty is riding the power and defence spending boom to shield itself from wider market turmoil, with the contractor banking a string of major new orders across the UK and US.<br />
Ahead of today&rsquo;s AGM, the group said trading since January had remained in line with expectations and it continued to target high single-digit percentage growth in profit from operations this year.<br />
The contractor said demand across its key infrastructure markets remained strong, helping maintain a &ldquo;high]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-powers-ahead-on-energy-and-defence-boom/</link><pubDate>Thu, 07 May 2026 08:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-powers-ahead-on-energy-and-defence-boom/</guid></item><item><title><![CDATA[Reds10 brings steel fabrication in-house]]></title><description><![CDATA[Offsite contractor Reds10 Group is bringing&nbsp; steel fabrication in-house following a strategic investment in specialist ESL Fabrication Engineers (ESL).<br />
ESL specialises in the delivery of steel fabrication across the UK, from manufacture and installation to repair and maintenance works.<br />
The &pound;7m turnover business employs just under 50 people from its purpose-built factory facility in Kingston upon Hull.ESL has worked with Reds10 for the last five years to deliver high-quality sustainabl]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/reds10-brings-steel-fabrication-in-house/</link><pubDate>Wed, 06 May 2026 15:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/reds10-brings-steel-fabrication-in-house/</guid></item><item><title><![CDATA[Caddick looking for subcontractors across the North East]]></title><description><![CDATA[Caddick Civil Engineering is seeking subcontractors and those looking to be directly employed for projects across the North East.<br />
The firm is hosting a Meet the Buyer event in partnership with CHAS to highlight opportunities on its growing pipeline of contracts in the region.<br />
Taking place on 12th May from 8:00am to 12:00pm at Ramside Hall in Durham, the free event is designed to give direct access to decision-makers within Caddick Civil Engineering.Those attending will be able to:Meet Caddick Ci]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-looking-for-subcontractors-across-the-north-east/</link><pubDate>Wed, 06 May 2026 11:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-looking-for-subcontractors-across-the-north-east/</guid></item><item><title><![CDATA[Gridlock eases as 12,000 Gateway 2 flats approved in 12-weeks]]></title><description><![CDATA[More than 12,000 housing units have cleared Gateway 2 approval in the latest 12-week push by the Building Safety Regulator, in the clearest sign yet that the long-running approval logjam is finally starting to ease.<br />
Fresh BSR data shows applications covering 12,299 homes secured approval in the 12 weeks to 1 May as the regulator accelerated decisions on both new-build high-rise schemes and remediation projects.<br />
Across all categories, the regulator made 323 Gateway 2 decisions over the period wit]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gridlock-eases-as-12000-gateway-2-flats-approved-in-12-weeks/</link><pubDate>Wed, 06 May 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gridlock-eases-as-12000-gateway-2-flats-approved-in-12-weeks/</guid></item><item><title><![CDATA[Gateway 2 gridlock eases as 12,000 flats approved in 12-weeks]]></title><description><![CDATA[More than 12,000 housing units have cleared Gateway 2 approval in the latest 12-week push by the Building Safety Regulator, in the clearest sign yet that the long-running approval logjam is finally starting to ease.<br />
Fresh BSR data shows applications covering 12,299 homes secured approval in the 12 weeks to 1 May as the regulator accelerated decisions on both new-build high-rise schemes and remediation projects.<br />
Across all categories, the regulator made 323 Gateway 2 decisions over the period wit]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gateway-2-gridlock-eases-as-12000-flats-approved-in-12-weeks/</link><pubDate>Wed, 06 May 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gateway-2-gridlock-eases-as-12000-flats-approved-in-12-weeks/</guid></item><item><title><![CDATA[Contractors gear up for NHS SBS £750m framework rebid]]></title><description><![CDATA[NHS Shared Business Services is planning a bidders briefing next month ahead of the launch of its second-generation &pound;750m Public Sector Construction Works framework.<br />
The procurement body will set out its plans in a Teams meeting on 17 June as it gears up to replace its current four-year construction framework, which expires in September 2027.<br />
The new framework will cover public sector construction, refurbishment, demolition and civil engineering work across the UK and is expected to suppor]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-gear-up-for-nhs-sbs-750m-framework-rebid/</link><pubDate>Wed, 06 May 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-gear-up-for-nhs-sbs-750m-framework-rebid/</guid></item><item><title><![CDATA[Taxes, green rules and inflation slap £76,000 onto new home cost]]></title><description><![CDATA[House builders have warned a blizzard of taxes, levies and green rule changes has piled &pound;76,000 onto the cost of building a new home &ndash; pushing huge swathes of development land into the red.<br />
Fresh research from the Home Builders Federation claims the mounting burden is choking off housing delivery just as ministers ramp up pressure on the industry to build faster.<br />
The trade body said annual housing completions have already slumped 16% from their 2020 peak to just 208,000 homes in 2024]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/taxes-green-rules-and-inflation-slap-76000-onto-new-home-cost/</link><pubDate>Wed, 06 May 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/taxes-green-rules-and-inflation-slap-76000-onto-new-home-cost/</guid></item><item><title><![CDATA[Kier hires water sector commercial chief from Costain]]></title><description><![CDATA[Kier has snapped up a senior commercial lead from Costain to bolster its infrastructure division.<br />
Craig Message has joined Kier Infrastructure as commercial director after nearly 15 years rising through the ranks at Costain, where he most recently served as water sector commercial director.<br />
His move brings heavyweight major project experience, including a long stint on the Thames Tideway scheme through the CVB joint venture, where he progressed to commercial director.<br />
The hire strengthens Kier&r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-hires-water-sector-commercial-chief-from-costain/</link><pubDate>Wed, 06 May 2026 08:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-hires-water-sector-commercial-chief-from-costain/</guid></item><item><title><![CDATA[£1bn data centre gets green light in west London]]></title><description><![CDATA[Pure Data Centres and SEGRO have secured planning approval for a &pound;1bn, 72MW hyperscale data centre at Premier Park in west London.<br />
The Old Oak and Park Royal Development Corporation planning committee has backed plans to replace a redundant warehouse with a three-storey, liquid-cooled facility designed by Scott Brownrigg.<br />
The 22,365 sq m scheme will house nine data halls alongside office space, plant, storage and a secure entrance pavilion, supported by a dedicated substation to power the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/1bn-data-centre-gets-green-light-in-west-london/</link><pubDate>Tue, 05 May 2026 18:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/1bn-data-centre-gets-green-light-in-west-london/</guid></item><item><title><![CDATA[Tilbury Douglas lifts revenue to £600m]]></title><description><![CDATA[Tilbury Douglas is cashing in on its mid-range public works strategy as tighter bidding and delivery discipline lift margins and drive a record workload.<br />
The contractor pushed gross revenue, including inter-group trading, up 12% to &pound;692m in 2025, with consolidated reported revenue rising 11% to &pound;600m.<br />
Pre-tax profit climbed by 27% to nearly &pound;15m as operating margin strengthened to 2.4% from 2.1%.The improved margin shows the firm&rsquo;s selective approach to lower risk jobs is]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tilbury-douglas-lifts-revenue-to-600m/</link><pubDate>Tue, 05 May 2026 17:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tilbury-douglas-lifts-revenue-to-600m/</guid></item><item><title><![CDATA[Lighting tower hits power line on road maintenance job]]></title><description><![CDATA[A tree surgeon suffered a powerful electric shock from an overhead power line while carrying out maintenance to hedges on a busy road near Royal Wootton Bassett.<br />
The accident was caught on CCTV shortly after midnight on 19 January 2024 while Joshua Pocknell was working as part of a team of three on the A3102 when the mobile lighting tower he was pushing made contact with an overhead power line.<br />
The 26-year-old said: &ldquo;My whole body locked and I felt hot and cramping.<br />
&ldquo;I could hear the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lighting-tower-hits-power-line-on-road-maintenance-job/</link><pubDate>Tue, 05 May 2026 16:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lighting-tower-hits-power-line-on-road-maintenance-job/</guid></item><item><title><![CDATA[Vinci acquires developer ION]]></title><description><![CDATA[VINCI Construction has acquired ION Property Group and will merge it with VINCI UK Developments.<br />
The merged development business will focus on the local authority urban regeneration market, under the brand of ION Developments, headquartered at the Port of Liverpool Building.<br />
VINCI UK Developments and ION are already working jointly on a number of projects, including major urban regeneration schemes in Derby city centre, Chester Northgate 2, the Coventry Civic Centre site and Northwich Weaver Squ]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vinci-acquires-developer-ion/</link><pubDate>Tue, 05 May 2026 15:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vinci-acquires-developer-ion/</guid></item><item><title><![CDATA[T&amp;T appoints former Royal Mail chief in AI drive]]></title><description><![CDATA[Turner &amp; Townsend has appointed Emma Gilthorpe to the newly created role of Chief Transformation Officer.<br />
She will be responsible for driving global transformation including &ldquo;embracing the opportunities of AI and technology&rdquo; as Turner &amp; Townsend aims to become the world&rsquo;s leading programme management business.<br />
Gilthorpe was most recently Chief Executive of Royal Mail and previously spent nearly 15 years on the executive team at Heathrow Airport.David Whysall, Chief Oper]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tampt-appoints-former-royal-mail-chief-in-ai-drive/</link><pubDate>Tue, 05 May 2026 09:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tampt-appoints-former-royal-mail-chief-in-ai-drive/</guid></item><item><title><![CDATA[Birmingham lines up £400m highways design team]]></title><description><![CDATA[Birmingham City Council has named a four-strong consultant line-up to drive its next wave of highways and infrastructure schemes under a framework worth up to &pound;400m.<br />
The eight-year Transportation and Infrastructure Professional Services Framework will see AtkinsR&eacute;alis, Jacobs, Mott MacDonald and Pell Frischmann deliver multidisciplinary design and advisory services across the city.<br />
The deal covers everything from highways engineering and urban planning to air quality, drainage, traf]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/birmingham-lines-up-400m-highways-design-team/</link><pubDate>Tue, 05 May 2026 08:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/birmingham-lines-up-400m-highways-design-team/</guid></item><item><title><![CDATA[Recession fears deepen as building faces sharp decline]]></title><description><![CDATA[Construction economists have slashed the outlook for the industry, warning output will fall 2.5% in 2026 as geopolitical shockwaves from the Gulf ripple through costs, confidence and project pipelines.<br />
Forecasters at the Construction Products Association say the sector faces a tough 12&ndash;18 months, with oil and industrial energy price spikes already feeding into double-digit product inflation and forcing clients to delay schemes.<br />
The downgrade marks a sharp reversal from the CPA&rsquo;s wint]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/recession-fears-deepen-as-building-faces-sharp-decline/</link><pubDate>Tue, 05 May 2026 08:48:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/recession-fears-deepen-as-building-faces-sharp-decline/</guid></item><item><title><![CDATA[Sisk bridges the gap at York Central over Bank Holiday]]></title><description><![CDATA[Sisk pulled off a major engineering milestone over the Bank Holiday weekend, completing a complex series of long beam lifts to slot a new bridge into place over the East Coast Main Line at York Central.The complex lifting operation saw seven 86m-long steel beams craned in over one of the UK&rsquo;s busiest rail routes to create a vital new link between Park Street and Water End.<br />
Landing the structure marks a key turning point on the vast Homes England-backed regeneration scheme, unlocking the ne]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sisk-bridges-the-gap-at-york-central-over-bank-holiday/</link><pubDate>Tue, 05 May 2026 08:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sisk-bridges-the-gap-at-york-central-over-bank-holiday/</guid></item><item><title><![CDATA[Bathroom pod maker OEP files administration notice]]></title><description><![CDATA[Lancaster based bathroom pod specialist Offsite Engineered Products UK Ltd (OEP UK) has filed a notice of intention to appoint an administrator.<br />
Its sister company OEP Building Services went into administration in 2021 owing 135 suppliers &pound;1.7m.<br />
OEP UK bought OEP Building Services in a pre-pack sale for &pound;85,000 led by managing director Iain Crabtree.<br />
Since the deal was finalised OEP UK has won a series of pod supply deals with major contractors and developer.<br />
Construction data specia]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bathroom-pod-maker-oep-files-administration-notice/</link><pubDate>Tue, 05 May 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bathroom-pod-maker-oep-files-administration-notice/</guid></item><item><title><![CDATA[Ready-mixed concrete sales slump in London]]></title><description><![CDATA[Construction materials producers have warned there is &ldquo;no sign of recovery&rdquo; in demand after concrete, aggregates and mortar sales fell again at the start of the year.<br />
Latest figures from the Mineral Products Association show UK demand for essential construction materials dropped further in the first quarter of 2026, extending a four-year downturn.<br />
Mortar sales, a key indicator of house building activity, fell 2% on the previous quarter and were 5.4% down year-on-year.Ready-mixed conc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ready-mixed-concrete-sales-slump-in-london/</link><pubDate>Fri, 01 May 2026 09:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ready-mixed-concrete-sales-slump-in-london/</guid></item><item><title><![CDATA[McAlpine nudges margins higher as strategy reset pays-off]]></title><description><![CDATA[Sir Robert McAlpine is rebuilding margins after a major strategic reset, lifting pre-tax profit by more than half while holding turnover flat.<br />
The family-owned contractor posted pre-tax profit of around &pound;16m for the year to 31 October 2025, up from &pound;10m last time as it continued its recovery from a bruising &pound;105m loss in 2023.<br />
Reported contracting turnover remained steady at &pound;946m as the firm stayed selective on work to drive through margin improvement, with average contr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcalpine-nudges-margins-higher-as-strategy-reset-pays-off/</link><pubDate>Fri, 01 May 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcalpine-nudges-margins-higher-as-strategy-reset-pays-off/</guid></item><item><title><![CDATA[Gleeson Homes finds £5m+ of faults on legacy jobs]]></title><description><![CDATA[Gleeson Homes has discovered problems on completed jobs in Yorkshire which will cost up to &pound;7.1m to put right.<br />
The issues with site infrastructure were confirmed in a trading update which also announced integration of the Yorkshire East region into Yorkshire South and West this summer to cut costs.<br />
Gleeson said: &ldquo;Our new management teams have identified issues on previously completed legacy developments, mainly in Yorkshire, which require rectification in order to achieve adoption of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gleeson-homes-finds-5m-of-faults-on-legacy-jobs/</link><pubDate>Fri, 01 May 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gleeson-homes-finds-5m-of-faults-on-legacy-jobs/</guid></item><item><title><![CDATA[Government blinks on steel tariffs after contractor backlash]]></title><description><![CDATA[The Government has agreed to review the impact of its looming steel tariff crackdown after construction leaders warned it could derail projects and squeeze margins.<br />
Industry bodies including the Construction Leadership Council, British Constructional Steelwork Association and Construction Products Association met ministers last month to flag the risks tied to the planned July shake-up.<br />
Contractors said the planned 60% cut in import quotas and imposition of 50% tariffs above limits risk piling fr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-blinks-on-steel-tariffs-after-contractor-backlash/</link><pubDate>Fri, 01 May 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-blinks-on-steel-tariffs-after-contractor-backlash/</guid></item><item><title><![CDATA[Legendre lands City of London office refurb]]></title><description><![CDATA[Legendre UK has been appointed main contractor for a major office refurbishment at 10 Salisbury Square in the City of London.<br />
Upgrading the six-storey building will create 54,000 sq ft of office space and two new floors with the site renamed&nbsp;Oriel St Bride&rsquo;s.<br />
Work for client Original Works will retain 90% of the existing structure and employ low carbon construction techniques.The scheme has already been recognised for its environmental ambition, having been selected for the UK Net Zer]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/legendre-lands-city-of-london-office-refurb/</link><pubDate>Fri, 01 May 2026 08:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/legendre-lands-city-of-london-office-refurb/</guid></item><item><title><![CDATA[LHC launches £1bn housing and demolition framework]]></title><description><![CDATA[Public sector procurement body LHC Procurement Group has started the race for places on its third generation &pound;1bn housing, regeneration and demolition framework.<br />
Around 32 firms now face a fight to retain their places on the framework with expanded scope to cover new build residential schemes, retrofit and estate regeneration, demolition, remediation, enabling works and defence housing projects in England.<br />
A separate &pound;75m Welsh Procurement Alliance version has also been issued for Wa]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lhc-launches-1bn-housing-and-demolition-framework/</link><pubDate>Fri, 01 May 2026 08:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lhc-launches-1bn-housing-and-demolition-framework/</guid></item><item><title><![CDATA[Wates confirms new permanent London Construction MD]]></title><description><![CDATA[Wates has confirmed the permanent appointment of George Mosey as Managing Director for Construction London.<br />
He took over the interim role in February when Steve Holbrook left the business.<br />
Since joining Wates in March 2025 as UK Operations Director, Mosey has focused on driving forward safety, quality, sustainability and operational performance.He previously spent 16 years at Laing O&rsquo;Rourke rising through the ranks to become Head of Procurement.<br />
Steff Battle, Executive Managing Director, W]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-confirms-new-permanent-london-construction-md/</link><pubDate>Thu, 30 Apr 2026 16:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-confirms-new-permanent-london-construction-md/</guid></item><item><title><![CDATA[Kier turnaround CFO to join SIG]]></title><description><![CDATA[The Chief Financial Officer who helped turnaround Kier&rsquo;s fortunes is joining building materials distribution giant SIG.<br />
Simon Kesterton takes up his new role this week following the resignation of incumbent Ian Ashton.<br />
Kesterton spent six years at Kier helping steer the group through its biggest financial reset in a generation before stepping down in December.He joined when Kier was on the ropes with a battered balance sheet and mounting debt and left with the group firmly back on its feet]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-turnaround-cfo-to-join-sig/</link><pubDate>Thu, 30 Apr 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-turnaround-cfo-to-join-sig/</guid></item><item><title><![CDATA[Persimmon warns of mounting supply chain cost pressure]]></title><description><![CDATA[House builder Persimmon has warned of early signs of renewed cost inflation in its supply chain as fuel costs and energy prices begin to feed through, despite a solid start to 2026 trading.<br />
In a City trading update, the York-based group said first quarter performance was in line with expectations, with private sales rates ticking up and forward orders strengthening.<br />
Net private sales per outlet edged up 3% to 0.76, while private forward sales climbed 7% to &pound;1.8bn. Average selling prices al]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/persimmon-warns-of-mounting-supply-chain-cost-pressure/</link><pubDate>Thu, 30 Apr 2026 08:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/persimmon-warns-of-mounting-supply-chain-cost-pressure/</guid></item><item><title><![CDATA[US student housing giant targets Durham with 504-bed scheme]]></title><description><![CDATA[US developer Landmark Properties has exchanged contracts to revive a major mixed-use overhaul of Durham&rsquo;s Prince Bishops Place, centred on a 504-bed student scheme above revamped retail and leisure space.<br />
The deal sees Landmark partner with Citrus Group and Galliard Homes to acquire and redevelop the city centre shopping site, subject to fresh planning approval.<br />
A revised application lodged earlier this year lifts the student element to 504 beds and updates the design, building on consent]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/us-student-housing-giant-targets-durham-with-504-bed-scheme/</link><pubDate>Thu, 30 Apr 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/us-student-housing-giant-targets-durham-with-504-bed-scheme/</guid></item><item><title><![CDATA[US student housing giant targets Durham]]></title><description><![CDATA[US developer Landmark Properties has exchanged contracts to revive a major mixed-use overhaul of Durham&rsquo;s Prince Bishops Place, centred on a 504-bed student scheme above revamped retail and leisure space.<br />
The deal sees Landmark partner with Citrus Group and Galliard Homes to acquire and redevelop the city centre shopping site, subject to fresh planning approval.<br />
A revised application lodged earlier this year lifts the student element to 504 beds and updates the design, building on consent]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/us-student-housing-giant-targets-durham/</link><pubDate>Thu, 30 Apr 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/us-student-housing-giant-targets-durham/</guid></item><item><title><![CDATA[JRL lands 608-home London Thames City phase 2]]></title><description><![CDATA[JRL Group has secured the design and build contract for the next phase of the Thames City residential scheme at Nine Elms in London.<br />
Phase 2 will deliver 608 flats across five mansion-block buildings ranging from 12 to 22 storeys and is rumoured to be worth more than &pound;300m.<br />
The job continues JRL&rsquo;s role on the landmark Vauxhall regeneration scheme, where it previously delivered the N8 and N9 towers.Those earlier towers, standing at 53 and 37 storeys, were handed over in 2022 and 2023]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jrl-lands-608-home-london-thames-city-phase-2/</link><pubDate>Thu, 30 Apr 2026 08:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jrl-lands-608-home-london-thames-city-phase-2/</guid></item><item><title><![CDATA[Dalkia rebuilds margins with nuclear and energy rebound]]></title><description><![CDATA[Energy services and engineering specialist Dalkia has recovered from a weak prior year as nuclear and low carbon work drove a rebound in profit.<br />
The UK arm of the EDF-backed contractor lifted turnover 8% to &pound;657m in 2025, while pre-tax profit surged to &pound;8.2m from just &pound;0.3m the year before.<br />
Underlying performance also strengthened, with EBITDA before exceptional items more than doubling to &pound;18m.<br />
The turnaround comes as Dalkia leans heavily into nuclear, healthcare and dec]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dalkia-rebuilds-margins-with-nuclear-and-energy-rebound/</link><pubDate>Wed, 29 Apr 2026 16:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dalkia-rebuilds-margins-with-nuclear-and-energy-rebound/</guid></item><item><title><![CDATA[Dalkia rebuilds margins as nuclear and energy work fuels rebound]]></title><description><![CDATA[Energy services and engineering specialist Dalkia has recovered from a weak prior year as nuclear and low carbon work drove a rebound in profit.<br />
The UK arm of the EDF-backed contractor lifted turnover 8% to &pound;657m in 2025, while pre-tax profit surged to &pound;8.2m from just &pound;0.3m the year before.<br />
Underlying performance also strengthened, with EBITDA before exceptional items more than doubling to &pound;18m.<br />
The turnaround comes as Dalkia leans heavily into nuclear, healthcare and dec]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dalkia-rebuilds-margins-as-nuclear-and-energy-work-fuels-rebound/</link><pubDate>Wed, 29 Apr 2026 16:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dalkia-rebuilds-margins-as-nuclear-and-energy-work-fuels-rebound/</guid></item><item><title><![CDATA[Former Wates MD rejoins sister firm SES]]></title><description><![CDATA[Former Wates managing director Mark Tant is rejoining its M&amp;E business SES as interim boss of the south division.<br />
Tant left Wates in 2023 to set up his own consultancy.<br />
He steps-in to the fill the role left at SES&rsquo;s Engineering South division by Darren Wilson who has been appointed commercial director to the wider business and promoted to the board.The company said: &ldquo;Mark brings extensive senior leadership experience having worked closely with SES through a consultancy role, his]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/former-wates-md-rejoins-sister-firm-ses/</link><pubDate>Wed, 29 Apr 2026 11:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/former-wates-md-rejoins-sister-firm-ses/</guid></item><item><title><![CDATA[Materials firms urged to explain price rise reasons]]></title><description><![CDATA[Construction leaders are calling for greater transparency over current and planned materials price rises.<br />
In its latest update the Construction Leadership Council&rsquo;s Construction Material Supply Chain Group said: &ldquo;One of the key challenges across the supply chain remains the lack of detailed explanation accompanying price increases, making it difficult to justify and communicate these costs to clients.<br />
&ldquo;Clearer evidence and transparency would be welcomed, even if the increases t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/materials-firms-urged-to-explain-price-rise-reasons/</link><pubDate>Wed, 29 Apr 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/materials-firms-urged-to-explain-price-rise-reasons/</guid></item><item><title><![CDATA[Ballymore gets go-ahead for 1,700-home Silvertown scheme]]></title><description><![CDATA[Developer Ballymore&rsquo;s 1,700-home London Docklands riverside development spanning 5.26ha in Silvertown has been approved by Newham Council.<br />
The Allies and Morrison-designed Knights Road scheme will deliver 334 affordable homes alongside around 4,000 sq m of workspace, plus retail and community uses.<br />
Ballymore&rsquo;s hybrid application includes detailed consent for a first phase of 640 homes in three blocks ranging from six to 18 storeys, with 2,300 sq m of flexible commercial space.Outline]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ballymore-gets-go-ahead-for-1700-home-silvertown-scheme/</link><pubDate>Wed, 29 Apr 2026 09:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ballymore-gets-go-ahead-for-1700-home-silvertown-scheme/</guid></item><item><title><![CDATA[Legendre gets green light for office-to-hotel scheme]]></title><description><![CDATA[Legendre UK and JV partners Central &amp; Provincial and Candour Properties have achieved planning consent for a major office-to-hotel conversion in west London.<br />
Work will see the transformation of Grove House in Hammersmith which was originally designed by Sir John Burnet Tait &amp; Partners and built in 1949.<br />
The five-storey building will be reinvented as a modern mixed-use development comprising 5,500 sq m of hotel space alongside affordable office workspace ground-floor commercial space.Desi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/legendre-gets-green-light-for-office-to-hotel-scheme/</link><pubDate>Wed, 29 Apr 2026 08:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/legendre-gets-green-light-for-office-to-hotel-scheme/</guid></item><item><title><![CDATA[Bristol backs 28-storey student tower at Cabot Gate]]></title><description><![CDATA[A landmark student tower and community hub scheme has secured planning in Bristol, unlocking regeneration of a key brownfield site next to Cabot Circus.<br />
Bristol City Council has approved plans by Hammerson to transform underused land beside the shopping centre&rsquo;s car park into a greener, pedestrian-led destination with new student homes, caf&eacute; space and a dedicated youth facility.<br />
Designed by Allford Hall Monaghan Morris, the project will deliver two buildings anchored by a 28-storey]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bristol-backs-28-storey-student-tower-at-cabot-gate/</link><pubDate>Wed, 29 Apr 2026 08:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bristol-backs-28-storey-student-tower-at-cabot-gate/</guid></item><item><title><![CDATA[Brighton plans purpose-built £80m women’s football stadium]]></title><description><![CDATA[Brighton &amp; Hove Albion are pressing ahead with plans for a &pound;80m purpose-built women&rsquo;s stadium in what is being hailed as a defining moment for the sport.<br />
Club chiefs want to build a 10,000-seat ground at Bennett&rsquo;s Field next to the Amex, linked by a new bridge, with doors opening for the 2030/31 season.<br />
The scheme is set to become the first dedicated women&rsquo;s football stadium in the UK and Europe, underlining a major shift in how elite women&rsquo;s sport is being deli]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/brighton-plans-purpose-built-80m-womens-football-stadium/</link><pubDate>Tue, 28 Apr 2026 20:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/brighton-plans-purpose-built-80m-womens-football-stadium/</guid></item><item><title><![CDATA[Graham to deliver first phase of Solihull town centre revamp]]></title><description><![CDATA[GRAHAM has signed a Pre-Construction Services Agreement to work towards delivery of the first phase of the Holbeche Place redevelopment in Solihull town centre.<br />
The deal follows recent planning approval by Muse for the redevelopment of Mell Square which will be renamed Holbeche Place.<br />
Phase one will include the design and construction of a residential-led development delivering 346 build-to-rent homes across four buildings of varying heights, alongside ground-floor commercial and amenity space.T]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-to-deliver-first-phase-of-solihull-town-centre-revamp/</link><pubDate>Tue, 28 Apr 2026 10:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-to-deliver-first-phase-of-solihull-town-centre-revamp/</guid></item><item><title><![CDATA[Family of former UCATT president secure asbestos payout]]></title><description><![CDATA[The family of a former trade union president have secured a settlement from three contractors in connection with his death.<br />
John Flavin, a former president of the Union of Construction, Allied Trades and Technicians (UCATT), died aged 78 in 2022 after being diagnosed with asbestos related lung cancer &ndash; caused by the asbestos exposure he experienced decades previously working on site.<br />
Lawyers at Irwin Mitchell secured a settlement from three of Flavin&rsquo;s former employers for his asbest]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/family-of-former-ucatt-president-secure-asbestos-payout/</link><pubDate>Tue, 28 Apr 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/family-of-former-ucatt-president-secure-asbestos-payout/</guid></item><item><title><![CDATA[Caddick rises to £375m turnover but headwinds cut profit]]></title><description><![CDATA[Caddick Construction Group raised turnover 8% to a record &pound;375m last year but saw profit fall as tough market conditions hit margins, with pre-tax profit dropping to &pound;4.5m from &pound;8.3m the year before.<br />
The contractor said inflation, project delays, Building Safety Act disruption and material price volatility all weighed on performance.<br />
The business also wrote off legacy contracts impacted by inflation and subcontractor insolvency during the year to 31 August 2025.Despite the toug]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-rises-to-375m-turnover-but-headwinds-cut-profit/</link><pubDate>Tue, 28 Apr 2026 08:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-rises-to-375m-turnover-but-headwinds-cut-profit/</guid></item><item><title><![CDATA[Pagabo starts race for new £5bn major works framework]]></title><description><![CDATA[Pagabo has opened bidding for a &pound;5bn National Framework for Major Works, setting up a fresh four-year pipeline of public sector building work.<br />
The deal, due to launch in October, is the first major building framework to come to market under Pagabo&rsquo;s 10-year strategic partnership with Yorkshire Purchasing Organisation, which will act as contracting authority.<br />
Last week, the two partners also unveiled plans to consolidate civils deals into a new &pound;4.2bn national civils and enablin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pagabo-starts-race-for-new-5bn-major-works-framework/</link><pubDate>Tue, 28 Apr 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pagabo-starts-race-for-new-5bn-major-works-framework/</guid></item><item><title><![CDATA[Groundworks firm Mackoy files administration notice]]></title><description><![CDATA[Groundworks contractor Mackoy Limited has filed a notice of intention to appoint an administrator.<br />
The Hampshire based firm is one of the biggest groundworks specialists in the South of England focused on infrastructure for housing and commercial schemes.<br />
Mackoy said it has invested more than &pound;10m in new plant since the business began in 2011.Latest accounts for the year to March 31 2025 show a turnover of &pound;23.3m generating a pre-tax loss of &pound;616,000 compared to an &pound;866,0]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/groundworks-firm-mackoy-files-administration-notice/</link><pubDate>Tue, 28 Apr 2026 08:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/groundworks-firm-mackoy-files-administration-notice/</guid></item><item><title><![CDATA[Balfour gets start date for £54m Middlewich bypass]]></title><description><![CDATA[Balfour Beatty has finally got the green light to start main construction on the &pound;54m Middlewich Eastern Bypass in Cheshire.<br />
Cheshire East Council has issued notice to proceed on the long-awaited road scheme, which was procured through the SCAPE framework.<br />
Work will start next month on the 2.5km bypass running to the east of Middlewich in Cheshire.The job includes two major junctions, a new highway bridge over the Trent and Mersey Canal, a bridge over the Sandbach-Northwich railway line an]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-gets-start-date-for-54m-middlewich-bypass/</link><pubDate>Mon, 27 Apr 2026 16:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-gets-start-date-for-54m-middlewich-bypass/</guid></item><item><title><![CDATA[McAleer &amp; Rushe full of confidence after record results]]></title><description><![CDATA[Design and build contractor McAleer &amp; Rushe has reported another year of strong growth with record turnover and increased profits.<br />
Results for 2025 show revenue up 27% to &pound;627.7m for 2025 as pre-tax profits rose by 37% to &pound;22m.<br />
The firm is confident its performance will continue this year after a strong start to 2026.Eamonn Laverty, Chief Executive at McAleer &amp; Rushe, said: &ldquo;Our 2025 results reflect a year of strong operational performance and disciplined growth, with r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcaleer-amp-rushe-full-of-confidence-after-record-results/</link><pubDate>Mon, 27 Apr 2026 11:37:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcaleer-amp-rushe-full-of-confidence-after-record-results/</guid></item><item><title><![CDATA[McLaren seals Sizewell C worker campus and apprentice college]]></title><description><![CDATA[McLaren Construction has been confirmed as the construction manager to deliver Sizewell C&rsquo;s 2,400-bed worker campus and a training college at the power station site.<br />
The three-year framework deal will see McLaren supervise and coordinate delivery of the project&rsquo;s new post-16 college, temporary worker accommodation campus, amenity building, project office and emergency response building.<br />
First up will be work on part of the vast accommodation campus and amenity buildings needed to hou]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-seals-sizewell-c-worker-campus-and-apprentice-college/</link><pubDate>Mon, 27 Apr 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-seals-sizewell-c-worker-campus-and-apprentice-college/</guid></item><item><title><![CDATA[B+K gets green light for £1bn Golden Valley first phase]]></title><description><![CDATA[Bowmer &amp; Kirkland is set to start work on the first phase of Cheltenham&rsquo;s &pound;1bn Golden Valley cyber campus after detailed plans were approved.<br />
Cheltenham Borough Council&rsquo;s planning committee has cleared reserved matters for the southern parcel of the HBD-led scheme.<br />
Approval covers layout, appearance, scale, access and landscaping for the first phase, including the 160,000 sq ft IDEA building and a new transport hub.Bowmer &amp; Kirkland was appointed last September to deliv]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bk-gets-green-light-for-1bn-golden-valley-first-phase/</link><pubDate>Mon, 27 Apr 2026 09:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bk-gets-green-light-for-1bn-golden-valley-first-phase/</guid></item><item><title><![CDATA[Willmott Dixon lands £92m Wembley college campus]]></title><description><![CDATA[Willmott Dixon has secured a &pound;92m job to build a new campus for the College of North West London at Wembley Park.<br />
The landmark further education scheme for United Colleges Group will see a long-disused building on Olympic Way demolished to create an eight-storey teaching and skills hub close to Wembley Stadium.<br />
The job was secured through the Southern Construction Framework and will support Brent Council&rsquo;s push to create a new education quarter at Wembley.The 14,200 sq m campus will]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-lands-92m-wembley-college-campus/</link><pubDate>Mon, 27 Apr 2026 08:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-lands-92m-wembley-college-campus/</guid></item><item><title><![CDATA[Go-ahead for Microsoft’s £4bn Leeds data hub push]]></title><description><![CDATA[Microsoft has secured the green light for a major hyperscale data centre campus at the former Skelton Grange power station site in Leeds.<br />
Leeds City Council unanimously approved the hybrid application covering a 65-acre site on the north-east bank of the River Aire.<br />
The scheme, led by Microsoft, will deliver three data centre buildings totalling around 424,000 sq ft alongside power, water and energy infrastructure.Outline consent was also granted for 160,000 sq ft of industrial space on land ret]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-microsofts-4bn-leeds-data-hub-push/</link><pubDate>Mon, 27 Apr 2026 08:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-microsofts-4bn-leeds-data-hub-push/</guid></item><item><title><![CDATA[Historic builder Jerram Falkus went down owing suppliers £8m]]></title><description><![CDATA[London contractor Jerram Falkus Construction Ltd went into administration owing &pound;8.2m to more than 400 subcontractors and suppliers.<br />
The scale of the historic contractor&rsquo;s trade debt was revealed in a Companies House update from administrator FRP Advisory who took charge of the firm in February.<br />
Jerram Falkus&nbsp;has been in business since 1884 operating across London and the South-East on projects between &pound;2m and &pound;40m.It employed 63 full time staff from central London o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/historic-builder-jerram-falkus-went-down-owing-suppliers-8m/</link><pubDate>Mon, 27 Apr 2026 08:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/historic-builder-jerram-falkus-went-down-owing-suppliers-8m/</guid></item><item><title><![CDATA[Engineering construction workers land 4.5% pay rise]]></title><description><![CDATA[Thousands of engineering construction workers will receive a pay rise of 4.5% from May.<br />
The deal was narrowly accepted in a vote by 3,000 workers, who operate under the National Agreement for the Engineering Construction Industry (NAECI).<br />
Workers will see their wages increase by around &pound;2,000 on average.Unite general secretary Sharon Graham said:&nbsp;&ldquo;Due to the deal passing by a slim majority, Unite is now seeking to open negotiations for 2027 pay with the employers&rsquo; side as]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/engineering-construction-workers-land-45-pay-rise/</link><pubDate>Fri, 24 Apr 2026 15:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/engineering-construction-workers-land-45-pay-rise/</guid></item><item><title><![CDATA[Graham lands £60m Trafford Stretford Mall flats job]]></title><description><![CDATA[Greater Manchester&rsquo;s Trafford Council has picked contractor Graham to deliver its long-awaited redevelopment of Stretford Mall shopping centre for housing.<br />
The contractor saw off competition from Domis, GMI and HG Construction to take the first major build to rent phase for the Bruntwood&ndash;Trafford joint venture, known as Plot 2A.<br />
The &pound;60m win puts Graham in a strong position to pick up further work on the wider &pound;175m pipeline covering two additional plots still to be procu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-lands-60m-trafford-stretford-mall-flats-job/</link><pubDate>Fri, 24 Apr 2026 08:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-lands-60m-trafford-stretford-mall-flats-job/</guid></item><item><title><![CDATA[Benniman rides logistics boom to £140m turnover]]></title><description><![CDATA[Midlands contractor Benniman has cashed in on booming demand for industrial and logistics space, driving a 40% surge in revenue and pushing pre-tax profit beyond &pound;10m.<br />
The Bromsgrove-based builder and developer posted revenue of &pound;140m for the year to December 2025, up from &pound;100m, while pre-tax profit climbed 27%.<br />
Growth has been powered by resurgent demand for warehouse and distribution schemes.Cash generation remained a standout, with reserves jumping to &pound;54.4m from &pou]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/benniman-rides-logistics-boom-to-140m-turnover/</link><pubDate>Fri, 24 Apr 2026 08:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/benniman-rides-logistics-boom-to-140m-turnover/</guid></item><item><title><![CDATA[All change at the top at McGee]]></title><description><![CDATA[McGee Managing Director Seb Fossey is leaving the specialist engineering contractor.<br />
The Enquirer understands staff were briefed earlier this week about his departure after nearly ten years at the business.<br />
Fossey joined McGee in 2017 from Laing O&rsquo;Rourke where he spent 14 years as a project manager on major sites worldwide before becoming the firm&rsquo;s Technical Leader.He took over the running as MD of McGee in 2019.<br />
Fossey is being replaced by&nbsp;Bernard O&rsquo;Reilly who steps up f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/all-change-at-the-top-at-mcgee/</link><pubDate>Fri, 24 Apr 2026 07:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/all-change-at-the-top-at-mcgee/</guid></item><item><title><![CDATA[Bovis owner pulls out of bid for brick giant]]></title><description><![CDATA[Bovis owner Atlas has pulled the plug on a takeover bid&nbsp;for bricks and materials giant Brickability.<br />
The US private-equity firm made a cut-price 65p-a-share cash offer last month which was quickly rejected by the AIM-listed supplier, now branded BRCK.<br />
Both sides continued talks but Atlas has now walked away after &ldquo;a 90-minute meeting with the CEO of BRCK at which limited further information was supplied.&rdquo;The firm added: &ldquo;The limited information supplied, and the limited ma]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bovis-owner-pulls-out-of-bid-for-brick-giant/</link><pubDate>Thu, 23 Apr 2026 18:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bovis-owner-pulls-out-of-bid-for-brick-giant/</guid></item><item><title><![CDATA[Reds10 lands £22.5m modular school job in Leicestershire]]></title><description><![CDATA[Reds10 has been appointed by the Department for Education to deliver a new &pound;22.5m STEAM (Science, Technology, Engineering, Arts, and Mathematics) facility at The Hinckley School in Leicestershire.<br />
The 103-module building will provide a range of specialist and general teaching spaces, including science laboratories, IT suites, engineering workshops, classrooms, and food technology kitchens.<br />
It will be delivered using Reds10&rsquo;s advanced volumetric modular construction approach, with app]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/reds10-lands-225m-modular-school-job-in-leicestershire/</link><pubDate>Thu, 23 Apr 2026 14:04:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/reds10-lands-225m-modular-school-job-in-leicestershire/</guid></item><item><title><![CDATA[Balfour gets trial date for nuclear site death]]></title><description><![CDATA[A date has been set for the trial of Balfour Beatty Group Limited following a fatality at AWE&rsquo;s Aldermaston nuclear site.<br />
Balfour appeared at Reading Crown Court this week for a pre-trial preparation hearing.<br />
The charges relate to an incident which occurred at the nuclear site in West Berkshire on 6 July 2023 when Stuart Cook, 58, a construction worker from East London, died after sustaining fatal injuries.A trial date was scheduled for 22 May 2028, at Reading Crown Court, which is expecte]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-gets-trial-date-for-nuclear-site-death/</link><pubDate>Thu, 23 Apr 2026 13:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-gets-trial-date-for-nuclear-site-death/</guid></item><item><title><![CDATA[Wates order book hits record high]]></title><description><![CDATA[Wates Group has confirmed its largest-ever pipeline of work with &pound;10bn secured as it unveiled&nbsp;a strong set of results.<br />
The family owned firm saw turnover increase to &pound;2.56bn in 2025 from &pound;2.4bn last time as pre-tax profits rose to &pound;29.2 from &pound;2.6m.<br />
The business also ended the year with a record net cash position of &pound;248.3m &ndash; up &pound;52.7m.Wates said it was reaping the dividends of a year of consolidation in 2024 which saw the embedding of property]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-order-book-hits-record-high/</link><pubDate>Thu, 23 Apr 2026 09:00:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-order-book-hits-record-high/</guid></item><item><title><![CDATA[Pagabo unveils new £4.2bn civils mega-framework under YPO tie-up]]></title><description><![CDATA[Pagabo has fired the starting gun on a new &pound;4.2bn national civils and enabling works framework under new long-term partnership with fellow procurement group Yorkshire Purchasing Organisation.<br />
The four-year deal will consolidate two existing agreements covering infrastructure and demolition into a single UK-wide vehicle spanning civils, rail, highways, energy and full enabling works.<br />
The move marks the first major pipeline release under a 10-year strategic tie-up between Yorkshire Purchasin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pagabo-unveils-new-42bn-civils-mega-framework-under-ypo-tie-up/</link><pubDate>Thu, 23 Apr 2026 08:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pagabo-unveils-new-42bn-civils-mega-framework-under-ypo-tie-up/</guid></item><item><title><![CDATA[B+K builds profits as £477m cash pile fuels expansion]]></title><description><![CDATA[Derby-based building contractor and property business Bowmer &amp; Kirkland has shrugged off challenging markets to lift pre-tax profit 11% to &pound;76m.<br />
The privately-owned group grew turnover to &pound;1.37bn from &pound;1.29bn in the year to 31 August 2025, while operating profit surged by around a third to &pound;47m as margins improved across the business from 2.7% to 3.5%.<br />
Performance was underpinned by tight cost control and a strong pipeline of framework and repeat work, helping offset]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bk-builds-profits-as-477m-cash-pile-fuels-expansion/</link><pubDate>Thu, 23 Apr 2026 08:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bk-builds-profits-as-477m-cash-pile-fuels-expansion/</guid></item><item><title><![CDATA[Four arrested as SFO probes ECO4 retrofit claims]]></title><description><![CDATA[The Serious Fraud Office has launched a major fraud investigation into three firms over suspected bogus claims on government-backed home heating and insulation work worth at least &pound;44m.<br />
Warmfront, JJ Crump and South Coast Insulation Services are being investigated over allegations they conspired to exploit the Energy Company Obligation 4 scheme by submitting claims for jobs where little or no work was carried out.ECO4 is the government&rsquo;s flagship energy efficiency programme aimed at]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/four-arrested-as-sfo-probes-eco4-retrofit-claims/</link><pubDate>Wed, 22 Apr 2026 15:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/four-arrested-as-sfo-probes-eco4-retrofit-claims/</guid></item><item><title><![CDATA[Dundee joinery specialist ceases trading after 163 years]]></title><description><![CDATA[A long-running Dundee joinery contractor has gone under with the loss of all 23 jobs after struggling to ride out a prolonged downturn in activity.<br />
Alexander Oastler Ltd, which traded as Oastler, has ceased trading after Interpath appointed James Dewar and Alistair McAlinden as joint provisional liquidators on 21 April.<br />
The Dundee-based business, founded in 1863, delivered joinery services across residential and commercial markets, including refurbishments and bespoke manufacture of furniture, w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dundee-joinery-specialist-ceases-trading-after-163-years/</link><pubDate>Wed, 22 Apr 2026 15:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dundee-joinery-specialist-ceases-trading-after-163-years/</guid></item><item><title><![CDATA[Costain opts for 3D printed concrete on Teesside job]]></title><description><![CDATA[Costain has become the latest contractor to deploy 3D printed, low-carbon concrete on a major UK infrastructure scheme as the technology starts to break into the mainstream.<br />
The firm and civils partner A E Yates have teamed up with Finnish specialist Hyperion Robotics to deliver 90 high-strength concrete pipe support bases for a flagship carbon capture project on Teesside.<br />
The components &ndash; known as sleepers &ndash; will support 1.3km of pipeline forming part of the East Coast Cluster carbo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-opts-for-3d-printed-concrete-on-teesside-job/</link><pubDate>Wed, 22 Apr 2026 14:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-opts-for-3d-printed-concrete-on-teesside-job/</guid></item><item><title><![CDATA[Costain opts for 3D printed concrete on Teesside carbon capture job]]></title><description><![CDATA[Costain has become the latest contractor to deploy 3D printed, low-carbon concrete on a major UK infrastructure scheme as the technology starts to break into the mainstream.<br />
The firm and civils partner A E Yates have teamed up with Finnish specialist Hyperion Robotics to deliver 90 high-strength concrete pipe support bases for a flagship carbon capture project on Teesside.<br />
The components &ndash; known as sleepers &ndash; will support 1.3km of pipeline forming part of the East Coast Cluster carbo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-opts-for-3d-printed-concrete-on-teesside-carbon-capture-job/</link><pubDate>Wed, 22 Apr 2026 14:34:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-opts-for-3d-printed-concrete-on-teesside-carbon-capture-job/</guid></item><item><title><![CDATA[National Grid plugs in 13 firms for substation works surge]]></title><description><![CDATA[National Grid has named 13 contractors to deliver substation construction and upgrades.The dynamic market framework &ndash; now live and open-ended &ndash; means more firms can still joinbut for now the initial preferred firms are in pole position to tap into one of the UK&rsquo;s biggest upcoming pipelines of substation work.<br />
Laing O&rsquo;Rourke emerged as the big winner, securing places on all three workstreams covering EPC delivery, M&amp;E installation and major civils.A tight five-strong p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/national-grid-plugs-in-13-firms-for-substation-works-surge/</link><pubDate>Wed, 22 Apr 2026 09:24:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/national-grid-plugs-in-13-firms-for-substation-works-surge/</guid></item><item><title><![CDATA[Sisk tipped for £280m Battersea Power Station next phase]]></title><description><![CDATA[John Sisk is closing in on a landmark &pound;280m deal to deliver the next phase of the Battersea Power Station redevelopment in London.<br />
The contractor is understood to be the frontrunner for phase 3C &ndash; the final two buildings designed by Gehry Partners &ndash; with the Malaysian-backed developer said to be nearing agreement.<br />
Industry sources said the deal is not yet signed but Sisk has emerged as favourite in what would mark a major success for the firm in the capital.The pair of blocks w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sisk-tipped-for-280m-battersea-power-station-next-phase/</link><pubDate>Wed, 22 Apr 2026 08:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sisk-tipped-for-280m-battersea-power-station-next-phase/</guid></item><item><title><![CDATA[£60bn hospital rebuild faces fresh delay danger]]></title><description><![CDATA[The key next phase of the &pound;60bn New Hospital Programme is facing mounting delivery risk just as major construction is due to start from next year.<br />
MPs have warned that wave 1 &ndash; a &pound;8.9bn pipeline of 16 hospital schemes &ndash; could trigger wider delays across the programme if early projects slip.<br />
The Public Accounts Committee said the Department of Health and Social Care has set aside just 3% contingency funding for the 2025-30 period, leaving &ldquo;very little buffer&rdquo; t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/60bn-hospital-rebuild-faces-fresh-delay-danger/</link><pubDate>Wed, 22 Apr 2026 08:40:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/60bn-hospital-rebuild-faces-fresh-delay-danger/</guid></item><item><title><![CDATA[Contractor hunt starts for £70m Liverpool resi schemes]]></title><description><![CDATA[Planners have given the green light to two residential schemes in Liverpool&rsquo;s Baltic tech hub worth a combined &pound;70m.<br />
Davos Property Developments &ndash; a subsidiary of TJ Morris &ndash; is now looking for contractors for the &pound;57m scheme on Greenland Street and the &pound;13m Blundell Street job.<br />
A source close to the schemes said: &ldquo;The developer wants to get on with these quickly so will be hoping Enquirer readers can help.&rdquo;Both projects have been designed by the L]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractor-hunt-starts-for-70m-liverpool-resi-schemes/</link><pubDate>Wed, 22 Apr 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractor-hunt-starts-for-70m-liverpool-resi-schemes/</guid></item><item><title><![CDATA[Aureos hiring spree eats into margins despite strong growth]]></title><description><![CDATA[Aureos Infrastructure Services has pushed hard on growth following its carve-out from Keltbray, but profits remain stuck after a year of heavy investment in people and acquisitions.<br />
The business, created after private equity firm EMK Capital acquired Keltbray&rsquo;s infrastructure arm in August 2024, lifted turnover 15% to &pound;367m in the year to October 2025.<br />
But that growth has yet to translate into returns, with statutory pre-tax profit edging down 6% to &pound;3.2m from &pound;3.4m.The f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/aureos-hiring-spree-eats-into-margins-despite-strong-growth/</link><pubDate>Wed, 22 Apr 2026 08:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/aureos-hiring-spree-eats-into-margins-despite-strong-growth/</guid></item><item><title><![CDATA[Humanoid robot goes to work on Tilbury Douglas site]]></title><description><![CDATA[Tilbury Douglas said it has become the first tier one contractor to deploy a humanoid robot on a live construction site.<br />
The robot &ndash; named Douglas &ndash; has been introduced to support and assist site teams by undertaking administrative data-collection tasks.<br />
The robot is capable of autonomously navigating the construction site to capture 360-degree imagery and detailed progress reports to support health and safety monitoring and reporting processes.The initiative is expected to save an a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/humanoid-robot-goes-to-work-on-tilbury-douglas-site/</link><pubDate>Tue, 21 Apr 2026 11:35:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/humanoid-robot-goes-to-work-on-tilbury-douglas-site/</guid></item><item><title><![CDATA[Watkin Jones clears Gateway 2 hurdle on Bristol PBSA job]]></title><description><![CDATA[Watkin Jones has secured Gateway 2 approval for a 484-bed student scheme in Bristol, paving the way for full construction to push ahead on its Malago Road site.<br />
The &pound;100m scheme is being delivered through a joint venture between Watkin Jones and Maslow Capital.<br />
Located on a brownfield plot in Bristol&rsquo;s Temple Quarter regeneration zone, the project will deliver a mix of studios and cluster rooms across three blocks, including 30 non-ensuite units.Plans target BREEAM Excellent, EPC B a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-clears-gateway-2-hurdle-on-bristol-pbsa-job/</link><pubDate>Tue, 21 Apr 2026 09:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-clears-gateway-2-hurdle-on-bristol-pbsa-job/</guid></item><item><title><![CDATA[Billington profit impacted by client project delays]]></title><description><![CDATA[Structural steelwork contractor Billington is predicting a better year ahead after profits tumbled in 2025 in the face of client project delays, market pricing pressure, and the cost of shutting its Bristol fabrication plant.<br />
The Barnsley-based group saw revenue fall 15% to &pound;96m for the year to December 2025, while pre-tax profit dropped to &pound;1.3m from &pound;10.8m a year earlier.<br />
Underlying pre-tax profit, stripping out &pound;2.8m of one-off costs tied mainly to the closure of the Y]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/billington-profit-impacted-by-client-project-delays/</link><pubDate>Tue, 21 Apr 2026 09:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/billington-profit-impacted-by-client-project-delays/</guid></item><item><title><![CDATA[Crest Nicholson in talks with lenders as market tanks]]></title><description><![CDATA[Crest Nicholson has started talks with its lenders seeking temporary relaxation of its banking covenants.<br />
In a trading update today the house builder issued a profit warning as it flagged the ongoing impact of macroeconomic uncertainty which it expects to last until October at least.<br />
The firm said: &ldquo;The Group remains confident that it is well positioned to navigate the economic uncertainty. However, as a consequence of lower expected profitability, it is in the early stages of seeking temp]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/crest-nicholson-in-talks-with-lenders-as-market-tanks/</link><pubDate>Tue, 21 Apr 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/crest-nicholson-in-talks-with-lenders-as-market-tanks/</guid></item><item><title><![CDATA[HW Martin tops £300m as traffic arm leads charge]]></title><description><![CDATA[Derbyshire-based HW Martin Holdings has posted record turnover but seen profits slide as rapid expansion and cost pressures squeeze margins across the business.<br />
Revenue climbed 18% to &pound;316m for the year to July 2025 with growth heavily driven by its traffic management operations.<br />
Operating profit fell to &pound;25m from &pound;30m, cutting operating margin to around 8% from 11%, while pre-tax profit dropped to &pound;27m from &pound;33m.Traffic management remains the dominant division, gen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hw-martin-tops-300m-as-traffic-arm-leads-charge/</link><pubDate>Tue, 21 Apr 2026 08:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hw-martin-tops-300m-as-traffic-arm-leads-charge/</guid></item><item><title><![CDATA[Teenage builder dies after concrete pipe accident]]></title><description><![CDATA[Police have confirmed a 17-year-old has died after a concrete pipe fell on him while he was working at a building site.<br />
Shay Bladen was seriously injured at the 368-homes Sniperley Park DH1 homes development last Thursday afternoon.<br />
He was taken to the Royal Victoria Infirmary in Newcastle where Durham Constabulary has now confirmed he died on Friday.&ldquo;We love you and seeing how highly everyone speaks about you just shows the type of person you were.<br />
&ldquo;Our handsome brown-eyed boy &ndas]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/teenage-builder-dies-after-concrete-pipe-accident/</link><pubDate>Tue, 21 Apr 2026 00:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/teenage-builder-dies-after-concrete-pipe-accident/</guid></item><item><title><![CDATA[Sovereign unveils winners for affordable homes deal]]></title><description><![CDATA[Sovereign Network Group (HSG) has confirmed the full line-up of winners on its new Contractor Framework for Affordable Homes.<br />
The framework will support the housing association&rsquo;s planned regeneration and high-rise new-build programmes alongside its &pound;10.9bn, 10-year investment plan.<br />
Through this investment, SNG aims to deliver 25,000 new homes and regenerate existing communities across the south of England.In total, the framework comprises 12 lots, with each region also including a Co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sovereign-unveils-winners-for-affordable-homes-deal/</link><pubDate>Mon, 20 Apr 2026 11:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sovereign-unveils-winners-for-affordable-homes-deal/</guid></item><item><title><![CDATA[AstraZeneca wins go-ahead for Cambridge conference centre]]></title><description><![CDATA[AstraZeneca has secured planning approval for a major new office and conference building at Cambridge Biomedical Campus.<br />
The pharma giant has been given the green light by Cambridge City Council for a six-storey block on Francis Crick Avenue that will accommodate up to 736 workers.<br />
The scheme is geared around collaboration and large-scale events, with plans including a 200-person conference centre, a 450-seat auditorium and a 110-cover restaurant alongside office space.<br />
The project forms part of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/astrazeneca-wins-go-ahead-for-cambridge-conference-centre/</link><pubDate>Mon, 20 Apr 2026 09:27:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/astrazeneca-wins-go-ahead-for-cambridge-conference-centre/</guid></item><item><title><![CDATA[Ferrovial Construction UK hits 4% margin as profit jumps]]></title><description><![CDATA[Ferrovial Construction UK has delivered a sharp margin breakthrough with profits surging as the contractor moves firmly into higher-return territory.<br />
The UK construction business of the Spanish giant posted a pre-tax profit of &pound;25m for 2025, up from &pound;14m the previous year.<br />
The jump was driven by a step-change in operating margin, which leapt to 4% from just 1% &mdash; a threefold increase that puts the business comfortably ahead of the Spanish group&rsquo;s long-term 3.5% target for]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ferrovial-construction-uk-hits-4-margin-as-profit-jumps/</link><pubDate>Mon, 20 Apr 2026 08:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ferrovial-construction-uk-hits-4-margin-as-profit-jumps/</guid></item><item><title><![CDATA[DfE unleashes £243m school rebuild wave for main works]]></title><description><![CDATA[The Department for Education has signed off main works deals for &pound;243m of school projects to move into main construction.<br />
Nine schemes across England have now been cleared to start on site with final contract awards on the next wave of jobs from the School Rebuilding Programme pipeline.<br />
Bowmer &amp; Kirkland dominates the latest release with two of the biggest secondary school jobs, securing &pound;147m of work across Helena Romanes School in Great Dunmow, Essex and Smithdon High School in]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dfe-unleashes-243m-school-rebuild-wave-for-main-works/</link><pubDate>Mon, 20 Apr 2026 08:56:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dfe-unleashes-243m-school-rebuild-wave-for-main-works/</guid></item><item><title><![CDATA[Green light for £17m Huddersfield historic market revamp]]></title><description><![CDATA[Kirklees Council has signed off a major overhaul of Huddersfield&rsquo;s historic Victorian market, paving the way for Willmott Dixon to start work later this year.<br />
The approved scheme will refurbish the Grade II* listed hall and surrounding site while reshaping stall provision in the town.<br />
Under the new plans, the refurbished indoor market will provide more than 87 pitches, including 12 permanent stalls with built-in services and over 75 larger demountable units designed to give traders more sp]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-17m-huddersfield-historic-market-revamp/</link><pubDate>Mon, 20 Apr 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-17m-huddersfield-historic-market-revamp/</guid></item><item><title><![CDATA[O’Connell Contracting lands major Kent demolition job]]></title><description><![CDATA[Demolition work has started on a shopping centre in Kent as the local council continues its search for a development partner for a new &pound;144m mixed use scheme.<br />
O&rsquo;Connell Contracting has been appointed by Ashford Borough Council for the demolition and enabling works at Park Mall in the town centre.<br />
Works will last up to 12 months to bring down the shopping centre and two multi-storey car parks and make the site ready for the next phase.An O&rsquo;Connell spokesperson said: &ldquo;We ar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/oconnell-contracting-lands-major-kent-demolition-job/</link><pubDate>Mon, 20 Apr 2026 08:29:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/oconnell-contracting-lands-major-kent-demolition-job/</guid></item><item><title><![CDATA[Teenage builder crushed by concrete pipe]]></title><description><![CDATA[A teenager suffered life threatening injuries when he was crushed by a concrete pipe which fell on him at a new housing development under construction in Durham.<br />
The 17-year-old was injured at the 368-homes Sniperley Park DH1 homes development on Thursday afternoon.<br />
The force said his head and neck injuries were &ldquo;life-threatening&rdquo; and he had been taken to the Royal Victoria Infirmary in Newcastle.The Bellway Homes site is currently at the groundworks stage with Esh Group carrying out]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/teenage-builder-crushed-by-concrete-pipe/</link><pubDate>Sun, 19 Apr 2026 15:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/teenage-builder-crushed-by-concrete-pipe/</guid></item><item><title><![CDATA[Keller hires former Aarsleff boss to run foundations arm]]></title><description><![CDATA[Keller UK has appointed former Aarsleff specialist Andy Waghorn as branch director of its foundations business.<br />
Waghorn joins the geotechnical giant&rsquo;s piling and ground improvement operation with more than 25 years of experience across the UK, Ireland and Australia.<br />
He arrives from Aarsleff, where he most recently worked as ground engineering director for over four years.He brings heavyweight sector credentials having previously served as piling operations director at J Murphy &amp; Sons f]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keller-hires-former-aarsleff-boss-to-run-foundations-arm/</link><pubDate>Fri, 17 Apr 2026 09:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keller-hires-former-aarsleff-boss-to-run-foundations-arm/</guid></item><item><title><![CDATA[Worker crushed by one tonne concrete block]]></title><description><![CDATA[A Worcestershire firm has been fined after one of its workers was crushed under a one-tonne concrete block.<br />
The father -of-two, 35, had been working for Redditch-based BA Mobile Fleet Services Limited when the incident happened on 14 December 2023.<br />
His leg injuries were so severe his &nbsp;left foot and lower leg subsequently had to be amputated, while he sustained serious injuries to his right leg. The man was also dismissed from his job after the incident.The then 33-year-old had been inside a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-crushed-by-one-tonne-concrete-block/</link><pubDate>Fri, 17 Apr 2026 09:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-crushed-by-one-tonne-concrete-block/</guid></item><item><title><![CDATA[Plans in for Hull 850-home East Bank docklands revival]]></title><description><![CDATA[Hull City Council has advanced ambitious plans for an 850-home urban village on long-neglected riverside land opposite the Old Town.<br />
The scheme, being brought forward with development partner ECF &ndash; a joint venture between Homes England and Legal &amp; General &ndash; will transform brownfield land opposite the Old Town into a mixed-use neighbourhood over the next 15 years.A hybrid planning application has been submitted for East Bank Urban Village.<br />
The detailed application for phase one wi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-hull-850-home-east-bank-docklands-revival/</link><pubDate>Fri, 17 Apr 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-hull-850-home-east-bank-docklands-revival/</guid></item><item><title><![CDATA[Graham lands University of Bath 960-bed campus job]]></title><description><![CDATA[Graham has been appointed to help drive forward a major 960-bed student accommodation scheme at the University of Bath&rsquo;s Claverton Down campus.<br />
The contractor will work with the university under a two-stage pre-construction services agreement secured through the Southern Construction Framework, putting it in the frame for the main build once design work is finalised.<br />
The planned purpose-built student accommodation project will rise on the eastern edge of the campus and is aimed at increasi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-lands-university-of-bath-960-bed-campus-job/</link><pubDate>Fri, 17 Apr 2026 08:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-lands-university-of-bath-960-bed-campus-job/</guid></item><item><title><![CDATA[Kier lands £70m Sizewell C gateway civils job]]></title><description><![CDATA[Kier has landed a significant enabling works package at Sizewell C to build the main entrance zone into the giant Suffolk nuclear project ahead of full-scale construction.<br />
The contractor will start work in June on the North Plaza, a 15-hectare gateway east of Abbey Road in Leiston that will handle worker access, deliveries and security screening for the &pound;38bn power station job.<br />
The plaza will act as the main entry point into the Temporary Construction Area, with new roads linking in buses,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-70m-sizewell-c-gateway-civils-job/</link><pubDate>Thu, 16 Apr 2026 15:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-70m-sizewell-c-gateway-civils-job/</guid></item><item><title><![CDATA[GMI seals £40m deal for Tiger Developments]]></title><description><![CDATA[GMI Construction Group has been appointed as principal contractor by Tiger Developments for a &pound;40m purpose-built student accommodation (PBSA) scheme in Ardwick, Manchester.<br />
The Carmoor Road development will provide 172 student bedrooms in a mix of studio and cluster apartments, located within walking distance of the University of Manchester and the wider Oxford Road Corridor.<br />
Once completed,&nbsp; it will be operated by Host Student Housing &ndash; Tiger Developments&rsquo; student accommo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gmi-seals-40m-deal-for-tiger-developments/</link><pubDate>Thu, 16 Apr 2026 13:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gmi-seals-40m-deal-for-tiger-developments/</guid></item><item><title><![CDATA[GMI lands £40m deal for Tiger Developments]]></title><description><![CDATA[GMI Construction Group has been appointed as principal contractor by Tiger Developments for a &pound;40m purpose-built student accommodation (PBSA) scheme in Ardwick, Manchester.<br />
The Carmoor Road development will provide 172 student bedrooms in a mix of studio and cluster apartments, located within walking distance of the University of Manchester and the wider Oxford Road Corridor.<br />
Once completed,&nbsp; it will be operated by Host Student Housing &ndash; Tiger Developments&rsquo; student accommo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gmi-lands-40m-deal-for-tiger-developments/</link><pubDate>Thu, 16 Apr 2026 13:50:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gmi-lands-40m-deal-for-tiger-developments/</guid></item><item><title><![CDATA[New housing lifts construction output in February]]></title><description><![CDATA[A surprise rebound in private housing work helped drive a 1% rise in construction output in February, offering a small boost for the market.<br />
Latest ONS data shows the monthly increase was powered by a 4.3% jump in private housing new work, making it the biggest contributor to growth.<br />
The uplift also reflected broader gains across the industry, with new work rising 1.0% and repair and maintenance up 0.9% on the month.But the housing-led bounce was not enough to change the direction of travel with]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/new-housing-lifts-construction-output-in-february/</link><pubDate>Thu, 16 Apr 2026 09:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/new-housing-lifts-construction-output-in-february/</guid></item><item><title><![CDATA[Contractors hold bid discipline as public work keeps jobs flowing]]></title><description><![CDATA[Contractors are no longer chasing every job going as a steady flow of government-backed work allows firms to be more selective, according to Gleeds&rsquo; Q1 2026 market survey.<br />
The latest survey of developers and contractors shows that rather than a weak market with firms chasing all opportunities, the contracting sector continues to be selective as appetite for risk reduces amid global uncertainty.<br />
Education remains the standout sector for tender opportunities for a fourth consecutive quarter,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-hold-bid-discipline-as-public-work-keeps-jobs-flowing/</link><pubDate>Thu, 16 Apr 2026 09:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-hold-bid-discipline-as-public-work-keeps-jobs-flowing/</guid></item><item><title><![CDATA[McLaughlin &amp; Harvey seals &pound;45m Dumfries flood job after cost surge]]></title><description><![CDATA[McLaughlin &amp; Harvey has sealed the main works contract for Dumfries&rsquo; Whitesands flood defence scheme after the price jumped nearly &pound;8m from its original estimate.<br />
Dumfries and Galloway Council has agreed a &pound;45.4m deal for the 43-month project, up from the &pound;37.5m value set when the contractor was first lined up through a two-stage procurement route last year.<br />
The 21% increase reflects cost movement between early contractor involvement and final contract agreement, with]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-amp-harvey-seals-pound45m-dumfries-flood-job-after-cost-surge/</link><pubDate>Thu, 16 Apr 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-amp-harvey-seals-pound45m-dumfries-flood-job-after-cost-surge/</guid></item><item><title><![CDATA[Morgan Sindall upgrades 2026 outlook as profits surge]]></title><description><![CDATA[Morgan Sindall has upgraded its 2026 profit outlook after a strong start to the year, with its core construction and fit-out arms driving performance well ahead of expectations.<br />
The group said full-year pre-tax profit will now come in &ldquo;significantly ahead&rdquo; of previous forecasts, boosted by rising activity levels and improved visibility across its order book.<br />
Fit-out is leading the charge, with profits now expected to push beyond the top end of its &pound;80m&ndash;&pound;100m medium-]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-upgrades-2026-outlook-as-profits-surge/</link><pubDate>Thu, 16 Apr 2026 08:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-upgrades-2026-outlook-as-profits-surge/</guid></item><item><title><![CDATA[Coventry airport £2.5bn gigafactory zone cleared for take-off]]></title><description><![CDATA[A &pound;2.5bn plan to turn Coventry Airport into a major battery manufacturing hub has secured a crucial planning boost after councillors waved through detailed proposals for the first phase.<br />
Warwick District Council gave unanimous approval for seven manufacturing buildings at the GreenPower Park site, unlocking 4.8m sq ft of industrial space and moving the flagship scheme firmly towards delivery.<br />
The approved units will range from 69,000 sq ft up to a huge 1.5m sq ft, setting up one of the lar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/coventry-airport-25bn-gigafactory-zone-cleared-for-take-off/</link><pubDate>Thu, 16 Apr 2026 08:05:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/coventry-airport-25bn-gigafactory-zone-cleared-for-take-off/</guid></item><item><title><![CDATA[Lack of site hot water lands contractor in court]]></title><description><![CDATA[A West Midlands construction company has been fined for repeated welfare failures at four different sites across the region.<br />
An HSE&nbsp; inspection at Ling Developments Limited&rsquo;s site at The Crest Telford in April 2024 identified failings including no hot or warm water in the toilets and a lack of suitable rest facilities for workers.<br />
The inspection resulted in two improvement notices being served, requiring the company to take action to comply with the law.On three previous occasions, th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lack-of-site-hot-water-lands-contractor-in-court/</link><pubDate>Wed, 15 Apr 2026 23:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lack-of-site-hot-water-lands-contractor-in-court/</guid></item><item><title><![CDATA[Skanska builds pipeline with 43% order surge to £1.36bn]]></title><description><![CDATA[Skanska UK has ramped up its forward workload with a 43% surge in orders to &pound;1.36bn, setting the business up for a stronger 2026 after a dip in profit last year.<br />
The contractor secured &pound;1.36bn of new work in 2025, up sharply from &pound;958m the previous year, driven by a trio of major wins across building and infrastructure.<br />
These included the &pound;199m Botanic Place office development in Cambridge, a &pound;153m upgrade of the A47 Thickthorn junction for National Highways and a &]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/skanska-builds-pipeline-with-43-order-surge-to-136bn/</link><pubDate>Wed, 15 Apr 2026 18:54:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/skanska-builds-pipeline-with-43-order-surge-to-136bn/</guid></item><item><title><![CDATA[Lindum hands staff £2m windfall from profits]]></title><description><![CDATA[Lincoln-based contractor Lindum handed more than &pound;2m back to staff last year through a combination of profit share and dividends as its employee ownership model paid off.<br />
The family and employee-owned firm distributed close to &pound;1m through its profit-related pay scheme, which allocates 10% of annual profits equally across its 639-strong workforce &mdash; delivering an average bonus of around &pound;1,500 per employee.<br />
On top of that, the founder Chambers family, senior directors and e]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lindum-hands-staff-2m-windfall-from-profits/</link><pubDate>Wed, 15 Apr 2026 08:39:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lindum-hands-staff-2m-windfall-from-profits/</guid></item><item><title><![CDATA[London fit out boom sees profits surge at BW]]></title><description><![CDATA[Strong demand in its core London fit-out market helped BW: Workplace Experts post a 132% increase in pre-tax profit to &pound;13.9m from &pound;6m for the year to 31 December 2025.<br />
Revenue rose by a third to &pound;326.7m from &pound;244m last time as the firm targets &pound;500m turnover by 2030.<br />
BW came into 2026 with over &pound;210 million in secured work for the current period and is on target to achieve &pound;375 million turnover in 2026. &pound;42 million has been secured for 2027 to dat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-fit-out-boom-sees-profits-surge-at-bw/</link><pubDate>Wed, 15 Apr 2026 08:38:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-fit-out-boom-sees-profits-surge-at-bw/</guid></item><item><title><![CDATA[Barratt Redrow shrugs off Middle East turmoil to hold profit forecast]]></title><description><![CDATA[Britain&rsquo;s biggest house builder has held firm on full-year profit forecasts despite rising geopolitical tensions, leaning on a &pound;3.5bn forward sales buffer and a stronger cash reserve to ride out growing market uncertainty.<br />
Barratt Redrow said it remains on track to hit FY26 targets, but warned the real impact of the Middle East conflict is likely to land later this year through higher energy-driven materials costs.<br />
In a third quarter trading update, the house builder said it remains]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-shrugs-off-middle-east-turmoil-to-hold-profit-forecast/</link><pubDate>Wed, 15 Apr 2026 08:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-shrugs-off-middle-east-turmoil-to-hold-profit-forecast/</guid></item><item><title><![CDATA[Robertson bags starring role on £16m Ashington cinema job]]></title><description><![CDATA[Ashington&rsquo;s long-awaited town centre revival is rolling into delivery after Robertson Construction North East secured the &pound;16m deal to build a cinema-led leisure hub at Portland Park.<br />
The project marks a key milestone in the Northumberland town&rsquo;s wider &pound;36m regeneration push, with council bosses banking on the scheme to reboot footfall and kickstart a stronger evening economy.<br />
Plans centre on a five-screen cinema operated by REEL Cinemas, alongside two restaurant units an]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/robertson-bags-starring-role-on-16m-ashington-cinema-job/</link><pubDate>Wed, 15 Apr 2026 08:09:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/robertson-bags-starring-role-on-16m-ashington-cinema-job/</guid></item><item><title><![CDATA[Willmott Dixon lands £61m Merseyside school rebuild]]></title><description><![CDATA[Willmott Dixon has landed a &pound;61m Department for Education deal to rebuild The Mosslands School in Wallasey, adding to its growing schools workload under the current framework.<br />
The project was secured through the DfE Construction Framework High Value Band Lot 1 &amp; 2 and reflects Willmott Dixon&rsquo;s strong track record in education delivery, with &pound;700m secured to date on the current DfE framework.<br />
The 19-acre scheme, designed by Ellis Williams Architects, will deliver a new three]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-lands-61m-merseyside-school-rebuild/</link><pubDate>Tue, 14 Apr 2026 18:03:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-lands-61m-merseyside-school-rebuild/</guid></item><item><title><![CDATA[Vistry agrees deal for next 1,000 homes at Northstowe]]></title><description><![CDATA[Homes England and Vistry have agreed a conditional contract to accelerate the delivery of 1,000 new homes at Northstowe, Cambridgeshire.<br />
The latest phase &ndash; known as 3B-&nbsp; of the new Northstowe community will also include&nbsp;a new local centre, a primary school and supporting infrastructure, including roads, utilities and green space.<br />
A planning application will be made before the end of 2026, with building work expected to begin in 2027, and the first residents moving in from 2028.Al]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-agrees-deal-for-next-1000-homes-at-northstowe/</link><pubDate>Tue, 14 Apr 2026 15:25:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-agrees-deal-for-next-1000-homes-at-northstowe/</guid></item><item><title><![CDATA[Muse installs national ops chief to deliver £6.3bn pipeline]]></title><description><![CDATA[Muse has promoted North West project boss Stuart Rogers into a newly-created national operations director role as the regeneration specialist gears up to convert a swelling &pound;6.3bn pipeline into live delivery.<br />
Rogers joined Muse in April 2022 and has since risen from the North West team to director of project management for the region.He has been closely involved in regeneration schemes in St Helens, Prestwich, Wythenshawe and Oldham, while also helping shape the firm&rsquo;s wider ESG, sus]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/muse-installs-national-ops-chief-to-deliver-63bn-pipeline/</link><pubDate>Tue, 14 Apr 2026 09:14:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/muse-installs-national-ops-chief-to-deliver-63bn-pipeline/</guid></item><item><title><![CDATA[Apex lands £15m Medway Council HQ overhaul job]]></title><description><![CDATA[South East builder Apex Contractor has secured a &pound;15m deal to refurbish Medway Council&rsquo;s Gun Wharf headquarters in Chatham and reopen parts of the troubled building for wider community use.<br />
The project forms the main works package of a wider &pound;22m overhaul of the council&rsquo;s Dock Road base, which has faced disruption since 2023 because of reinforced autoclaved aerated concrete concerns.<br />
The &pound;35m turnover regional contractor&rsquo;s work will include a new council chamb]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/apex-lands-15m-medway-council-hq-overhaul-job/</link><pubDate>Tue, 14 Apr 2026 08:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/apex-lands-15m-medway-council-hq-overhaul-job/</guid></item><item><title><![CDATA[MCS Group lands £22m Walsall warehouse deal]]></title><description><![CDATA[MCS Group has been confirmed as main contractor by Erdgard Developments for its &pound;22m Central Point industrial development at Willenhall Road, Walsall.<br />
The developer has secured detailed planning consent for the scheme which will deliver a total of 93,110 sq ft across six warehouse units.<br />
Site clearance works are now underway to allow MCS Group to start main construction in May on a speculative basis, giving occupiers the ability to occupy units from February 2027.Gareth Williams, Director]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcs-group-lands-22m-walsall-warehouse-deal/</link><pubDate>Tue, 14 Apr 2026 08:43:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcs-group-lands-22m-walsall-warehouse-deal/</guid></item><item><title><![CDATA[East West Rail reset plan to speed up construction]]></title><description><![CDATA[East West Rail has unveiled a major delivery reset to accelerate its &pound;5bn&ndash;&pound;6bn construction programme by switching from a traditional sequential build to parallel delivery across multiple sections.<br />
The move, revealed in its latest consultation, will see key packages of work brought forward and delivered at the same time rather than waiting for earlier phases to complete &ndash; a shift designed to cut programme risk and bring earlier benefits to passengers and developers.<br />
Under]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/east-west-rail-reset-plan-to-speed-up-construction/</link><pubDate>Tue, 14 Apr 2026 08:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/east-west-rail-reset-plan-to-speed-up-construction/</guid></item><item><title><![CDATA[Avove hits 6.9% margin as growth streak continues]]></title><description><![CDATA[Private equity-backed utility contractor Avove has delivered a fourth straight year of growth with profits and margins both climbing as it gears up for a wave of AMP8 work.<br />
The Chorley-based firm that employs over 800 staff posted revenue of &pound;227m for the year to 31 December 2025, up from &pound;216m, while pre-tax profit jumped 29% to &pound;17m.<br />
A focus on tighter cost control and delivery efficiencies lifted operating margin to 6.9% from 5.8% last time.Growth was fuelled by stronger cli]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/avove-hits-69-margin-as-growth-streak-continues/</link><pubDate>Tue, 14 Apr 2026 08:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/avove-hits-69-margin-as-growth-streak-continues/</guid></item><item><title><![CDATA[Willmott Dixon final sign-off on Forest of Dean leisure job]]></title><description><![CDATA[Willmott Dixon has secured final sign-off to deliver the long-delayed Five Acres leisure redevelopment for Forest of Dean District Council, with work set to start on April 27.<br />
The project will transform the Coleford site into a modern leisure and community hub after years of planning, funding delays and redesign.<br />
BAM was originally appointed to deliver the &pound;11m project in 2023 but withdrew after it failed to agree a final price with the local council.The final sign-off price has not been r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-final-sign-off-on-forest-of-dean-leisure-job/</link><pubDate>Tue, 14 Apr 2026 08:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-final-sign-off-on-forest-of-dean-leisure-job/</guid></item><item><title><![CDATA[Network Rail lines up £450m Scotland electrification deal]]></title><description><![CDATA[Network Rail has launched a &pound;450m framework to drive forward rail electrification works across Scotland as part of its wider decarbonisation push.<br />
A single contractor to deliver overhead line electrification, traction power, distribution systems and associated design under a long-term delivery model.<br />
The framework is structured as a nil value NR30 Framework Commission Agreement, with around &pound;300m of works initially identified and a total potential pipeline rising to &pound;450m as fu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/network-rail-lines-up-450m-scotland-electrification-deal/</link><pubDate>Tue, 14 Apr 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/network-rail-lines-up-450m-scotland-electrification-deal/</guid></item><item><title><![CDATA[TCC lands Lichfield green linear park]]></title><description><![CDATA[Birmingham-based The Construction Consultants (TCC) has been appointed to provide project management, quantity surveying and employers agent services to Linear Park &ndash; a new green space to link Lichfield City Station and the city centre.<br />
The development will create an attractive green route, enhancing the walk to and from the station to the city centre, connecting the Garrick Theatre and shops, as well as the planned new cinema and leisure facilities.<br />
Plans include new trees, planting, seat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tcc-lands-lichfield-green-linear-park/</link><pubDate>Mon, 13 Apr 2026 23:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tcc-lands-lichfield-green-linear-park/</guid></item><item><title><![CDATA[Eurotunnel fined £2.25m after surveyor hit by lighting]]></title><description><![CDATA[Eurotunnel has been fined &pound;2.25m after an engineering surveyor was struck by a falling 115kg lighting carriage.<br />
The incident happened on 5 April 2018 at Eurotunnel&rsquo;s UK terminal of the Channel Tunnel, in Folkestone.<br />
The surveyor stood at the bottom of one of the lighting masts with the Eurotunnel maintenance team that was assisting with their inspection.As a lighting carriage was being winched to the top of the mast 18m in the air, the wires holding it failed and the 115kg unit fell,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/eurotunnel-fined-225m-after-surveyor-hit-by-lighting/</link><pubDate>Mon, 13 Apr 2026 14:48:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/eurotunnel-fined-225m-after-surveyor-hit-by-lighting/</guid></item><item><title><![CDATA[McAvoy go-ahead for £65m Bradford hospital overhaul]]></title><description><![CDATA[McAvoy is set to start work on a &pound;65m redevelopment of Lynfield Mount Hospital in Bradford after the scheme secured full business case approval.<br />
The approval unlocks construction on the long-planned mental health upgrade for Bradford District Care NHS Foundation Trust, backed by &pound;50m of government funding.<br />
The project will combine refurbishment of bedrooms on two existing wards to deliver full en-suite provision with a new modular two-storey ward block built by McAvoy.Architect P+HS]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcavoy-go-ahead-for-65m-bradford-hospital-overhaul/</link><pubDate>Mon, 13 Apr 2026 12:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcavoy-go-ahead-for-65m-bradford-hospital-overhaul/</guid></item><item><title><![CDATA[Renaker profit climbs after bumper year of tower completions]]></title><description><![CDATA[Renaker Build lifted turnover and profit last year after completing a bumper run of Manchester and Salford residential jobs, despite warning that tougher regulation and tax barriers are slowing the next wave of scheme starts.<br />
The Manchester tower builder posted turnover of &pound;280m for the year to 31 October 2025, up 5.6% from &pound;265m, while pre-tax profit jumped to &pound;9.7m from &pound;6.3m.<br />
As the business worked through a heavy programme of completions operating margin rose to 3.3%]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/renaker-profit-climbs-after-bumper-year-of-tower-completions/</link><pubDate>Mon, 13 Apr 2026 09:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/renaker-profit-climbs-after-bumper-year-of-tower-completions/</guid></item><item><title><![CDATA[Downing Construction sinks deeper into loss]]></title><description><![CDATA[Downing Construction has slipped further into the red after a sharp drop in workload and rising remediation liabilities linked to legacy projects.<br />
The Liverpool-based contractor posted a pre-tax loss of &pound;8.7m for the year to March 2025, widening from a &pound;5.8m loss the previous year, as turnover fell 38% to &pound;66m.<br />
The downturn reflects a lack of new starts, with activity largely limited to completing existing schemes including the 1,287-bed Square Gardens co-living project in Manc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/downing-construction-sinks-deeper-into-loss/</link><pubDate>Mon, 13 Apr 2026 09:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/downing-construction-sinks-deeper-into-loss/</guid></item><item><title><![CDATA[Bovis swings back to profit after Atlas takeover reset]]></title><description><![CDATA[Bovis Construction (Europe) has bounced back into profit following its breakaway from Lendlease, but the turnaround is largely driven by one-off accounting gains linked to the business reset in the sale.<br />
The contractor posted a &pound;56m pre-tax profit for the nine months to 31 March 2025, reversing a near &pound;14m loss the previous year.<br />
Revenue dropped to &pound;291m from &pound;465m, reflecting both the shorter reporting period and the impact of the carve-out from its former parent.The bus]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bovis-swings-back-to-profit-after-atlas-takeover-reset/</link><pubDate>Mon, 13 Apr 2026 08:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bovis-swings-back-to-profit-after-atlas-takeover-reset/</guid></item><item><title><![CDATA[Rolls Royce signs small nuclear plants contract]]></title><description><![CDATA[Rolls&#8209;Royce SMR has formally signed the contract with Great British Energy &ndash; Nuclear to deliver&nbsp;the UK&rsquo;s first Small Modular Reactors (SMRs).<br />
Rolls-Royce SMR was selected as the preferred technology partner last June and &pound;2.6bn was allocated in the 2025 Spending Review towards the wider programme delivery.<br />
The UK&rsquo;s first SMR project at Wylfa on Anglesey in North Wales will support around 3,000 jobs at peak construction and thousands more across the UK supply ch]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rolls-royce-signs-small-nuclear-plants-contract/</link><pubDate>Mon, 13 Apr 2026 08:44:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rolls-royce-signs-small-nuclear-plants-contract/</guid></item><item><title><![CDATA[Vistry promotes from within to succeed Greg Fitzgerald]]></title><description><![CDATA[House builder Vistry has appointed Adam Daniels as Chief Executive Officer to replace Greg Fitzgerald who announced his retirement last month.<br />
Daniels is currently the Executive Chair of one of Vistry&rsquo;s two largest operating divisions and a member of the Group&rsquo;s Executive Leadership Team.<br />
He joined Countryside Partnerships in 2016, helping to establish new regions and grow the business, taking on his first senior leadership role in 2019.Since then Daniels has undertaken a variety of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-promotes-from-within-to-succeed-greg-fitzgerald/</link><pubDate>Mon, 13 Apr 2026 08:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-promotes-from-within-to-succeed-greg-fitzgerald/</guid></item><item><title><![CDATA[MPB builds £160m pipeline as public sector pivot pays off]]></title><description><![CDATA[MPB Structures has boosted margins and more than doubled its cash pile after pivoting hard into public sector and infrastructure work.<br />
The RC frame and civils specialist posted turnover of &pound;106m for the year to 30 September 2025, down from &pound;116m, reflecting a deliberate move away from private residential and commercial jobs.<br />
Pre-tax profit held steady at &pound;4.1m (2024: &pound;4.3m), with margins improving to 3.9% as the firm focused on longer-duration, lower-risk projects.Cash at]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mpb-builds-160m-pipeline-as-public-sector-pivot-pays-off/</link><pubDate>Mon, 13 Apr 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mpb-builds-160m-pipeline-as-public-sector-pivot-pays-off/</guid></item><item><title><![CDATA[Guildmore hires United Living retrofit chief]]></title><description><![CDATA[Guildmore has hired United Infrastructure&rsquo;s former retrofit lead Ben Whiterod to spearhead its push in the fast-growing decarbonisation market.<br />
Whiterod joins as head of retrofit after nine years at United Infrastructure, where he built experience across major social housing upgrade and energy efficiency programmes.<br />
He brings more than 15 years in construction and social housing and will now lead Guildmore&rsquo;s next phase of retrofit growth as clients grapple with tougher standards, cha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/guildmore-hires-united-living-retrofit-chief/</link><pubDate>Fri, 10 Apr 2026 08:30:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/guildmore-hires-united-living-retrofit-chief/</guid></item><item><title><![CDATA[Government gives £380m grant to Agratas gigafactory]]></title><description><![CDATA[The government is making a &pound;380m grant towards building the &pound;4bn Agratas car battery gigafactory in Somerset where Sir Robert McAlpine is construction manager.<br />
Earl Wiggins, Vice President of Manufacturing Operations, UK for Agratas said: &ldquo;We welcome the UK Government&rsquo;s investment as we build a battery manufacturing facility that will play a vital role in delivering net zero and strengthening the UK&rsquo;s position as a global leader in battery manufacturing.<br />
&ldquo;This]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-gives-380m-grant-to-agratas-gigafactory/</link><pubDate>Fri, 10 Apr 2026 08:17:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-gives-380m-grant-to-agratas-gigafactory/</guid></item><item><title><![CDATA[Mace tops March contracts league after big office win]]></title><description><![CDATA[Mace topped the March contract league rankings on the strength of a single a &pound;450m office scheme on London South Bank.<br />
The Red Lion Court scheme, known as Project Roar, will see 23,200 sq m of office space built across 11 storeys, with two basement levels.<br />
Morgan Sindall came in second place with a dozen project wins totalling am estimated &pound;270m, the largest being the &pound;130m redevelopment of the Crystal Palace Sports Centre in south London.<br />
Shed and multistorey living specialist]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-tops-march-contracts-league-after-big-office-win/</link><pubDate>Fri, 10 Apr 2026 08:02:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-tops-march-contracts-league-after-big-office-win/</guid></item><item><title><![CDATA[Barratt Redrow and PfP team up for 8,500-home garden town]]></title><description><![CDATA[Places for People and Barratt Redrow have teamed up to push forward one of the UK&rsquo;s biggest housing schemes in decades, with plans for an 8,500-home garden town on the outskirts of Gilston in East Hertfordshire.<br />
The joint venture aims to deliver six interlinked villages across a 660-hectare site, combining housing, green infrastructure and community facilities in what partners are billing as a blueprint for future large-scale development.<br />
Around 1,950 of the homes will be affordable, with]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-and-pfp-team-up-for-8500-home-garden-town/</link><pubDate>Fri, 10 Apr 2026 00:06:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-and-pfp-team-up-for-8500-home-garden-town/</guid></item><item><title><![CDATA[Plans go in for first phase of 1.6m sq ft Mix Manchester]]></title><description><![CDATA[A planning application for the 1.6m sq ft phase one of Mix Manchester has been submitted by the joint venture partnership behind the UK&rsquo;s first airport-based science, innovation, and manufacturing campus.<br />
The first phase will include over 70,000 sq ft of flexible mid-tech workspace aimed at pioneering businesses and a 1,500-space multi-storey mobility hub with cycle facilities and ground-floor commercial uses.<br />
The hybrid planning application also includes 500,000 sq ft of medium and large-]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-go-in-for-first-phase-of-16m-sq-ft-mix-manchester/</link><pubDate>Thu, 09 Apr 2026 22:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-go-in-for-first-phase-of-16m-sq-ft-mix-manchester/</guid></item><item><title><![CDATA[RED Systems joins forces with NorDan UK]]></title><description><![CDATA[Commercial glazing, aluminium fa&ccedil;ade and window specialist RED Systems has announced a partnership with NorDan UK &ndash; part of the Norwegian based NorDan Group.<br />
The partnership will combine family owned NorDan&rsquo;s long-standing manufacturing expertise and product performance, with RED Systems&rsquo; proven UK delivery capability.<br />
RED Systems will continue to offer its full range of aluminium commercial projects both on high risk and non-high risk buildings across the UK, and the No]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/red-systems-joins-forces-with-nordan-uk/</link><pubDate>Thu, 09 Apr 2026 22:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/red-systems-joins-forces-with-nordan-uk/</guid></item><item><title><![CDATA[Strabag swoops to buy piling specialist Van Elle for £59m]]></title><description><![CDATA[Austrian contractor Strabag has struck a &pound;58.8m deal to buy ground engineering contractor Van Elle.<br />
Its UK arm, Strabag UK has agreed a recommended cash offer of 52.3p a share, representing a 58.5% premium to aim-listed Van Elle&rsquo;s share price.<br />
The move strengthens Strabag&rsquo;s push to build a vertically integrated construction platform in the UK, adding specialist geotechnical capability across key sectors.<br />
Van Elle is one of the UK&rsquo;s largest geotechnical and ground engineer]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/strabag-swoops-to-buy-piling-specialist-van-elle-for-59m/</link><pubDate>Thu, 09 Apr 2026 08:45:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/strabag-swoops-to-buy-piling-specialist-van-elle-for-59m/</guid></item><item><title><![CDATA[Plans in for 814-home Salford waterfront scheme]]></title><description><![CDATA[Manchester family developer Forshaw Group has lodged updated detailed plans for an 814-flat riverside scheme in Salford.<br />
The Riverside Place development will consist of three brick-clad towers risin from 21 storey to 35 storeys set to reshape a key stretch of the Irwell.<br />
It plans to redevelop a 2.2-acre site on Ordsall Lane and Regent Road &ndash; currently occupied by McDonald&rsquo;s, KFC and Grosvenor Casino &ndash; into a high-density residential quarter backed by Crescent Investments.<br />
Desig]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-814-home-salford-waterfront-scheme/</link><pubDate>Thu, 09 Apr 2026 08:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-in-for-814-home-salford-waterfront-scheme/</guid></item><item><title><![CDATA[Guildmore lands £60m London leisure and flats job]]></title><description><![CDATA[Guildmore has clinched a &pound;60m contract to demolish and rebuild the St George&rsquo;s Leisure Centre in east London, adding an eight-storey block of flats to the scheme.<br />
Tower Hamlets Council selected the London contractor following a competitive flexible procedure, with Morgan Sindall and Chalegrove Properties missing out.<br />
The job will see the existing leisure centre in Shadwell demolished and replaced with a modern facility alongside 29 new homes.<br />
Planned housing block at site<br />
Guildmore w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/guildmore-lands-60m-london-leisure-and-flats-job/</link><pubDate>Thu, 09 Apr 2026 07:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/guildmore-lands-60m-london-leisure-and-flats-job/</guid></item><item><title><![CDATA[Guildmore lands £60m Lodon leisure and flats job]]></title><description><![CDATA[Guildmore has clinched a &pound;60m contract to demolish and rebuild the St George&rsquo;s Leisure Centre in east London, adding an eight-storey block of flats to the scheme.<br />
Tower Hamlets Council selected the London contractor following a competitive flexible procedure, with Morgan Sindall and Chalegrove Properties missing out.<br />
The job will see the existing leisure centre in Shadwell demolished and replaced with a modern facility alongside 29 new homes.<br />
Planned housing block at site<br />
Guildmore w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/guildmore-lands-60m-lodon-leisure-and-flats-job/</link><pubDate>Thu, 09 Apr 2026 07:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/guildmore-lands-60m-lodon-leisure-and-flats-job/</guid></item><item><title><![CDATA[Guildmore in line for £60m London leisure and flats job]]></title><description><![CDATA[Guildmore has been named preferred bidder for a &pound;60m contract to demolish and rebuild the St George&rsquo;s Leisure Centre in east London, adding a nine-storey block of flats to the scheme.<br />
Tower Hamlets Council selected the London contractor as preferred bidder following a competitive flexible procedure, which included Morgan Sindall and Chalegrove Properties also bidding the job.<br />
The job will see the existing leisure centre in Shadwell demolished and replaced with a modern facility along]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/guildmore-in-line-for-60m-london-leisure-and-flats-job/</link><pubDate>Thu, 09 Apr 2026 07:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/guildmore-in-line-for-60m-london-leisure-and-flats-job/</guid></item><item><title><![CDATA[Erith lifts turnover as staff bonus pool tops £6.4m since 2017]]></title><description><![CDATA[Specialist engineering and demolition contractor Erith kept growth on track last year but suffered increased margin pressure.<br />
Turnover climbed 12% to &pound;285m in the year to 30 September 2025 but pre-tax profit slid from &pound;8.4m to &pound;8m in what directors described as an increasingly competitive market against a fluctuating economic backdrop.<br />
Operating margins at the employee-owned group fell back to 2.9% from 3.3% in te prior year.<br />
Despite that squeeze, Erith strengthened its cash po]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/erith-lifts-turnover-as-staff-bonus-pool-tops-64m-since-2017/</link><pubDate>Wed, 08 Apr 2026 23:49:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/erith-lifts-turnover-as-staff-bonus-pool-tops-64m-since-2017/</guid></item><item><title><![CDATA[Red revamps group structure in push for growth]]></title><description><![CDATA[Contractor Red Group is reorganising its business to push for more growth as the firm hits a turnover of &pound;200m.<br />
It will be focusing on four distinct areas &ndash; geography; scale; sector specialism; and supply chain &ndash; under a newly created parent company RedGroup Ltd.Details of the four areas are:Geographical focus: Red South West and the newly created Red London and Red East comprise RED Group&rsquo;s geographical focus.<br />
Large scale contracts: Red Major Projects is an evolution of]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/red-revamps-group-structure-in-push-for-growth/</link><pubDate>Wed, 08 Apr 2026 23:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/red-revamps-group-structure-in-push-for-growth/</guid></item><item><title><![CDATA[Manchester tower deal finally unlocked after four-year stall]]></title><description><![CDATA[A stalled Manchester mid-rise residential scheme is finally set to move after a new public-private funding partnership stepped in to unlock delivery.<br />
The 15-storey Ferrous tower in Piccadilly East &ndash; first approved more than four years ago &ndash; can now push towards site start after being transferred into the &pound;860m Impact&amp;Places Fund backed by Homes England, Swiss Life Asset Managers and Capital&amp;Centric.<br />
The 107-flat scheme off Chapeltown Street becomes the first deal for th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/manchester-tower-deal-finally-unlocked-after-four-year-stall/</link><pubDate>Wed, 08 Apr 2026 19:13:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/manchester-tower-deal-finally-unlocked-after-four-year-stall/</guid></item><item><title><![CDATA[Building safety regulator moves to unblock cladding fix backlog]]></title><description><![CDATA[The Building Safety Regulator has launched a fresh recovery plan to cut long-running delays on higher-risk building cladding remediation schemes.<br />
It includes setting up a new dedicated taskforce, lower caseloads and a promise to get average decision times below 12 weeks by December 2026.<br />
This is still above the statutory milestone of 8 weeks but would be a major improvement on turnaround times for remediation applications.Many contractors and housing providers have been stuck behind slow approva]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/building-safety-regulator-moves-to-unblock-cladding-fix-backlog/</link><pubDate>Wed, 08 Apr 2026 19:12:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/building-safety-regulator-moves-to-unblock-cladding-fix-backlog/</guid></item><item><title><![CDATA[Buyers report construction cost surge]]></title><description><![CDATA[Construction buyers have reported the steepest rise in cost inflation since November 2022.<br />
The increases came as construction output reduced again with residential work falling the fastest.<br />
The bellwether S&amp;P Global UK Construction Purchasing Managers&rsquo; Index rose to 45.6 in March from 44.5 in February but remained below the neutral 50.0 value for the fifteenth month in a row.March data pointed to a renewed downturn in supplier performance. Average lead times among vendors lengthened fo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/buyers-report-construction-cost-surge/</link><pubDate>Wed, 08 Apr 2026 11:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/buyers-report-construction-cost-surge/</guid></item><item><title><![CDATA[VINCI bags landmark £100m Morecambe Eden job]]></title><description><![CDATA[VINCI Building has beaten rival bidder Kier to secure the Eden Project Morecambe, pushing the flagship North West regeneration scheme towards a start on site later this year.<br />
The appointment follows planning approval last month and keeps the &pound;100m visitor attraction on track to open its first phase in early 2027, ahead of full completion in 2028.<br />
VINCI was selected via the North West Construction Hub High Value Framework after emerging as most economically advantageous bidder.The firm now]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vinci-bags-landmark-100m-morecambe-eden-job/</link><pubDate>Wed, 08 Apr 2026 09:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vinci-bags-landmark-100m-morecambe-eden-job/</guid></item><item><title><![CDATA[JP Morgan clears flight path hurdle for Canary Wharf’s tallest tower]]></title><description><![CDATA[JP Morgan Chase has cleared a major planning hurdle for its &pound;3bn Canary Wharf headquarters after reaching agreement with London City Airport over height restrictions, according to the Financial Times.<br />
The US banking giant is now preparing to submit a planning application for a 265m tower at Riverside South that will overtake 8 Canada Square as the tallest building in the Docklands.<br />
The scheme, designed by Foster + Partners, will deliver around 3m sq ft of office space and bring together th]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jp-morgan-clears-flight-path-hurdle-for-canary-wharfs-tallest-tower/</link><pubDate>Wed, 08 Apr 2026 09:16:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jp-morgan-clears-flight-path-hurdle-for-canary-wharfs-tallest-tower/</guid></item><item><title><![CDATA[United Infrastructure exits housing with MBO of homes arm]]></title><description><![CDATA[United Infrastructure has finalised the sale of its New Homes division to management, formally exiting the housing market as it sharpens its focus on core infrastructure work.<br />
The deal sees Andrew McDonough, previously managing director of the multi-family arm, take full ownership of the business through a management buy-out.<br />
Remaining projects and staff across both single-family and multi-family teams will continue unchanged, with the same legal employing entity in place and no impact on terms.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/united-infrastructure-exits-housing-with-mbo-of-homes-arm/</link><pubDate>Wed, 08 Apr 2026 09:01:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/united-infrastructure-exits-housing-with-mbo-of-homes-arm/</guid></item><item><title><![CDATA[£12bn developer framework set for October launch]]></title><description><![CDATA[Procure Partnerships is starting the hunt for developers to join its first &pound;12bn national framework, opening early market engagement ahead of a summer tender launch.<br />
The four-year deal, run by the procurement body with Wirral Council acting as contracting authority, will cover public sector regeneration schemes across England under the Procurement Act 2023.<br />
The framework will mirror the firm&rsquo;s regional delivery model, split across nine English regions, with developers appointed local]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/12bn-developer-framework-set-for-october-launch/</link><pubDate>Wed, 08 Apr 2026 08:48:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/12bn-developer-framework-set-for-october-launch/</guid></item><item><title><![CDATA[HSE targets construction with tougher incident reporting shake-up]]></title><description><![CDATA[The Health and Safety Executive plans a major overhaul of workplace incident reporting with sweeping changes to how site risks, plant incidents and occupational diseases must be reported.<br />
The review of the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 signals a step-change for contractors, who face a significant expansion in what must be logged with the regulator.<br />
At the heart of the planned reform to RIDDOR reporting is a major tightening of dangerous occurrence rul]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hse-targets-construction-with-tougher-incident-reporting-shake-up/</link><pubDate>Wed, 08 Apr 2026 08:46:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hse-targets-construction-with-tougher-incident-reporting-shake-up/</guid></item><item><title><![CDATA[CITB to spend £300,000 on ‘mystery shoppers’]]></title><description><![CDATA[The CITB is advertising a &pound;300,000 contract for mystery shoppers to carry-out surprise checks on testing and training centres.<br />
A notice on the government&rsquo;s Find A Tender service states: &ldquo;CITB operates mystery shops with the core objective of consistently monitoring testing and training centres to provide CITB with assurance that those centres are operating and following the scheme rules for each product and are delivering the standards and customer experience CITB expects.&rdqu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/citb-to-spend-300000-on-mystery-shoppers/</link><pubDate>Tue, 07 Apr 2026 22:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/citb-to-spend-300000-on-mystery-shoppers/</guid></item><item><title><![CDATA[Strabag buys structural steelwork specialist Crofton]]></title><description><![CDATA[European construction giant Strabag has acquired Cambridgeshire based structural steelwork specialist Crofton Engineering Limited.<br />
Crofton has been in business since 1953 and will continue to operate from its existing premises in Linton under the Crofton name and while retaining the senior management team.<br />
Ian Burford , Managing Director (Technical), Strabag UK Build Subdivision said: &ldquo;This acquisition is part of our growth strategy and allows us to leverage our global-local model,&nbsp; c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/strabag-buys-structural-steelwork-specialist-crofton/</link><pubDate>Tue, 07 Apr 2026 11:32:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/strabag-buys-structural-steelwork-specialist-crofton/</guid></item><item><title><![CDATA[HMRC broadens CIS fraud powers beyond direct offenders]]></title><description><![CDATA[Construction firms are being told to urgently tighten subcontractor checks as a major overhaul to Construction Industry Scheme fraud rules takes effect.<br />
The changes that came into force from 6 April mark the biggest shake-up to CIS compliance in two decades and push liability well beyond firms directly involved in wrongdoing.Under the new regime, HM Revenue &amp; Customs can strip businesses of gross payment status and pursue directors personally for tax losses if they &ldquo;knew or should have]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hmrc-broadens-cis-fraud-powers-beyond-direct-offenders/</link><pubDate>Tue, 07 Apr 2026 08:58:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hmrc-broadens-cis-fraud-powers-beyond-direct-offenders/</guid></item><item><title><![CDATA[Berkeley fires up 1,000-home Sutton scheme]]></title><description><![CDATA[Berkeley is pressing ahead with plans to deliver more than 1,000 homes in Sutton after setting out its vision for the Sutton Garden Square regeneration scheme.<br />
The project will transform a 5.6-acre brownfield site, once a chalk quarry and more recently home to a B&amp;Q store and car park, into a mid-rise mixed-use neighbourhood of eight residential buildings ranging from six to 21 storeys.<br />
Alongside the homes will be more than 8,500 sq ft of commercial space and 1.1 acres of publicly accessible]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/berkeley-fires-up-1000-home-sutton-scheme/</link><pubDate>Tue, 07 Apr 2026 08:57:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/berkeley-fires-up-1000-home-sutton-scheme/</guid></item><item><title><![CDATA[Race starts for £30m mega container store at London Gateway]]></title><description><![CDATA[Contractors are lining up for a &pound;30m high-tech container storage shed project at London Gateway.<br />
London Gateway Port has invited bids to deliver its gound-breaking 12-storey automated empty container stacking facility at the Thurrock terminal.<br />
The BOXBAY scheme will see the shed structure rise to around 55m, stretching 323m long and 159m wide across the existing MT Park area.<br />
The job combines heavy civils, deep foundations and a major structural steel package, with more than 15,000 tonnes]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/race-starts-for-30m-mega-container-store-at-london-gateway/</link><pubDate>Tue, 07 Apr 2026 08:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/race-starts-for-30m-mega-container-store-at-london-gateway/</guid></item><item><title><![CDATA[Morgan Sindall bags £29m West London school block job]]></title><description><![CDATA[Morgan Sindall has been appointed to deliver a &pound;29m redevelopment at Villiers High School in Southall, West London centred on a new three-storey eco teaching block.<br />
The job for Ealing Council, procured via the Southern Construction framework, will replace an outdated 1960s building with a modern energy-efficient facility to expand capacity and improve teaching space.<br />
The scheme includes 22 classrooms, 11 science labs, six ICT suites, staff areas and a rooftop sky garden.<br />
Sustainability fea]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-bags-29m-west-london-school-block-job/</link><pubDate>Tue, 07 Apr 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-bags-29m-west-london-school-block-job/</guid></item><item><title><![CDATA[Bristol £350m Temple Island scheme approved]]></title><description><![CDATA[Bristol City Council has waved through Legal &amp; General&rsquo;s &pound;350m Temple Island regeneration scheme, clearing the way for one of the city&rsquo;s biggest brownfield sites to move towards delivery.<br />
Councillors approved the hybrid application for the long-derelict former diesel depot site beside Bristol Temple Meads, marking a major step forward for the former proposed arena site in the city.<br />
The Zaha Hadid Architects-designed masterplan will bring forward up to 520 homes, two office]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bristol-350m-temple-island-scheme-approved/</link><pubDate>Tue, 07 Apr 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bristol-350m-temple-island-scheme-approved/</guid></item><item><title><![CDATA[Severn Trent plots £1.2bn tunnelling mega framework]]></title><description><![CDATA[Water utility Severn Trent Water has launched the bid race for &pound;1.2bn framework covering specialist tunnelling, drilling and shaft works across its network.<br />
The long-term deal, also covering its Welsh business Hafren Dyfrdwy, will run for an initial 12 years from September 2026 with options to extend out to 2041.<br />
Contractors are now lining up for places on the framework, which will underpin delivery of major underground pipeline and infrastructure upgrades across England and Wales.The proc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/severn-trent-plots-12bn-tunnelling-mega-framework/</link><pubDate>Tue, 07 Apr 2026 08:36:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/severn-trent-plots-12bn-tunnelling-mega-framework/</guid></item><item><title><![CDATA[Labourer fractures skull in stairwell fall]]></title><description><![CDATA[A Staffordshire contractor and its director have been sentenced after a worker sustained serious injuries when he fell through a stairwell opening during construction of an apartment block in Staffordshire.<br />
The injured worker, who was 26 at the time of the incident, had been appointed by BHG (Stone) Limited, the principal contractor, as a labourer. On 5 December 2023, he was assisting with the installation of wall insulation on the first floor of the building.<br />
To reach the top corner of the wall]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/labourer-fractures-skull-in-stairwell-fall/</link><pubDate>Mon, 06 Apr 2026 21:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/labourer-fractures-skull-in-stairwell-fall/</guid></item><item><title><![CDATA[Graham set for £284m London Met Uni revamp]]></title><description><![CDATA[Contractor Graham is set to be confirmed as strategic delivery partner on London Metropolitan University&rsquo;s &pound;284m estate overhaul after emerging as the sole bidder on the long-running procurement.<br />
The contractor will take on a wide-ranging role spanning capital works delivery and total facilities management across the university&rsquo;s London campuses under a deal running to 2031, with an option to extend to 2036.<br />
Under the deal, Graham will lead new build and refurbishment schemes,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-set-for-284m-london-met-uni-revamp/</link><pubDate>Thu, 02 Apr 2026 08:55:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-set-for-284m-london-met-uni-revamp/</guid></item><item><title><![CDATA[Speedy flags-up hire delays as market weakens]]></title><description><![CDATA[Hire giant Speedy said customers are delaying kit deals due to market uncertainty.<br />
In a trading update today the firm said: &ldquo;At our interim results on 26 November 2025 we anticipated a continuation of subdued market conditions for the remainder of FY2026.<br />
&ldquo;Market conditions have worsened through Q4 with uncertainty around the UK Budget in November and the recent geopolitical events in the Middle East. The Group has also seen certain customer led delays, affecting hire and service rev]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/speedy-flags-up-hire-delays-as-market-weakens/</link><pubDate>Thu, 02 Apr 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/speedy-flags-up-hire-delays-as-market-weakens/</guid></item><item><title><![CDATA[Ardmore to appeal landmark £15m Building Safety Act ruling]]></title><description><![CDATA[Ardmore is gearing up to appeal a landmark High Court decision that drags multiple group companies into a &pound;14.9m fire safety defects bill after its main contracting arm collapsed into administration.<br />
The ruling in Crest Nicholson v Ardmore marks a major escalation in how the Building Safety Act 2022 can be used to pursue liabilities across corporate structures, with the court making clear that group companies can be forced to stand behind historic defects.<br />
With Ardmore preparing an appeal,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-to-appeal-landmark-15m-building-safety-act-ruling/</link><pubDate>Thu, 02 Apr 2026 08:28:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-to-appeal-landmark-15m-building-safety-act-ruling/</guid></item><item><title><![CDATA[Race begins for £142m Bank of England refurbishment job]]></title><description><![CDATA[The Bank of England has kicked off the hunt for a main contractor to deliver a &pound;142m overhaul of its historic Threadneedle Street estate in the City of London.<br />
The job forms the core of the Bank&rsquo;s wider Location Strategy project and will see a major consolidation and refurbishment programme rolled out across the secure and heritage-sensitive site in a live working environment.<br />
Contractors are being lined up for a phased delivery approach covering everything from enabling works throug]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/race-begins-for-142m-bank-of-england-refurbishment-job/</link><pubDate>Thu, 02 Apr 2026 08:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/race-begins-for-142m-bank-of-england-refurbishment-job/</guid></item><item><title><![CDATA[Fraud gang sentenced for fixing safety tests for CSCS cards]]></title><description><![CDATA[Three men have been sentenced after a Met Police investigation uncovered a construction test fraud racket that helped more than 70 people cheat health and safety exams using Bluetooth earpieces.<br />
The year-long scam saw candidates fed answers through a concealed bluetooth earpiece during online CITB tests needed to secure CSCS cards and gain access to construction sites.<br />
Detectives said the gang charged candidates up to &pound;850 each to cheat the exam, generating more than &pound;60,000 over sev]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fraud-gang-sentenced-for-fixing-safety-tests-for-cscs-cards/</link><pubDate>Wed, 01 Apr 2026 12:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fraud-gang-sentenced-for-fixing-safety-tests-for-cscs-cards/</guid></item><item><title><![CDATA[Fraud gang sentenced for fixing CSCS safety tests]]></title><description><![CDATA[Three men have been sentenced after a Met Police investigation uncovered a construction test fraud racket that helped more than 70 people cheat health and safety exams using Bluetooth earpieces.<br />
The year-long scam saw candidates fed answers through a concealed bluetooth earpiece during online CITB tests needed to secure CSCS cards and gain access to construction sites.<br />
Detectives said the gang charged candidates up to &pound;850 each to cheat the exam, generating more than &pound;60,000 over sev]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fraud-gang-sentenced-for-fixing-cscs-safety-tests/</link><pubDate>Wed, 01 Apr 2026 12:52:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fraud-gang-sentenced-for-fixing-cscs-safety-tests/</guid></item><item><title><![CDATA[Reds10 shake-up puts founder in new group CEO seat]]></title><description><![CDATA[MMC specialist Reds10 has promoted Ryan Geldard to chief executive as the offsite specialist restructures into a new group aimed at accelerating its push to industrialise construction.<br />
Founder Paul Ruddick becomes chief executive of the new Reds10 Group, overseeing nine businesses across the vertically integrated operation while remaining chairman of Reds10.<br />
Ryan Geldard, new chief executive of Reds10<br />
Geldard, previously managing director &ndash; offsite, takes day-to-day control as the firm tar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/reds10-shake-up-puts-founder-in-new-group-ceo-seat/</link><pubDate>Wed, 01 Apr 2026 11:41:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/reds10-shake-up-puts-founder-in-new-group-ceo-seat/</guid></item><item><title><![CDATA[Berkeley slams brakes on land buying as market headwinds bite]]></title><description><![CDATA[House builder Berkeley has pulled back from new land deals and will instead sweat its existing 50,000-home pipeline as market conditions continue to weigh on London housing delivery.<br />
The firm said it will largely stop buying land, warning it cannot hit required returns amid rising tax, regulation and soft sales.<br />
Instead, the developer will double down on extracting value from its existing sites and tightly control construction activity in line with demand and regulatory delays.The move comes des]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite/</link><pubDate>Wed, 01 Apr 2026 09:20:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/berkeley-slams-brakes-on-land-buying-as-market-headwinds-bite/</guid></item><item><title><![CDATA[Billington lands £50m project haul as order book backs 2026 target]]></title><description><![CDATA[Structural steel specialist Billington has bagged around &pound;50m of new work across carbon capture, schools, bridges, rail, semiconductors and data centres.<br />
The latest haul of half a dozen jobs includes a carbon capture facility on Teesside, Wales High School in Sheffield, Tubecon&rsquo;s biggest bridge job to date in Cambridgeshire, the National Railway Museum and a silicon chip manufacturing facility in Bristol.<br />
Billington has also secured a London data centre scheme for an existing client]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/billington-lands-50m-project-haul-as-order-book-backs-2026-target/</link><pubDate>Wed, 01 Apr 2026 09:08:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/billington-lands-50m-project-haul-as-order-book-backs-2026-target/</guid></item><item><title><![CDATA[Pay caps scrapped in mega schemes reset to lure top talent]]></title><description><![CDATA[Ministers are ripping up how the UK&rsquo;s biggest infrastructure schemes are run slashing the official project list by more than half and raising pay ceilings to lure in top project talent.<br />
The Government Major Projects Portfolio has been trimmed from around 200 schemes to about 80, in a move designed to sharpen focus on the most critical programmes and improve oversight.<br />
The reset also confirms a shift in control to the National Infrastructure and Service Transformation Authority, which repla]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pay-caps-scrapped-in-mega-schemes-reset-to-lure-top-talent/</link><pubDate>Wed, 01 Apr 2026 08:31:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pay-caps-scrapped-in-mega-schemes-reset-to-lure-top-talent/</guid></item><item><title><![CDATA[Torsion eyes £200m turnover despite slowdown threat]]></title><description><![CDATA[Leeds-based Torsion Construction drove turnover ahead 41% to &pound;165m last year on the back of student and build to rent jobs.<br />
Accounts for the year to 30 June 2025 reveal that while pre-tax profit doubled to &pound;814,000 from &pound;404,000, margins remained tight at just 0.7% underlining the pressure still facing contractors even as workloads rise.<br />
Torsion said its model of working closely with sister business Torsion Developments at conception, planning and pre-construction stage had hel]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/torsion-eyes-200m-turnover-despite-slowdown-threat/</link><pubDate>Wed, 01 Apr 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/torsion-eyes-200m-turnover-despite-slowdown-threat/</guid></item><item><title><![CDATA[NG Bailey buys ESG to tap £100bn water investment wave]]></title><description><![CDATA[M&amp;E contractor NG Bailey has snapped up specialist engineering group ESG to deepen its infrastructure offer and push further into the fast-growing water sector.<br />
The Leeds-based firm said the deal strengthens delivery capability across water, environmental and wider infrastructure markets as AMP8 spending ramps up.<br />
The five-year cycle is worth around &pound;100bn, roughly double the previous round, and is expected to drive a surge in upgrade and resilience work.Sutton-in-Ashfield-based ESG tu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ng-bailey-buys-esg-to-tap-100bn-water-investment-wave/</link><pubDate>Wed, 01 Apr 2026 08:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ng-bailey-buys-esg-to-tap-100bn-water-investment-wave/</guid></item><item><title><![CDATA[Mace lines up data centre push with senior switch]]></title><description><![CDATA[Mace Construct has reworked its operational leadership team as it sharpens focus on data centres and London fit-out work following its carveout from Mace Consult.<br />
The contractor is creating a new director of technology role, with Paul Connolly stepping up from head of construction technical services to lead its growing data centre division.<br />
He will report to Rob Lemming, who leads the Public, Science and Technology business unit, and take charge of one of the firm&rsquo;s fastest-expanding secto]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-lines-up-data-centre-push-with-senior-switch/</link><pubDate>Wed, 01 Apr 2026 08:18:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-lines-up-data-centre-push-with-senior-switch/</guid></item><item><title><![CDATA[Work stopped on £44m Lindum site after council blunder]]></title><description><![CDATA[Work has been stopped on a &pound;44m Lindum job in Nottinghamshire after the local council broke its own procurement rules.<br />
Ashfield District Council said internal checks identified governance issues within the Automated Distribution and Manufacturing Centre (ADMC) project.<br />
Lindum started on the site as main contractor last Summer and the council has now confirmed works were paused in January.After council officials raised concerns an independent review confirmed that some elements of the proje]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/work-stopped-on-44m-lindum-site-after-council-blunder/</link><pubDate>Wed, 01 Apr 2026 00:19:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/work-stopped-on-44m-lindum-site-after-council-blunder/</guid></item><item><title><![CDATA[Bryson lands Laing O’Rourke PPE deal]]></title><description><![CDATA[Bryson has been awarded a contract to supply personal protective equipment (PPE) and essential site consumables to Laing O&rsquo;Rourke.<br />
Bryson was chosen due to its simple &ldquo;smarter, faster, greener&rdquo; ordering process with its greener reporting portal for transparent carbon emissions tracking a key differential.<br />
Rodney Fear, Bryson Business Development Director said:&nbsp;&ldquo;We&rsquo;re excited to partner with Laing O&rsquo;Rourke as one of&nbsp; their preferred PPE and Site Consu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bryson-lands-laing-orourke-ppe-deal/</link><pubDate>Tue, 31 Mar 2026 22:22:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bryson-lands-laing-orourke-ppe-deal/</guid></item><item><title><![CDATA[£16bn housing bank launches to unlock stalled schemes]]></title><description><![CDATA[Homes England has fired the starting gun on its new National Housing Bank, aiming to pump up to &pound;16bn into housing and regeneration schemes and unlock projects stuck by viability and funding gaps.<br />
The government-backed lender opens for business this week with a clear brief: de-risk developments, crowd in private capital and accelerate delivery across England&rsquo;s clogged housing pipeline.<br />
A first &pound;100m deal with insurer Aviva will fund thousands of build-to-rent homes, including a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/16bn-housing-bank-launches-to-unlock-stalled-schemes/</link><pubDate>Tue, 31 Mar 2026 13:59:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/16bn-housing-bank-launches-to-unlock-stalled-schemes/</guid></item><item><title><![CDATA[US investor behind Bovis circles listed brick giant]]></title><description><![CDATA[Bovis owner Atlas has been knocked back in an early takeover move for bricks and materials giant Brickability after pitching a cut-price 65p-a-share cash offer.<br />
The US private equity firm made its approach earlier this year before returning in March with a formal indicative proposal for the AIM-listed supplier, now branded BRCK.<br />
But Brickability&rsquo;s board moved quickly to reject the bid, saying it &ldquo;fundamentally undervalued&rdquo; the business.The firm had opened the door to talks and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/us-investor-behind-bovis-circles-listed-brick-giant/</link><pubDate>Tue, 31 Mar 2026 09:10:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/us-investor-behind-bovis-circles-listed-brick-giant/</guid></item><item><title><![CDATA[Severfield hit by margin squeeze as job delays impact]]></title><description><![CDATA[Severfield has kept full-year profit on track but warned margins are under growing pressure as delayed project starts force the group to rely on lower-value work.<br />
The structural steel giant said underlying pre-tax profit for the year to 28 March 2026 will hit market expectations at around &pound;10.2m.<br />
But behind the steady headline number, profitability is being squeezed by major project delays.A &pound;438m UK and Europe order book continues to provide the steelwork contractor with visibility.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/severfield-hit-by-margin-squeeze-as-job-delays-impact/</link><pubDate>Tue, 31 Mar 2026 08:53:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/severfield-hit-by-margin-squeeze-as-job-delays-impact/</guid></item><item><title><![CDATA[Tishman Speyer to refurb Pall Mall office block]]></title><description><![CDATA[Developer Tishman Speyer is planning a major refurbishment of 50 Pall Mall in central London after acquiring the existing office block.<br />
Originally constructed in 1913, 50 Pall Mall was redeveloped in 1997 while retaining its carved Portland stone fac&#807;ade. It was later refurbished to a Grade A standard in 2006.<br />
The current building contains 33,888 sq ft of office space across nine floors.Tishman Speyer plans to modernise the building, including upgrading its ESG credentials and enhancing ame]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tishman-speyer-to-refurb-pall-mall-office-block/</link><pubDate>Tue, 31 Mar 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tishman-speyer-to-refurb-pall-mall-office-block/</guid></item><item><title><![CDATA[Middle East crisis fuels fresh construction cost surge]]></title><description><![CDATA[Escalating tensions in the Middle East are now feeding directly into construction costs, with surging fuel and energy prices seen as the biggest threat to already fragile project margins.<br />
A joint alert from the Builders Merchants Federation and Construction Products Association reveals the conflict is driving a sharp rise in transport and production costs across the supply chain.<br />
Merchants, house builders and contractors say surcharges are already landing with little warning and limited justific]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/middle-east-crisis-fuels-fresh-construction-cost-surge/</link><pubDate>Tue, 31 Mar 2026 01:07:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/middle-east-crisis-fuels-fresh-construction-cost-surge/</guid></item><item><title><![CDATA[Metrocentre owner signs up for 4,500-home Tyne riverside revival]]></title><description><![CDATA[Metrocentre has struck a landmark agreement with Gateshead Council to deliver a massive brownfield regeneration plan&nbsp;to build more than 4,500 homes along the south bank of the River Tyne.<br />
The Metro Riverside project will transform under-used land around the shopping centre into a mixed-use, carbon-neutral district designed as a &ldquo;city within a city&rdquo;, with Metrocentre repositioned at its core.Plans centre on compact, walkable neighbourhoods supported by upgraded transport links an]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/metrocentre-owner-signs-up-for-4500-home-tyne-riverside-revival/</link><pubDate>Mon, 30 Mar 2026 19:26:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/metrocentre-owner-signs-up-for-4500-home-tyne-riverside-revival/</guid></item><item><title><![CDATA[Canary Wharf Group lines up another major office retrofit]]></title><description><![CDATA[Canary Wharf Group is preparing to launch the contest for another major office block retrofit on its Dockland estate next to the Eden Dock.<br />
The Norman Foster designed offices formerly known as 33 Canada Square has secured consent for a major 545,000 sq ft upgrade.<br />
Reworked by architect T P Bennett, the renamed 17-storey One Eden project will advance once the developer has secured a prelet for the space.As well as creating new groundfloor retail space there is an option for a rooftop destination]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/canary-wharf-group-lines-up-another-major-office-retrofit/</link><pubDate>Mon, 30 Mar 2026 16:33:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/canary-wharf-group-lines-up-another-major-office-retrofit/</guid></item><item><title><![CDATA[Multiplex revenue nears £1bn but margins squeezed]]></title><description><![CDATA[Multiplex Construction Europe took a hit on profit last year as it pivoted into a new cycle of major London schemes, with a &pound;3.4bn forward book now set to drive the next phase of growth.<br />
Turnover jumped 25% to &pound;973m in 2025 as newly-secured work moved into delivery, but pre-tax profit halved to &pound;9.8m as higher-margin legacy projects dropped out of the mix.<br />
Operation margin fell to 2.0% from 3.5%, reflecting a business now weighted towards early-stage jobs yet to reach peak prof]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/multiplex-revenue-nears-1bn-but-margins-squeezed/</link><pubDate>Mon, 30 Mar 2026 09:11:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/multiplex-revenue-nears-1bn-but-margins-squeezed/</guid></item><item><title><![CDATA[HBC targets £120m turnover after profit recovery year]]></title><description><![CDATA[HBC Construction, previously known as Henry Boot Construction, is predicting its revenue will surge to &pound;120m this year after returning to profit in 2025.<br />
The Sheffield contractor posted turnover of &pound;71m for 2025, up from &pound;50m the year before, while pre-tax profit swung to &pound;1.24m from a &pound;1.65m loss.<br />
Henry Boot sold its contracting arm to its management last year to concentrate on house building and land and property development.HBC issued the update after figures pub]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hbc-targets-120m-turnover-after-profit-recovery-year/</link><pubDate>Mon, 30 Mar 2026 08:42:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hbc-targets-120m-turnover-after-profit-recovery-year/</guid></item><item><title><![CDATA[Cladding claims see major insurer pull plug on architect PI cover]]></title><description><![CDATA[Architects, developers and contractors are bracing for a fresh professional indemnity squeeze after Wren Insurance Association Limited, which provides professional indemnity insurance to architects, confirmed it will stop underwriting and withdraw from the market.<br />
The mutual will not offer renewal terms from 1 July 2026 and will instead wind down through a solvent exit, continuing to meet existing claims but writing no new business.<br />
Its departure removes one of the last insurers willing to provi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cladding-claims-see-major-insurer-pull-plug-on-architect-pi-cover/</link><pubDate>Mon, 30 Mar 2026 08:21:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cladding-claims-see-major-insurer-pull-plug-on-architect-pi-cover/</guid></item><item><title><![CDATA[£165m earmarked for roads to unlock stalled housing sites]]></title><description><![CDATA[Details of a new infrastructure fund to unlock stalled housing and development sites have been confirmed by the government.<br />
The Growth and Housing Accelerator Fund will target sites where progress has stalled due to lack of transport infrastructure cash.<br />
It forms part of Road Investment Strategy 3 (RIS3) and will launch with a &pound;165m investment.The fund will focus on locations on or near to motorways and A-roads across England.<br />
Secretary of State Heidi Alexander said: &ldquo;Too many housin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/165m-earmarked-for-roads-to-unlock-stalled-housing-sites/</link><pubDate>Mon, 30 Mar 2026 08:15:00 +0200</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/165m-earmarked-for-roads-to-unlock-stalled-housing-sites/</guid></item><item><title><![CDATA[Builders merchant fined £2.2m after labourer crushed to death]]></title><description><![CDATA[One of the country&rsquo;s largest builders merchants has been fined more than &pound;2m after one of its workers was crushed to death by a pallet of timber that weighed around three tonnes.<br />
Paul Coulson, 56, died after a colleague started a conveyor not realising he had climbed inside it.<br />
The incident happened on 22 May 2024 at Herringswell Sawmills, a site in Bury St Edmonds in Suffolk operated by Huws Gray Limited. Coulson, a labourer, had been tasked with removing plastic packaging from pall]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/builders-merchant-fined-22m-after-labourer-crushed-to-death/</link><pubDate>Fri, 27 Mar 2026 15:09:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/builders-merchant-fined-22m-after-labourer-crushed-to-death/</guid></item><item><title><![CDATA[All change at the top of Pagabo]]></title><description><![CDATA[Pagabo Group has announced a series of changes in its executive leadership, including the appointment of Amman Boughan as group CEO &ndash; taking over the role from co-founder Simon Toplass.<br />
Toplass will step into an executive founder role for the group, while Jason Stapley &ndash; Pagabo&rsquo;s other founding member &ndash; will continue in a chief procurement officer role for the procurement business.<br />
The move will see both refocus their efforts on new strategic growth opportunities, nurturi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/all-change-at-the-top-of-pagabo/</link><pubDate>Fri, 27 Mar 2026 14:56:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/all-change-at-the-top-of-pagabo/</guid></item><item><title><![CDATA[Go ahead for revised Canada Water Masterplan]]></title><description><![CDATA[A revised version of the Canada Water Masterplan has been approved by the Deputy Mayor of London.<br />
Changes by developers&nbsp;British Land and AustralianSuper will see an increase in height and massing of the residential buildings &ldquo;in response to major regulatory changes and sector-wide cost and viability challenges.&rdquo;<br />
Levels of affordable housing have also chenged to 20% in the next phase and a minimum 9% across the whole site.The decision will allow&nbsp;the next phase of development]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-revised-canada-water-masterplan-2/</link><pubDate>Fri, 27 Mar 2026 14:43:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-revised-canada-water-masterplan-2/</guid></item><item><title><![CDATA[Go ahead for revised Canada Water Masterplan.]]></title><description><![CDATA[A revised version of the Canada Water Masterplan has been approved by the Deputy Mayor of London.<br />
Changes by developers&nbsp;British Land and AustralianSuper will see an increase in height and massing of the residential buildings &ldquo;in response to major regulatory changes and sector-wide cost and viability challenges.&rdquo;<br />
Levels of affordable housing have also chenged to 20% in the next phase and a minimum 9% across the whole site.The decision will allow&nbsp;the next phase of development]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-revised-canada-water-masterplan/</link><pubDate>Fri, 27 Mar 2026 14:43:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-revised-canada-water-masterplan/</guid></item><item><title><![CDATA[Miller Homes targets 7,000 homes after record results surge]]></title><description><![CDATA[Private house builder Miller Homes has posted record full-year results after the St Modwen Homes takeover helped drive completions close to the 5,000 mark and lifted revenue past &pound;1.4bn.<br />
The house builder, owned by US investor Apollo, turned in a sharp jump in 2025 trading, with pre-tax profit climbing 75% to &pound;124m as turnover jumped by just over a third to &pound;1.43bn.<br />
Completions increased 29% to 4,931 homes, including 779 delivered by St Modwen over the 11 months since the acqui]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/miller-homes-targets-7000-homes-after-record-results-surge/</link><pubDate>Fri, 27 Mar 2026 09:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/miller-homes-targets-7000-homes-after-record-results-surge/</guid></item><item><title><![CDATA[Winners revealed for £500m modular building framework]]></title><description><![CDATA[Public sector buying body YPO has confirmed winners of its &pound;500m framework for modular buildings.<br />
The four-year deal will simplify&nbsp;the purchase or hire of modular buildings across the public sector, including education, health, housing, and justice sectors.<br />
Michelle Walker, Head of Procurement Service and Supply Solutions at YPO, said: &ldquo;We have an outstanding panel of providers on this agreement, which offers innovative and sustainable solutions to meet the needs of YPO customer]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winners-revealed-for-500m-modular-building-framework/</link><pubDate>Fri, 27 Mar 2026 08:53:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winners-revealed-for-500m-modular-building-framework/</guid></item><item><title><![CDATA[First floating wind turbine assembly port set for Port Talbot]]></title><description><![CDATA[Plans to build the UK&rsquo;s first floating offshore wind farm assembly facility in Port Talbot are set to advance after ministers agreed up to &pound;64m of support to kickstart the scheme.<br />
The funding deal with Associated British Ports will unlock early design, engineering and enabling works, paving the way for a full-scale redevelopment of the South Wales port into a heavy-duty assembly and marshalling hub for Celtic Sea projects.<br />
The move signals the first real step towards building the ons]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/first-floating-wind-turbine-assembly-port-set-for-port-talbot/</link><pubDate>Fri, 27 Mar 2026 08:29:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/first-floating-wind-turbine-assembly-port-set-for-port-talbot/</guid></item><item><title><![CDATA[Ant Yapi lands Holland Park Gate contract]]></title><description><![CDATA[Ant Yapi UK has landed the contract for phase two of the Holland Park Gate scheme in Kensington, West London.<br />
The Turkish-owned contractor will deliver 35 affordable housing units, 10 high-end apartments and three luxury penthouses for client Lodha group on the former Odeon cinema site opposite the Design Museum.<br />
Ant Yapi said: &ldquo;We are honoured to partner on this landmark development and look forward to delivering a project that reflects the highest standards of quality and craftsmanship.&]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ant-yapi-lands-holland-park-gate-contract/</link><pubDate>Fri, 27 Mar 2026 08:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ant-yapi-lands-holland-park-gate-contract/</guid></item><item><title><![CDATA[Defence infrastructure push risks stalling without reform]]></title><description><![CDATA[The industry is calling for sweeping reforms to defence infrastructure procurement as the Ministry of Defence ramps up spending, with warnings the current model will not cope with the scale of work ahead.<br />
A report from consultant Gleeds says the Defence Infrastructure Organisation must shift away from one-off procurement towards alliancing and early contractor involvement to build the strong supply chain needed to deliver at pace the UK&rsquo;s ambitions.<br />
Defence infrastructure spending is expec]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/defence-infrastructure-push-risks-stalling-without-reform/</link><pubDate>Fri, 27 Mar 2026 08:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/defence-infrastructure-push-risks-stalling-without-reform/</guid></item><item><title><![CDATA[Hill to build UK’s first large-scale dual cohousing build]]></title><description><![CDATA[Hill Group will start this summer building a rare double cohousing scheme at Cambridgeshire&rsquo;s new town development Northstowe, after planners gave the green light to a 145-home neighbourhood built around shared living.<br />
South Cambridgeshire District Council has approved the project, which will bring two resident-led communities together side-by-side in a single development &ndash; a UK first at this scale.<br />
The scheme marks the first major job from a joint venture between developer TOWN and]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-to-build-uks-first-large-scale-dual-cohousing-build/</link><pubDate>Fri, 27 Mar 2026 08:02:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-to-build-uks-first-large-scale-dual-cohousing-build/</guid></item><item><title><![CDATA[£27bn RIS 3 roads reboot targets network renewal – Full list]]></title><description><![CDATA[The government has finally confirmed schemes in its &pound;27bn five-year roads programme to overhaul England&rsquo;s ageing motorway and A-road network.<br />
The new Road Investment Strategy 3 marks a pivot toward maintenance, renewal, and completing existing, rather than starting new, enhancement projects.<br />
Just five big enhancement schemes are due to start during the five-year RIS3 period through to 2031.Ministers are pitching the package as one of the biggest ever road funding rounds, with a clear]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/27bn-ris-3-roads-reboot-targets-network-renewal-full-list/</link><pubDate>Thu, 26 Mar 2026 12:10:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/27bn-ris-3-roads-reboot-targets-network-renewal-full-list/</guid></item><item><title><![CDATA[Mears £700m housing wins lift order book to record £4bn]]></title><description><![CDATA[Mears has piled on fresh long-term work after landing two major housing maintenance deals worth &pound;700m, pushing its order book to a record &pound;4bn.<br />
The social housing services contractor this morning revealed it had secured a &pound;450m, 10-year contract with Birmingham City Council and a &pound;250m, 10-year deal with Cross Keys Homes in Peterborough, cementing its push into core maintenance work.<br />
The wins cap a strong year of contract retention and new business, with Mears now sitting]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mears-700m-housing-wins-lift-order-book-to-record-4bn/</link><pubDate>Thu, 26 Mar 2026 08:35:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mears-700m-housing-wins-lift-order-book-to-record-4bn/</guid></item><item><title><![CDATA[Former ISG staff win redundancy legal claims]]></title><description><![CDATA[Nearly 1,700 former staff at collapsed contractor ISG have won legal claims against the company for failing to consult with them before they were made redundant.<br />
The Employment Tribunal ruling has been shared with the Enquirer showing a victory for 1,687 ex-ISG staff.<br />
The former employees have been successful in their Protective Award claims worth up to &pound;5,600 each &ndash; more than &pound;9m in total.The tribunal ruled in their favour because ISG failed in its legal duty to consult collec]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/former-isg-staff-win-redundancy-legal-claims/</link><pubDate>Thu, 26 Mar 2026 08:20:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/former-isg-staff-win-redundancy-legal-claims/</guid></item><item><title><![CDATA[London planning rules torn up to speed up housing]]></title><description><![CDATA[Ministers and City Hall have ripped up key planning constraints in a bid to kickstart London house building and unlock dozens of stalled schemes.<br />
Housing Secretary Steve Reed and Mayor Sadiq Khan have agreed a package of emergency, time-limited measures designed to get sites moving again.<br />
The plan centres on fast-tracking viable schemes, easing cost burdens and giving the Mayor new powers to override borough refusals on major projects.Three key measures driving the resetFast-track planning route]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-planning-rules-torn-up-to-speed-up-housing/</link><pubDate>Wed, 25 Mar 2026 16:45:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-planning-rules-torn-up-to-speed-up-housing/</guid></item><item><title><![CDATA[Brick giant to fire up world’s first hydrogen kilns]]></title><description><![CDATA[Brickmaker Wienerberger has secured government funding to push ahead with a world-first hydrogen-fired brick kiln at its Denton factory in Greater Manchester.<br />
The Industrial Energy Transformation Fund award will support a &pound;6m programme to convert the site&rsquo;s gas-fired kilns to run on 100% green hydrogen.<br />
Two tunnel kilns will be retrofitted, replacing 224 burners and installing new hydrogen supply, control and electrical systems without altering the kiln structures.The move will make]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/brick-giant-to-fire-up-worlds-first-hydrogen-kilns/</link><pubDate>Wed, 25 Mar 2026 16:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/brick-giant-to-fire-up-worlds-first-hydrogen-kilns/</guid></item><item><title><![CDATA[Vinci and Hochtief set for £170m Southampton student digs job]]></title><description><![CDATA[Vinci Building and Hochtief have bagged a &pound;170m student accommodation job at the University of Southampton as part of the Aspire consortium.<br />
The long-term public-private partnership will see the team design, build, finance and operate new and refurbished halls across the Connaught and South Stoneham campuses over 50 years.<br />
Work will deliver 1,092 new student bed spaces by 2029 alongside the refurbishment of 399 existing rooms and restoration of the Grade II listed Stoneham House.The Aspire]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vinci-and-hochtief-set-for-170m-southampton-student-digs-job/</link><pubDate>Wed, 25 Mar 2026 15:50:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vinci-and-hochtief-set-for-170m-southampton-student-digs-job/</guid></item><item><title><![CDATA[Caddick wins £46m Leeds hotel job]]></title><description><![CDATA[Caddick Construction has been appointed main contractor on a new &pound;46m hotel in Leeds city centre.<br />
Work will start on site in May until spring 2028 to a build new room2 hotel after a funding deal was secured by developer Marrico and Helios Real Estate with Aberdeen Investments.<br />
The development will be located on the former Leeds International Swimming Pool site and forms part of the wider Lisbon Street regeneration in the West End of Leeds.The 16-storey scheme will contain 200 hotel rooms,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-wins-46m-leeds-hotel-job/</link><pubDate>Wed, 25 Mar 2026 15:31:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-wins-46m-leeds-hotel-job/</guid></item><item><title><![CDATA[Police launch construction invoice fraud campaign]]></title><description><![CDATA[The National Crime Agency and National Federation of Builders have launched a joint campaign highlighting the risks of invoice fraud.<br />
The drive is&nbsp; aimed at accounts payable professionals and finance personnel in the industry.<br />
The agency warned construction is especially vulnerable to invoice fraud because it relies on complex supply chains, frequent high value payments and reliance on emails to communicate payment instructions which criminals can compromise.Invoice fraud happens when crimi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/police-launch-construction-invoice-fraud-campaign/</link><pubDate>Wed, 25 Mar 2026 12:37:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/police-launch-construction-invoice-fraud-campaign/</guid></item><item><title><![CDATA[AtkinsRéalis lands £98m rail upgrade deal]]></title><description><![CDATA[AtkinsR&eacute;alis has been awarded a &pound;98.5m contract by Network Rail to upgrade signalling and telecommunications infrastructure in Wessex.<br />
The three-year programme will be delivered by a Network Rail and AtkinsR&eacute;alis integrated project team, covering 43 kilometres of railway near Portsmouth spanning 11 stations.<br />
Scott Kelley, Managing Director of Complex Projects, AtkinsR&eacute;alis, said: &ldquo;This project will significantly improve network performance throughout Wessex, bene]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/atkinsralis-lands-98m-rail-upgrade-deal/</link><pubDate>Wed, 25 Mar 2026 09:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/atkinsralis-lands-98m-rail-upgrade-deal/</guid></item><item><title><![CDATA[M&amp;E expert returns to run Hinkley Point C]]></title><description><![CDATA[EDF has drafted in engineering heavyweight Mark Hartley to take charge of the Hinkley Point C nuclear build in Somerset.<br />
Hartley will take over as chief executive from 1 July, replacing long-serving boss Stuart Crooks, who is stepping down after 40 years in the nuclear industry.<br />
Hartley, an expert in mechanical engineering,&nbsp; returns to the mega-project having previously spent five years as technical director on the job before moving in 2023 to lead EDF&rsquo;s Nuclear Operations business, w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mampe-expert-returns-to-run-hinkley-point-c/</link><pubDate>Wed, 25 Mar 2026 09:03:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mampe-expert-returns-to-run-hinkley-point-c/</guid></item><item><title><![CDATA[Bouygues gets go-ahead for triple tower London student job]]></title><description><![CDATA[Bouygues UK has secured planning for a near-2,000-bed student tower scheme behind Tate Modern in London.<br />
Approval clears the path for a 2027 start on the LSE Bankside project, with the team now preparing a Gateway 2 submission on one of the capital&rsquo;s largest student accommodation jobs.<br />
Southwark council has backed plans to redevelop Bankside House at 24 Sumner Street, with Bouygues working alongside LSE and investor Equitix.The project will replace the existing building with three linked t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bouygues-gets-go-ahead-for-triple-tower-london-student-job/</link><pubDate>Wed, 25 Mar 2026 00:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bouygues-gets-go-ahead-for-triple-tower-london-student-job/</guid></item><item><title><![CDATA[Final &pound;400m phase of London Elephant &amp; Castle scheme approved]]></title><description><![CDATA[Build to rent developer Get Living has secured planning approval for the third and final phase of its &pound;1.5bn Elephant and Castle overhaul.<br />
This clears the way for another 959 homes and student rooms at the south London regeneration job.<br />
Southwark council approved revised plans for the West Site, covering the existing London College of Communication plot once the university moves into its new home at The Elephant.<br />
The consented scheme will deliver 507 build-to-rent homes, including 165 affo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/final-pound400m-phase-of-london-elephant-amp-castle-scheme-approved/</link><pubDate>Wed, 25 Mar 2026 00:07:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/final-pound400m-phase-of-london-elephant-amp-castle-scheme-approved/</guid></item><item><title><![CDATA[Sisk to revamp Edgbaston in time for 2027 Ashes]]></title><description><![CDATA[Sisk has been confirmed as main contractor to deliver the &pound;42m redevelopment of Edgbaston Stadium in Birmingham.<br />
The contract will form part of Edgbaston&rsquo;s Masterplan and will see Sisk undertake the redevelopment of the Raglan and Priory Stands into a new 3,200-seater stand delivering improved spectator facilities plus a new four-star Radisson RED hotel complete with hospitality boxes and pitch-facing rooms.<br />
Completion of the stadium redevelopment is forecast in time for the Men&rsqu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sisk-to-revamp-edgbaston-in-time-for-2027-ashes/</link><pubDate>Tue, 24 Mar 2026 19:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sisk-to-revamp-edgbaston-in-time-for-2027-ashes/</guid></item><item><title><![CDATA[Anamore lands London remediation projects]]></title><description><![CDATA[Specialist remediation contractor&nbsp;Anamore&nbsp;has secured multiple new projects across London and the South East, further expanding its growing portfolio in&nbsp;the building safety sector.<br />
The latest remediation project is at Wren&rsquo;s Cross, a residential development completed in 2019 in Maidstone.<br />
The scheme comprises 66 apartments within a single block where Anamore will deliver a programme of remediation works designed to reduce fire risk and ensure the safety of all occupants.<br />
At]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/anamore-lands-london-remediation-projects/</link><pubDate>Tue, 24 Mar 2026 16:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/anamore-lands-london-remediation-projects/</guid></item><item><title><![CDATA[London Charing Cross landmark office to be rebuilt inside]]></title><description><![CDATA[Architect Hopkins has unveiled detailed plans to overhaul 1 Embankment Place above London&rsquo;s Charing Cross Station, turning the ageing air-rights landmark into a high-spec, low-carbon office and mixed-use destination.<br />
Working for developer Bridgemont, the scheme will retain around 90% of the existing Terry Farrell-designed structure and most of the fa&ccedil;ade, but rework the building internally and at ground level to bring it up to modern standards.<br />
Plans include 35,000 sq m of Grade A o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/london-charing-cross-landmark-office-to-be-rebuilt-inside/</link><pubDate>Tue, 24 Mar 2026 15:40:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/london-charing-cross-landmark-office-to-be-rebuilt-inside/</guid></item><item><title><![CDATA[McLaughlin &amp;&nbsp;Harvey lands &pound;107m port upgrade deal]]></title><description><![CDATA[McLaughlin &amp; Harvey has been awarded the main contractor role on a &pound;107m upgrade to Port Ellen Ferry Terminal on the Isle of Islay in Scotland.<br />
Work for the client Caledonian Maritime Assets Limited will start in June and is expected to complete in 2029.<br />
The redevelopment project will deliver a modernised harbour and expanded landside infrastructure to support current and future ferry operations.Works include significant land reclamation to create the required marshalling and laydown a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-ampnbspharvey-lands-pound107m-port-upgrade-deal/</link><pubDate>Tue, 24 Mar 2026 14:46:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-ampnbspharvey-lands-pound107m-port-upgrade-deal/</guid></item><item><title><![CDATA[Lifting giant Palfinger links-up with APS]]></title><description><![CDATA[Lifting giant PALFINGER has signed a new distribution partnership with APS (Access Platform Sales) to strengthen its position in the UK market for aerial work platforms.<br />
APS will take over the distribution, sales, and after sales support of PALFINGER&acute;s aerial work platform business across the country.<br />
Bernd Winderle, VP Sales &amp; Service EMEA PD at PALFINGER said: &ldquo;This new partnership with APS represents an important step forward in reinforcing PALFINGER&acute;s aerial work platfo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/lifting-giant-palfinger-links-up-with-aps/</link><pubDate>Tue, 24 Mar 2026 13:25:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/lifting-giant-palfinger-links-up-with-aps/</guid></item><item><title><![CDATA[Michelmersh hit by weak demand and tight brick pricing]]></title><description><![CDATA[Premium brickmaker Michelmersh saw profits slide last year as weak construction demand and fierce price competition offset a modest rise in domestic brick volumes.<br />
The specialist brickmaker said revenue dipped 1.7% to &pound;69m in the year to 31 December 2025, while pre-tax profit nearly halved to &pound;4.3m.<br />
The group blamed the drop on a sluggish UK market, tight pricing across the sector and disruption from its own investment and integration programme.Michelmersh said UK brick dispatches ro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/michelmersh-hit-by-weak-demand-and-tight-brick-pricing/</link><pubDate>Tue, 24 Mar 2026 12:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/michelmersh-hit-by-weak-demand-and-tight-brick-pricing/</guid></item><item><title><![CDATA[Tower plans squeezed as London build costs spiral]]></title><description><![CDATA[London&rsquo;s next wave of skyscrapers is at risk of stalling after build costs surged by up to 40% in five years, leaving developers struggling to make schemes stack up.<br />
A new report from Turner &amp; Townsend warns that viability has become the single biggest barrier to delivering tall buildings in the capital, with rising costs now colliding with weaker yields and tougher funding conditions.<br />
The consultant found London has seen one of the steepest cost increases of any global city, making it]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tower-plans-squeezed-as-london-build-costs-spiral/</link><pubDate>Tue, 24 Mar 2026 09:05:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tower-plans-squeezed-as-london-build-costs-spiral/</guid></item><item><title><![CDATA[McLaughlin &amp; Harvey lands Old Broad St revamp]]></title><description><![CDATA[McLaughlin &amp; Harvey has landed the &pound;50m contract for a deep retrofit of the former Pinners Hall at 108 Old Broad Street in the City of London.<br />
Development manager Patrizia confirmed the award with work starting this month and practical completion targeted for August 2027.<br />
Planning consent achieved in November will see the 1990s building transformed into a modern, highly sustainable destination in the heart of London&rsquo;s financial district containing 120,000 sq ft of high-quality wo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-amp-harvey-lands-old-broad-st-revamp/</link><pubDate>Tue, 24 Mar 2026 08:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaughlin-amp-harvey-lands-old-broad-st-revamp/</guid></item><item><title><![CDATA[Government set to ban retentions]]></title><description><![CDATA[The Government is planning to ban retentions in construction as part of a major crack down on late payments.<br />
It said: &ldquo;We propose to ban the withholding of retention payments under the terms of construction contracts, consulting on its implementation.<br />
&ldquo;This will prevent small firms losing retentions to insolvency or non-payment.&rdquo;<br />
Initial consultations showed the majority of the industry is in favour of a total ban rather than an alternative system like project bank accounts.<br />
Co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-set-to-ban-retentions/</link><pubDate>Tue, 24 Mar 2026 08:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-set-to-ban-retentions/</guid></item><item><title><![CDATA[Ministers delay HS2 reset plan for extra cost savings]]></title><description><![CDATA[HS2 has been ordered to hunt for more savings as ministers push the troubled high-speed line towards a cheaper and quicker finish.<br />
Transport Secretary Heidi Alexander has tasked HS2 chief executive Mark Wild with testing whether stripping out complexity from the railway could save taxpayers billions and bring services into operation sooner.<br />
Top of the list is a rethink of the line&rsquo;s original 360km/h specification.Ministers said no railway in the UK or elsewhere is currently engineered for]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ministers-delay-hs2-reset-plan-for-extra-cost-savings/</link><pubDate>Tue, 24 Mar 2026 00:22:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ministers-delay-hs2-reset-plan-for-extra-cost-savings/</guid></item><item><title><![CDATA[Rouse acquires Sumitomo excavator dealership]]></title><description><![CDATA[Leeds-based K Rouse has taken on the dealership for Sumitomo Excavators as the Japanese giant introduces its first own-branded machines to the UK.<br />
It is the first time Sumitomo has gone direct to the market with its own-branded machines having previously supplied excavators to other manufacturers.<br />
Rouse will supply a range of 8t-50t Dash-7 diggers to the market through it Armley dealership European Plant Ltd.The target territory for plant hires and contractors will span Leeds, Nottingham, Lincol]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/rouse-acquires-sumitomo-excavator-dealership/</link><pubDate>Mon, 23 Mar 2026 16:50:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/rouse-acquires-sumitomo-excavator-dealership/</guid></item><item><title><![CDATA[JRL submits Gateway 2 for Manchester 28-storey tower]]></title><description><![CDATA[London construction group JRL has taken a key step towards starting its first Manchester development after submitting a Gateway 2 application for its &pound;75m Sparkle Street build-to-rent tower.<br />
The 28-storey scheme, close to Piccadilly station, has already secured planning approval and now moves into the Building Safety Regulator approval stage with the hope of starting work this summer.<br />
JRL will deliver the 359 flats scheme through its in-house model, with Midgard acting as main contractor a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jrl-submits-gateway-2-for-manchester-28-storey-tower/</link><pubDate>Mon, 23 Mar 2026 16:35:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jrl-submits-gateway-2-for-manchester-28-storey-tower/</guid></item><item><title><![CDATA[Hercules shares to be suspended as results delayed]]></title><description><![CDATA[Shares in labour supply specialist Hercules will be suspended after the firm confirmed it will miss the deadline for filing its latest annual accounts.<br />
Final results for the year ended 30 September 2025 where due to be posted by 31 March 2026.<br />
But Hercules said the accounts have taken longer than expected &ldquo;due to the consolidation of acquisitions and further work needed to review certain subcontractor contracts.&rdquo;It added: &ldquo;Consequently, in accordance with the AIM Rules, the Com]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hercules-shares-to-be-suspended-as-results-delayed/</link><pubDate>Mon, 23 Mar 2026 16:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hercules-shares-to-be-suspended-as-results-delayed/</guid></item><item><title><![CDATA[£125m plan to convert Oxford store into labs approved]]></title><description><![CDATA[Oxford has approved a &pound;125m plan to turn a former Debenhams store into a flagship life sciences hub in the city centre.<br />
The major retrofit scheme at 1&ndash;12 Magdalen Street has been designed by architect Perkins&amp;Will for a partnership between The Crown Estate, Pioneer Group and Oxford Science Enterprises.<br />
The project is currently out to tender, with Morgan Sindall understood to be one of the firms pursuing the job to create around 100,000 sq ft of lab-enabled incubator and accelerat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/125m-plan-to-convert-oxford-store-into-labs-approved/</link><pubDate>Mon, 23 Mar 2026 15:56:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/125m-plan-to-convert-oxford-store-into-labs-approved/</guid></item><item><title><![CDATA[John F Hunt kick starts work on colliery site revamp]]></title><description><![CDATA[John F Hunt has been appointed to deliver a &pound;15m package of enabling works for first phase of the Parkside regeneration project in Newton-le-Willows, St Helens.<br />
The scheme&rsquo;s 800,000 sq ft first phase will contain three logistics units on the site of the former Parkside Colliery.<br />
The enabling works programme includes site clearance, earthworks cut and fill to form platforms at the required formation levels alongside highways, drainage, service distribution and landscaping works.Follow]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-kick-starts-work-on-colliery-site-revamp/</link><pubDate>Mon, 23 Mar 2026 15:03:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-kick-starts-work-on-colliery-site-revamp/</guid></item><item><title><![CDATA[Consultation opens on merging CITB and ECITB]]></title><description><![CDATA[The industry is now being asked its views on merging the Engineering Construction Industry Training Board (ECITB) and the Construction Industry Training Board (CITB) to form a single training body.<br />
The government is proposing to establish a single, unified Industry Training Board which would serve the combined construction and engineering construction sectors.<br />
It said: &ldquo;Before a change of this nature can be made, government must consult affected industry.&rdquo;The consultation began on Mo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/consultation-opens-on-merging-citb-and-ecitb/</link><pubDate>Mon, 23 Mar 2026 14:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/consultation-opens-on-merging-citb-and-ecitb/</guid></item><item><title><![CDATA[Hyde Group and L&amp;G join forces in affordable homes drive]]></title><description><![CDATA[Hyde Group and Legal &amp; General (L&amp;G) have formed a new investment partnership to deliver more affordable homes across the UK.<br />
The joint venture brings together the housing body and investment giant and will launch with&nbsp;a seed portfolio of over 1,000 homes.<br />
The partnership will be jointly equity financed and supported through L&amp;G&rsquo;s annuity portfolio, which deploys capital into productive assets that aims to generate income to support long-term pension commitments.The deal w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hyde-group-and-lampg-join-forces-in-affordable-homes-drive/</link><pubDate>Mon, 23 Mar 2026 08:55:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hyde-group-and-lampg-join-forces-in-affordable-homes-drive/</guid></item><item><title><![CDATA[Race starts for £1bn NHS decarbonisation framework]]></title><description><![CDATA[The NHS&rsquo;s northern procurement hub has invited tenders for places on a &pound;1bn framework to help trusts and public bodies deliver major decarbonisation and energy infrastructure upgrades.<br />
The framework is designed to support clients from the earliest planning stages through to live project delivery and ongoing contract management.<br />
That means consultants, specialist advisers and installation contractors will all be chasing places.The biggest single package is Lot 6, a &pound;200m total s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/race-starts-for-1bn-nhs-decarbonisation-framework/</link><pubDate>Mon, 23 Mar 2026 08:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/race-starts-for-1bn-nhs-decarbonisation-framework/</guid></item><item><title><![CDATA[Apartment block evacuated over beam safety fears]]></title><description><![CDATA[Residents of an apartment block in Plymouth have been ordered to leave their homes after warnings from structural engineers.<br />
People were asked to leave Evolution Cove in Plymouth on Friday night after damage was discovered to key structural beams in the 64-unit apartment block.<br />
Property manager Centrick told the BBC temporary accommodation had been provided and a structural back-propping system would be installed in the building.It said the works were expected to take about four weeks.<br />
Property]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/apartment-block-evacuated-over-beam-safety-fears/</link><pubDate>Mon, 23 Mar 2026 08:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/apartment-block-evacuated-over-beam-safety-fears/</guid></item><item><title><![CDATA[Crown Estate lines up £25m Hemel housing testbed job]]></title><description><![CDATA[The Crown Estate has kicked off the hunt for a contractor to deliver its &pound;24.7m Westwick Row housing scheme in Hemel Hempstead, which will act as a live test bed for a much larger 4,000-home expansion.<br />
The job will be let on a two-stage design and build basis, with the successful bidder first brought in under a pre-construction services agreement to shape the detailed design and delivery strategy before moving on to construction.<br />
Westwick Row will deliver around 80 homes on a five-acre sit]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/crown-estate-lines-up-25m-hemel-housing-testbed-job/</link><pubDate>Mon, 23 Mar 2026 08:13:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/crown-estate-lines-up-25m-hemel-housing-testbed-job/</guid></item><item><title><![CDATA[Seven new towns named to close homes delivery gap]]></title><description><![CDATA[Ministers have unveiled seven proposed new towns that could deliver up to 200,000 homes in a fresh attempt to get the Government&rsquo;s faltering 1.5 million homes target back on track.<br />
Each location is expected to deliver at least 10,000 homes, with several schemes scaling up to 40,000 as part of a new generation of large-scale, infrastructure-led communities.<br />
The seven sites span London and key regional growth corridors, with a strong focus on transport links to unlock development and support]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/seven-new-towns-named-to-close-homes-delivery-gap/</link><pubDate>Mon, 23 Mar 2026 08:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/seven-new-towns-named-to-close-homes-delivery-gap/</guid></item><item><title><![CDATA[Worker crushed under concrete pillar]]></title><description><![CDATA[A construction worker is recovering in hospital after being trapped under a concrete pillar on a housing site in Stoke-on-Trent on Friday.<br />
Lovell Partnerships is transforming the former Edensor High School site in Longton into a new 193 home scheme.<br />
A Staffordshire Police spokesman told the Stoke Sentinel: &ldquo;We were called to Edensor Road following concerns for the welfare of a man at a building site. A man had sustained serious injuries after becoming trapped under a concrete pillar.&ldquo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-crushed-under-concrete-pillar/</link><pubDate>Sat, 21 Mar 2026 14:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-crushed-under-concrete-pillar/</guid></item><item><title><![CDATA[Five firms land £1bn Guinness maintenance deal]]></title><description><![CDATA[Five firms have been confirmed as long-term housing maintenance partners for The Guinness Partnership under a 15-year deal worth more than &pound;1bn.<br />
The winning contractors and regions they will cover are:Axis Europe Ltd &ndash; Greater London &amp;&nbsp;South East&nbsp;and Coast<br />
Fortem&nbsp;Solutions Limited &ndash; Yorkshire, Humberside &amp; East Midlands<br />
Morgan Sindall Property Services Limited &ndash; Home Counties<br />
Novus Property Solutions Limited &ndash; South West.<br />
UI Social Infrastruct]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/five-firms-land-1bn-guinness-maintenance-deal/</link><pubDate>Fri, 20 Mar 2026 16:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/five-firms-land-1bn-guinness-maintenance-deal/</guid></item><item><title><![CDATA[Government steel strategy set to drive up construction costs]]></title><description><![CDATA[Contractors are bracing for a fresh wave of cost inflation after the Government unveiled a hardline steel strategy designed to curb imports and boost domestic production.<br />
Ministers have set out plans to cut steel import quotas by 60% from July and impose a 50% tariff on material brought in above those limits &mdash; a move aimed at shielding UK producers but set to ripple through the construction supply chain.<br />
The strategy also sets a target for UK steel to meet up to 50% of domestic demand, up]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/government-steel-strategy-set-to-drive-up-construction-costs/</link><pubDate>Fri, 20 Mar 2026 09:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/government-steel-strategy-set-to-drive-up-construction-costs/</guid></item><item><title><![CDATA[Teenage labourer dies in ventilation shaft fall]]></title><description><![CDATA[A construction firm has been fined &pound;40,200 after a teenage labourer died after falling down a ventilation shaft on a London building site.<br />
Renols Lleshi, 19, was helping to dismantle scaffolding on the 12th floor roof garden of a block of flats being built at the Ark Soane Academy site, Mill Hill Road, London W3 on 5 July 2023. As he stepped onto a ventilation shaft the covering gave way, and he fell six floors to his death.<br />
His father said &ldquo;My family and I are devastated by the loss]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/teenage-labourer-dies-in-ventilation-shaft-fall/</link><pubDate>Fri, 20 Mar 2026 09:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/teenage-labourer-dies-in-ventilation-shaft-fall/</guid></item><item><title><![CDATA[Hill seals London Woolwich social homes deal with Clarion]]></title><description><![CDATA[Clarion Housing Group has struck a deal with The Hill Group to deliver 188 social rent homes as part of the wider Woolwich Leisure Centre redevelopment in south-east London.<br />
The homes will sit within a 557-home mixed-tenure scheme being brought forward by Hill in partnership with the Royal Borough of Greenwich, alongside a new leisure centre.<br />
Clarion has acquired the affordable element through a Section 106 deal, securing the social rent homes in Blocks D and E of the development.The scheme will]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-seals-london-woolwich-social-homes-deal-with-clarion/</link><pubDate>Fri, 20 Mar 2026 09:04:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-seals-london-woolwich-social-homes-deal-with-clarion/</guid></item><item><title><![CDATA[Former Battersea Power Station boss launches tribunal claim]]></title><description><![CDATA[Former CEO Don O&rsquo;Sullivan is bringing a claim for unfair dismissal and whistleblowing detriment against Battersea Power Station Development Company and four senior Malaysian executives.<br />
O&rsquo;Sullivan joined Battersea in June 2024 after 21 years at Galliard Homes.<br />
He was dismissed in May 2025 amid claims he raised whistleblowing concerns about his employer, a Malaysian-owned development company.He alleges that he was dismissed following charges of gross misconduct after raising concerns]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/former-battersea-power-station-boss-launches-tribunal-claim/</link><pubDate>Fri, 20 Mar 2026 08:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/former-battersea-power-station-boss-launches-tribunal-claim/</guid></item><item><title><![CDATA[Gobion lands £52m DP World London Gateway yard job]]></title><description><![CDATA[Gobion Construction has secured a &pound;52m contract to deliver a major container storage yard expansion at London Gateway Port in Thurrock.<br />
The job, awarded by London Gateway Port, will see the SME contractor build out a new automated container yard at Berth 5 as the port ramps up capacity.<br />
The one-year programme is due to start at the end of March following the standstill period, with completion targeted by March 2027.Works will deliver 10 automated stacking crane modules alongside heavy-duty]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gobion-lands-52m-dp-world-london-gateway-yard-job/</link><pubDate>Fri, 20 Mar 2026 08:53:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gobion-lands-52m-dp-world-london-gateway-yard-job/</guid></item><item><title><![CDATA[American student builder gets Birmingham green light]]></title><description><![CDATA[America&rsquo;s largest student accommodation developer Landmark Properties has been given the green light for a scheme at 120 Suffolk Street in the centre of Birmingham.<br />
The purpose-built student accommodation (PBSA) community will also include high quality communal and outdoor spaces next to New Street Station.<br />
The job will be completed in 2029 and reinforces Landmark Properties&rsquo; plans to implement four to six PBSA and residential schemes per year.The firm entered the UK market in 2024,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/american-student-builder-gets-birmingham-green-light/</link><pubDate>Fri, 20 Mar 2026 08:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/american-student-builder-gets-birmingham-green-light/</guid></item><item><title><![CDATA[Winners named for £1bn North West contractor framework]]></title><description><![CDATA[Procure Partnerships has unveiled the winners of its &pound;1bn framework covering construction, infrastructure and demolition works across the North West.<br />
The four-year deal is open to public sector clients across the region and is split into six construction lots, six infrastructure lots and a single demolition lot.<br />
Up to 10 contractors have been appointed to each lot, with heavyweights including Kier, Morgan Sindall, BAM, Galliford Try, Vinci, Wates and Willmott Dixon dominating the top-value]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winners-named-for-1bn-north-west-contractor-framework/</link><pubDate>Fri, 20 Mar 2026 08:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winners-named-for-1bn-north-west-contractor-framework/</guid></item><item><title><![CDATA[Go-ahead for Manchester Garden Village]]></title><description><![CDATA[Tameside Metropolitan Borough Council has resolved to grant planning consent for revised proposals for 2,150 new homes at Godley Green Garden Village.<br />
The news follows a &pound;17.4m funding deal towards upfront enabling works and supporting infrastructure from Greater Manchester Combined Authority.<br />
Godley Green Garden Village will provide up to 2,150 new homes, in addition to a host of community facilities and amenities, including a new primary school, sports pitches, two local centres. allotme]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-manchester-garden-village/</link><pubDate>Thu, 19 Mar 2026 09:00:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-manchester-garden-village/</guid></item><item><title><![CDATA[McGoff resets leadership to fuel next growth phase]]></title><description><![CDATA[Manchester-based contractor McGoff Group has overhauled its senior structure to support expansion across build-to-rent, elderly care and childcare schemes as revenues surge across its core construction arm.<br />
The business is ditching its single group director model for construction services and moving to standalone leadership teams headed by new MDs across its key divisions as workload ramps up.<br />
Main trading arm McGoff Construction Services is expected to post a strong rise in revenue in the year]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcgoff-resets-leadership-to-fuel-next-growth-phase/</link><pubDate>Thu, 19 Mar 2026 08:49:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcgoff-resets-leadership-to-fuel-next-growth-phase/</guid></item><item><title><![CDATA[Second-generation nuclear reactor demolition era begins]]></title><description><![CDATA[The UK&rsquo;s next wave of nuclear decommissioning has moved a step closer after the regulator signed off the transfer of Hunterston B to public sector control ahead of full dismantling.<br />
Government decommissioning body, Nuclear Restoration Services will take over ownership of the North Ayrshire reactor from EDF on 1 April.<br />
This will be the first Advanced Gas-Cooled Reactor station to enter formal decommissioning &ndash; marking a major shift as Britain begins retiring its second-generation nucl]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/second-generation-nuclear-reactor-demolition-era-begins/</link><pubDate>Thu, 19 Mar 2026 08:48:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/second-generation-nuclear-reactor-demolition-era-begins/</guid></item><item><title><![CDATA[Amey tops construction minimum wage breach list]]></title><description><![CDATA[Amey has been named as the highest-profile construction firm to underpay workers in the Government&rsquo;s latest national minimum wage crackdown after failing to pay &pound;169,447 to 2,608 staff.<br />
The infrastructure services contractor is the standout name in a list of around 30 firms, largely made up of smaller subcontractors and specialist trades, representing a small 7% slice of all firms named by the Government for breaches.<br />
This is the first &lsquo;naming round&rsquo; since the Chancellor&]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/amey-tops-construction-minimum-wage-breach-list/</link><pubDate>Thu, 19 Mar 2026 08:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/amey-tops-construction-minimum-wage-breach-list/</guid></item><item><title><![CDATA[Amey tops construction mimumum wage breach list]]></title><description><![CDATA[Amey has been named as the highest-profile construction firm to underpay workers in the Government&rsquo;s latest national minimum wage crackdown after failing to pay &pound;169,447 to 2,608 staff.<br />
The infrastructure services contractor is the standout name in a list of around 30 firms, largely made up of smaller subcontractors and specialist trades, representing a small 7% slice of all firms named by the Government for breaches.<br />
This is the first &lsquo;naming round&rsquo; since the Chancellor&]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/amey-tops-construction-mimumum-wage-breach-list/</link><pubDate>Thu, 19 Mar 2026 08:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/amey-tops-construction-mimumum-wage-breach-list/</guid></item><item><title><![CDATA[Willmott Dixon wins £39m college upgrade]]></title><description><![CDATA[Willmott Dixon has been chosen by the Department for Education to deliver a &pound;39m education building at Hopwood Hall College&rsquo;s Rochdale campus.<br />
The project procured via the DfE Construction Framework will see demolition of the existing college buildings and their replacement with four-storey educational facility spanning 75,000 sq ft on the St Marys Gate campus.<br />
Construction is expected to commence imminently with the new building scheduled for completion towards the end of 2028.Micha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-wins-39m-college-upgrade/</link><pubDate>Thu, 19 Mar 2026 08:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-wins-39m-college-upgrade/</guid></item><item><title><![CDATA[Balfour pleads not guilty after nuclear site death]]></title><description><![CDATA[Balfour Beatty Group Limited has pleaded not guilty to health and safety offences following a worker fatality at AWE&rsquo;s Aldermaston nuclear site.<br />
The firm appeared at High Wycombe Magistrates Court on Wednesday morning for a prosecution instigated by the Office for Nuclear Regulation (ONR), the UK&rsquo;s independent nuclear regulator.<br />
The charges relate to an incident which occurred at the Aldermaston site in West Berkshire on 6 July 2023 when Stuart Cook, 58, a construction worker from Ea]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-pleads-not-guilty-after-nuclear-site-death/</link><pubDate>Wed, 18 Mar 2026 17:35:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-pleads-not-guilty-after-nuclear-site-death/</guid></item><item><title><![CDATA[Contractor J Smart plans new industrial hub]]></title><description><![CDATA[Developers Manse LLP and contractor J. Smart &amp; Co have formed a joint venture and submitted a planning application to North Lanarkshire Council for a new industrial and logistics development at Eurocentral.<br />
The proposed Eurocentral Gateway scheme will deliver over 200,000 sq ft of new industrial and logistics space in one of Scotland&rsquo;s most established and sought-after distribution locations.<br />
Work will involve construction of two high-specification industrial buildings of approximately]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractor-j-smart-plans-new-industrial-hub/</link><pubDate>Wed, 18 Mar 2026 16:46:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractor-j-smart-plans-new-industrial-hub/</guid></item><item><title><![CDATA[Final phase of London’s Elephant Park gets green light]]></title><description><![CDATA[The final piece of the Elephant Park regeneration in London&rsquo;s Elephant and Castle area has secured planning, paving the way to close out more than a decade of transformation across the 10-acre site.<br />
Developer Hub is bringing forward the 1.2-acre mixed-use development, known as Chords. This will consist of 695 co-living flats and 20 three-bed family homes alongside community infrastructure, including a new NHS health centre.<br />
Designed by Allford Hall Monaghan Morris, the scheme will be deliv]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/final-phase-of-londons-elephant-park-gets-green-light/</link><pubDate>Wed, 18 Mar 2026 14:48:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/final-phase-of-londons-elephant-park-gets-green-light/</guid></item><item><title><![CDATA[HMRC promotes digital tax changes – with print ads]]></title><description><![CDATA[HMRC chiefs are reminding construction sole traders about digital tax changes with a print based advertising campaign.<br />
Making Tax Digital changes comes into force next month and require construction sole traders with qualifying income over &pound;50,000 to maintain digital records and send quarterly updates via HMRC-recognised software.<br />
But the government publicity campaign for the changes is being pushed through the industry&rsquo;s dwindling range of shrinking print titles.One contractor said:]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hmrc-promotes-digital-tax-changes-with-print-ads/</link><pubDate>Wed, 18 Mar 2026 13:37:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hmrc-promotes-digital-tax-changes-with-print-ads/</guid></item><item><title><![CDATA[Caddick bags £25m Durham student flats job]]></title><description><![CDATA[Caddick Construction has landed a &pound;25m design and build deal to deliver a 232-bed student scheme in Durham as it ramps up regional growth.<br />
The contractor will build the Melbury Court development off Old Dryburn Way for Whitesmocks, adding to its expanding North East pipeline.<br />
The PBSA scheme will provide modern student flats alongside landscaped public realm to improve the surrounding setting.Completion is targeted for summer 2027 ahead of the 2027/28 academic intake.<br />
The award marks anoth]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-bags-25m-durham-student-flats-job/</link><pubDate>Wed, 18 Mar 2026 09:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-bags-25m-durham-student-flats-job/</guid></item><item><title><![CDATA[Laing O’Rourke wins £3.2m High Court payout in film studios row]]></title><description><![CDATA[Laing O&rsquo;Rourke has secured a &pound;3.2m High Court victory after successfully enforcing an adjudication decision in a payment dispute with client Shepperton Studios.<br />
The Technology and Construction Court ruled that Shepperton must pay the sum plus VAT and interest following a row over an interim payment from a &pound;331m design and build contract in 2021.<br />
Laing O&rsquo;Rourke had originally sought to enforce a &pound;5.6m adjudication award in its favour but the court reduced the final s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-wins-32m-high-court-payout-in-film-studios-row/</link><pubDate>Wed, 18 Mar 2026 08:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/laing-orourke-wins-32m-high-court-payout-in-film-studios-row/</guid></item><item><title><![CDATA[Wates buys its head office building]]></title><description><![CDATA[Wates Group has purchased its long-standing head office in Leatherhead, Surrey.<br />
The acquisition of the 37,000 sq ft Wates House comes after the contractor has leased the building for 20 years.<br />
Eoghan O&rsquo;Lionaird, Chief Executive of Wates Group, said: &ldquo;As a purpose-led business, everything we do at Wates is driven by reimagining places for people to thrive.&ldquo;Securing the future of Wates House &ndash; our home for more than two decades &ndash; strengthens Wates&rsquo; long-term com]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-buys-its-head-office-building/</link><pubDate>Wed, 18 Mar 2026 08:53:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-buys-its-head-office-building/</guid></item><item><title><![CDATA[Beard gives away £4.5m as profits hit £9m high]]></title><description><![CDATA[Beard has capped a record year by handing half its &pound;9m profit back to communities as turnover surged 16% to &pound;230m.<br />
The family-owned contractor chose to donate &pound;4.5m to regional charities instead of boosting shareholder dividends, marking one of the biggest philanthropic moves seen among UK regional builders.<br />
Strong trading was driven by a busy delivery year, with 62 projects completed across its South of England patch and a steady stream of framework and direct award wins.Opera]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/beard-gives-away-45m-as-profits-hit-9m-high/</link><pubDate>Wed, 18 Mar 2026 08:50:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/beard-gives-away-45m-as-profits-hit-9m-high/</guid></item><item><title><![CDATA[Morgan Sindall starts £28m steel decarbonisation centre]]></title><description><![CDATA[Morgan Sindall has started work on the South Wales Industrial Transition from Carbon Hub (SWITCH).<br />
The &pound;28m research facility is designed to accelerate the decarbonisation of the steel and metals sector on a brownfield site at Port Talbot&rsquo;s Harbourside.<br />
Morgan Sindall was first instructed under a design and build deal in 2023.SWITCH Harbourside, will be a purpose built, open access research hub supporting innovation across academics, industry and government.<br />
Its focus will help secto]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-starts-28m-steel-decarbonisation-centre/</link><pubDate>Wed, 18 Mar 2026 08:32:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-starts-28m-steel-decarbonisation-centre/</guid></item><item><title><![CDATA[Costain bags £45m Rugby sewage works upgrade]]></title><description><![CDATA[Costain has secured a &pound;45m deal to upgrade key assets at Severn Trent&rsquo;s Rugby Newbold sewage treatment works, extending a long-running partnership between the pair.<br />
The contractor will act as principal contractor and principal designer on the scheme, which runs to 2028, delivering new facilities and upgrading existing systems to boost operational resilience.<br />
Work will also increase feed and storm capacity at the site, forming part of Severn Trent&rsquo;s wider AMP8 investment push ac]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-bags-45m-rugby-sewage-works-upgrade/</link><pubDate>Wed, 18 Mar 2026 08:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-bags-45m-rugby-sewage-works-upgrade/</guid></item><item><title><![CDATA[Barking Riverside doubles down with 20,000-home green light]]></title><description><![CDATA[London&rsquo;s biggest single-ownership housing scheme has been scaled up after planners backed a major expansion at Barking Riverside.<br />
Developer Barking Riverside Limited&nbsp;has secured revised outline consent to deliver up to 20,000 homes on the 443-acre east London site &ndash; almost doubling the original 10,800-home consent.<br />
The decision from Barking &amp; Dagenham councillors clears the way for a long-term build-out of one of the capital&rsquo;s most significant brownfield regeneration p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barking-riverside-doubles-down-with-20000-home-green-light/</link><pubDate>Wed, 18 Mar 2026 08:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barking-riverside-doubles-down-with-20000-home-green-light/</guid></item><item><title><![CDATA[Andrew Davison becomes joint MD at AGD]]></title><description><![CDATA[Plant hire specialist AGD Equipment Ltd has appointed Andrew Davison as Joint Managing Director.<br />
Davison brings over 25 years of experience in the piling and ground improvement markets, having spent most of his career with Keller and more recently working on HS2.<br />
Over the coming months Davison will be taking time to meet AGD customers and suppliers across the country.<br />
During his free time Davison races a Caterham car which has just been painted in the AGD orange livery.&nbsp;<br />
&nbsp;]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/andrew-davison-becomes-joint-md-at-agd/</link><pubDate>Wed, 18 Mar 2026 00:01:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/andrew-davison-becomes-joint-md-at-agd/</guid></item><item><title><![CDATA[Flood defence pipeline swells with £1.4bn boost]]></title><description><![CDATA[The Environment Agency has unveiled details of a &pound;1.4bn flood defence blitz to advance more than 600 schemes across England this year and next.<br />
Major schemes in the pipeline have already started and include the &pound;59m Bridgwater tidal barrier (Kier), &pound;37m Derby flood works (Sisk) and Kendal Flood Risk management scheme (VolkerStevin).<br />
The programme also spans small repairs works alongside a growing push on natural flood management to slow water upstream.<br />
Click here for full list]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/flood-defence-pipeline-swells-with-14bn-boost/</link><pubDate>Tue, 17 Mar 2026 09:25:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/flood-defence-pipeline-swells-with-14bn-boost/</guid></item><item><title><![CDATA[Final HS2 TBM starts drive towards Euston]]></title><description><![CDATA[HS2 has started the final tunnel bore on the project from Old Oak Common station in west London towards Euston.<br />
Euston is the second bored tunnel underneath the capital &ndash; after the Northolt Tunnel &ndash; and is being constructed by the Skanska Costain STRABAG joint venture.<br />
The 198-metre long machine operates as a 24/7 underground factory, excavating the earth and installing concrete segments into rings to create the tunnel.Overall, on both bores of the tunnel, 48,294 concrete segments wi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/final-hs2-tbm-starts-drive-towards-euston/</link><pubDate>Tue, 17 Mar 2026 08:39:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/final-hs2-tbm-starts-drive-towards-euston/</guid></item><item><title><![CDATA[West Midlands Police attacked over abnormal loads]]></title><description><![CDATA[Plant chiefs have blasted West Midlands Police&rsquo;s approach to abnormal load movements and are warning its behaviour could delay HS2 and other major&nbsp; infrastructure projects.<br />
Under national rules, companies moving abnormal loads to construction sites are required to notify the police in advance &ndash; not seek permission.<br />
Most abnormal loads are safely self-escorted by trained operators with police escorts used only where there is a clear and exceptional risk.The Construction Plant-hir]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/west-midlands-police-attacked-over-abnormal-loads/</link><pubDate>Tue, 17 Mar 2026 08:30:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/west-midlands-police-attacked-over-abnormal-loads/</guid></item><item><title><![CDATA[One in four construction workers now under 30]]></title><description><![CDATA[Fresh site scan data of skills card-carrying workers shows the workforce is getting younger and better qualified, challenging long-held fears about an ageing site workforce.<br />
New figures from the Construction Skills Certification Scheme reveal that now more than one in four CSCS cards is held by workers under 30.<br />
It is the first tangible evidence that the industry is successfully attracting young talent after years of concern about a looming greying workforce time bomb.<br />
The figures mark an eight-]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/one-in-four-construction-workers-now-under-30/</link><pubDate>Tue, 17 Mar 2026 08:30:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/one-in-four-construction-workers-now-under-30/</guid></item><item><title><![CDATA[Bid races starts for £5.5bn flood defence super-framework]]></title><description><![CDATA[The Environment Agency has started the hunt for contractors and consultants for its next-generation &pound;5.5bn Collaborative Delivery Framework 2 covering flood and coastal defence work across England.<br />
The eight-year programme will run from 2027 to 2035, replacing the current &pound;3bn framework of contractors including: BAM Nuttall, Kier, Jackson Civil Engineering and VolkerStevin, with design partners Arup, Atkins, Jacobs and Jeremy Benn Associates.<br />
CDF2 will support the Agency&rsquo;s nati]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bid-races-starts-for-55bn-flood-defence-super-framework/</link><pubDate>Tue, 17 Mar 2026 08:30:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bid-races-starts-for-55bn-flood-defence-super-framework/</guid></item><item><title><![CDATA[Bid race starts for £5.5bn flood defence super-framework]]></title><description><![CDATA[The Environment Agency has started the hunt for contractors and consultants for its next-generation &pound;5.5bn Collaborative Delivery Framework 2 covering flood and coastal defence work across England.<br />
The eight-year programme will run from 2027 to 2035, replacing the current &pound;3bn framework of contractors including: BAM Nuttall, Kier, Jackson Civil Engineering and VolkerStevin, with design partners Arup, Atkins, Jacobs and Jeremy Benn Associates.<br />
CDF2 will support the Agency&rsquo;s nati]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bid-race-starts-for-55bn-flood-defence-super-framework/</link><pubDate>Tue, 17 Mar 2026 08:30:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bid-race-starts-for-55bn-flood-defence-super-framework/</guid></item><item><title><![CDATA[Vistry appoints new chair as CEO succession plan gathers pace]]></title><description><![CDATA[House builder Vistry has drafted in Rob Woodward as its new non-executive chair, marking the start of a wider leadership reset at the partnerships specialist.<br />
Woodward will take the reins from Greg Fitzgerald at the AGM on 13 May, as Fitzgerald steps back from his dual role as executive chair and prepares to hand over as CEO within the next year.<br />
The move keeps succession plans firmly on track, with Woodward already embedded at board level after joining as senior independent director in 2024 to]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-appoints-new-chair-as-ceo-succession-plan-gathers-pace/</link><pubDate>Tue, 17 Mar 2026 08:29:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-appoints-new-chair-as-ceo-succession-plan-gathers-pace/</guid></item><item><title><![CDATA[Pothole crisis deepens despite funding rise]]></title><description><![CDATA[Local authorities across England and Wales are facing a record &pound;18.6bn backlog of carriageway repairs that would take more than a decade to clear, according to the latest Annual Local Authority Road Maintenance (ALARM) survey.<br />
Despite highway maintenance budgets rising sharply, the annual report warns there is still no quick fix for the deteriorating local road network.<br />
The survey by the Asphalt Industry Alliance found average highway maintenance budgets rose 17%, reaching &pound;30.5m per]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/pothole-crisis-deepens-despite-funding-rise/</link><pubDate>Tue, 17 Mar 2026 08:10:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/pothole-crisis-deepens-despite-funding-rise/</guid></item><item><title><![CDATA[Robertson uses blow-up roof to keep hospital dry]]></title><description><![CDATA[Contractor Robertson has turned to a giant inflatable roofing system to keep work moving on a &pound;38m hospital redevelopment while wards below stay open.<br />
The inflatable tents have been installed as part of the RAAC replacement programme on the roof of Royal Bolton Hospital&rsquo;s maternity unit.<br />
Robertson Construction North West has adapted the air-filled structures to sit on scaffolding at roof level. This creates a sealed weatherproof working area while crews remove reinforced autoclaved a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/robertson-uses-blow-up-roof-to-keep-hospital-dry/</link><pubDate>Mon, 16 Mar 2026 17:49:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/robertson-uses-blow-up-roof-to-keep-hospital-dry/</guid></item><item><title><![CDATA[Kier-led consortium lands £200m fusion energy plant]]></title><description><![CDATA[A construction partner has been confirmed for the &pound;200m redevelopment of the former West Burton Power Station in Nottinghamshire.<br />
The ILIOS consortium, led by Kier Group and Nuvia with partners AL_A&nbsp; Architects, Aecom and Turner &amp; Townsend will build the UK&rsquo;s first prototype fusion energy plant.<br />
The winners overcame competition for the build contract from Inovus Infrastructure, consisting of Balfour Beatty and Vinci alongside AtkinsRealis, Mott Macdonald and WSP and a Ferrov]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-led-consortium-lands-200m-fusion-energy-plant/</link><pubDate>Mon, 16 Mar 2026 14:48:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-led-consortium-lands-200m-fusion-energy-plant/</guid></item><item><title><![CDATA[TClarke pulls off Agratas gigafactory job]]></title><description><![CDATA[TClarke is understood to have withdrawn from the mechanical and electrical delivery team on the &pound;4bn Agratas electric vehicle battery gigafactory in Somerset.<br />
Industry sources said the building services specialist has stepped away from the Gravity Smart Campus project near Bridgwater following mounting &ldquo;relationship problems&rdquo; with client Agratas, the Tata Group&rsquo;s global battery business.<br />
The move will see TClarke redeploy staff previously assigned to the project across ot]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tclarke-pulls-off-agratas-gigafactory-job/</link><pubDate>Mon, 16 Mar 2026 09:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tclarke-pulls-off-agratas-gigafactory-job/</guid></item><item><title><![CDATA[Bill for bailing out British Steel set to top £1.5bn]]></title><description><![CDATA[The cost to taxpayers of keeping production going at British Steel&rsquo;s Scunthorpe blast furnace could exceed &pound;1.5bn by 2028.<br />
Spending watchdogs at the National Audit Office said the Government has spent &pound;377m so far to keep the site operational.<br />
The Department for Business and Trade (DBT) intervened last April after its Chinese owner Jingye threatened to close the loss-making site.The NAO said shutting the site&nbsp;would have resulted in a large number of job losses at Scunthorp]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bill-for-bailing-out-british-steel-set-to-top-15bn/</link><pubDate>Mon, 16 Mar 2026 08:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bill-for-bailing-out-british-steel-set-to-top-15bn/</guid></item><item><title><![CDATA[Wates wins key Parliamentary construction advisory role]]></title><description><![CDATA[Contractor Wates Construction has secured a consultancy role to oversee construction delivery standards across the Parliamentary Estate.<br />
The Corporate Officer of the House of Commons awarded the firm a &pound;209,484 professional services contract to provide a Head of Construction function supporting projects across Parliament&rsquo;s estate.<br />
The role is designed to strengthen delivery oversight on building works around Westminster, ensuring schemes meet required on-site standards and follow con]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-wins-key-parliamentary-construction-advisory-role/</link><pubDate>Mon, 16 Mar 2026 08:18:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-wins-key-parliamentary-construction-advisory-role/</guid></item><item><title><![CDATA[McAleer &amp; Rushe wins &pound;50m London student job]]></title><description><![CDATA[Developer Firethorn has secured Gateway 2 approval for a 284-bed student accommodation scheme in Stratford, clearing the way for construction to start.<br />
Contractor McAleer &amp; Rushe will deliver the Poland House purpose-built student accommodation development on Stratford High Street in East London.<br />
The sign-off provides the final green light for full construction works, estimated to be valued at &pound;50m, with completion targeted for the 2028/29 academic year.<br />
The development sits close to Q]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mcaleer-amp-rushe-wins-pound50m-london-student-job/</link><pubDate>Mon, 16 Mar 2026 08:05:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mcaleer-amp-rushe-wins-pound50m-london-student-job/</guid></item><item><title><![CDATA[Graham to shape £35m phase 1 Hereford bypass design]]></title><description><![CDATA[Contractor Graham has clinched a pre-construction deal for the &pound;35m first phase of the long-awaited Hereford Western Bypass project.<br />
The firm will now develop the design and delivery strategy for a new 3.6km link road between the A49 and A465.<br />
A separate tender will be launched this summer to appoint the contractor for the full construction package ahead of a planned start on site in December.The revived scheme, previously paused in 2019, has now been rebranded as Phase 1 of the 8km Wester]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-to-shape-35m-phase-1-hereford-bypass-design/</link><pubDate>Sun, 15 Mar 2026 22:36:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-to-shape-35m-phase-1-hereford-bypass-design/</guid></item><item><title><![CDATA[AI project management platform launched for SME contractors]]></title><description><![CDATA[Project management software built with AI at its core has been launched&nbsp;targeting the 98% of UK construction firms that have been priced out of enterprise technology.<br />
Construction AI is aimed at smaller firms who struggle to afford the fees charged by giant software firms.<br />
It has been developed by experienced building director Steve McKenna whose expertise spans quantity surveying, contract administration and construction dispute resolution.<br />
McKenna said: &ldquo;Most smaller firms still run]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ai-project-management-platform-launched-for-sme-contractors/</link><pubDate>Fri, 13 Mar 2026 16:36:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ai-project-management-platform-launched-for-sme-contractors/</guid></item><item><title><![CDATA[Sypro renews software deal with Willmott Dixon]]></title><description><![CDATA[Contract management software specialist Sypro has announced the renewal of its partnership with Willmott Dixon.<br />
Sypro&rsquo;s contract management&nbsp;software &ndash; a project oversight and collaboration hub &ndash; has played a key role in 244 high-value Willmott Dixon projects, spanning New Engineering Contract (NEC),&nbsp;Joint Contracts Tribunal (JCT)&nbsp;and bespoke contract types.<br />
Notable projects&nbsp;include the&nbsp;Grade I listed National Maritime Museum, which was successfully comp]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/sypro-renews-software-deal-with-willmott-dixon/</link><pubDate>Fri, 13 Mar 2026 16:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/sypro-renews-software-deal-with-willmott-dixon/</guid></item><item><title><![CDATA[TCC adds expertise to Upminster Travelodge site]]></title><description><![CDATA[A new 82-bedroom hotel is taking shape in Greater London, with help from a leading Birmingham-based construction consultancy.<br />
The Construction Consultants (TCC) has been appointed to support the development of a new &pound;8.6m Travelodge in Upminster in the London Borough of Havering.<br />
TCC is providing contract administrator and quantity surveying services to the creation of the new hotel in Station Road. It will be Travelodge&rsquo;s 86th hotel in London, and add to the hotel chain&rsquo;s port]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tcc-adds-expertise-to-upminster-travelodge-site/</link><pubDate>Fri, 13 Mar 2026 15:43:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tcc-adds-expertise-to-upminster-travelodge-site/</guid></item><item><title><![CDATA[Berkeley holds profit forecast despite global turmoil]]></title><description><![CDATA[London-focused house builder Berkeley Group has reaffirmed its &pound;450m pre-tax profit target for the current financial year despite warning that geopolitical tensions, stubborn inflation risks and regulatory delays continue to weigh on the housing market.<br />
In a trading update covering the period from November to the end of February, the house builder said it still expects to deliver around &pound;450m pre-tax profit this year and a similar level in 2027.<br />
The group is also targeting a year-end]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/berkeley-holds-profit-forecast-despite-global-turmoil/</link><pubDate>Fri, 13 Mar 2026 13:01:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/berkeley-holds-profit-forecast-despite-global-turmoil/</guid></item><item><title><![CDATA[Framework orders lift Tomlinson turnover to £93m]]></title><description><![CDATA[Derby contractor G F Tomlinson has grown turnover by 16% as a steady stream of public sector framework work underpinned trading during the year to June 2025.<br />
Revenue climbed to &pound;93m as the regional builder continued to rely on programmes such as Scape, Pagabo and Construction West Midlands for a consistent flow of education, civic and health schemes.<br />
Pre-tax profit edged up to &pound;1.17m from &pound;1.01m with operating margin largely unchanged at around 1.1%, highlighting how margins ac]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/framework-orders-lift-tomlinson-turnover-to-93m/</link><pubDate>Fri, 13 Mar 2026 11:41:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/framework-orders-lift-tomlinson-turnover-to-93m/</guid></item><item><title><![CDATA[Wet winter and nervous clients hit construction workload]]></title><description><![CDATA[The construction industry endured a soggy and sluggish start to the year, with official figures showing output continued to slide in the three months to January as wet weather and weak business confidence hit activity.<br />
Total construction output is estimated to have fallen by 2% over the three-month period, reinforcing concerns that the industry entered 2026 on the back foot.<br />
The downturn was driven mainly by a drop in new work, which fell 3.2% over the period, while repair and maintenance activi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wet-winter-and-nervous-clients-hit-construction-workload/</link><pubDate>Fri, 13 Mar 2026 08:44:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wet-winter-and-nervous-clients-hit-construction-workload/</guid></item><item><title><![CDATA[VolkerFitzpatrick wins Didcot Science Bridge]]></title><description><![CDATA[VolkerFitzpatrick has been awarded the contract by&nbsp;Oxfordshire County Council to build the Didcot Science Bridge.<br />
It is the latest deal under a &pound;332m scheme to improve infrastructure around Didcot.<br />
GRAHAM is undertaking the detailed design of the Culham river crossing and the Clifton Hampden bypass elements of the scheme.VolkerFitzpatrick will create a dual carriageway along the A4130 east of the A34 Milton Interchange and a new single carriageway bridge across the railway line and Mi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/volkerfitzpatrick-wins-didcot-science-bridge/</link><pubDate>Fri, 13 Mar 2026 08:38:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/volkerfitzpatrick-wins-didcot-science-bridge/</guid></item><item><title><![CDATA[Cardiff clears path for Wales’ tallest tower]]></title><description><![CDATA[Plans to build a 50-storey skyscraper in central Cardiff that will become the tallest building in Wales have gained planning.<br />
REAP 3, a subsidiary of specialist build to rent developer BlueCastle Capital, aims to replace its previously approved 35-storey scheme with a much taller mixed-use tower next to Cardiff Central Station and the Principality Stadium.<br />
This new approved proposal includes 528 build-to-rent flats, made up of 344 one-beds and 184 two-beds, along with an assoctaed two-story Pavi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cardiff-clears-path-for-wales-tallest-tower/</link><pubDate>Fri, 13 Mar 2026 08:18:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cardiff-clears-path-for-wales-tallest-tower/</guid></item><item><title><![CDATA[Vistry eyes summer start for Camden estate rebuild]]></title><description><![CDATA[Vistry and housing association Riverside have secured planning approval to rebuild the Juniper Crescent Estate at Chalk Farm in London with nearly 480 new homes.<br />
Camden Council&rsquo;s planning committee has backed the regeneration plans for the North London estate, clearing the way for construction to start this summer.<br />
The redevelopment will deliver 478 homes across a mix of social rent, intermediate rent and market sale tenures, with 44% classed as affordable housing.Architect PRP has designe]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-eyes-summer-start-for-camden-estate-rebuild/</link><pubDate>Fri, 13 Mar 2026 08:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-eyes-summer-start-for-camden-estate-rebuild/</guid></item><item><title><![CDATA[Vistry eyes summer start for 480-home Camden estate rebuild]]></title><description><![CDATA[Vistry and housing association Riverside have secured planning approval to rebuild the Juniper Crescent Estate at Chalk Farm in London with nearly 480 new homes.<br />
Camden Council&rsquo;s planning committee has backed the regeneration plans for the North London estate, clearing the way for construction to start this summer.<br />
The redevelopment will deliver 478 homes across a mix of social rent, intermediate rent and market sale tenures, with 44% classed as affordable housing.Architect PRP has designe]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-eyes-summer-start-for-480-home-camden-estate-rebuild/</link><pubDate>Fri, 13 Mar 2026 08:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-eyes-summer-start-for-480-home-camden-estate-rebuild/</guid></item><item><title><![CDATA[Morgan Sindall starts delayed £29m Newcastle leisure centre]]></title><description><![CDATA[Construction has finally started on Newcastle&rsquo;s long-awaited &pound;29m Outer West Leisure Centre in West Denton &ndash; nearly six years after the area&rsquo;s previous swimming pool closed.<br />
Morgan Sindall has finally broken ground on the new complex, with activity on site set to ramp up in the coming weeks and completion expected in late 2027.<br />
The project replaces the former West Denton pool built in the 1960s, which shut during the pandemic and never reopened.The new leisure centre will]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-starts-delayed-29m-newcastle-leisure-centre/</link><pubDate>Thu, 12 Mar 2026 16:53:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-starts-delayed-29m-newcastle-leisure-centre/</guid></item><item><title><![CDATA[Mace and Arup land roles for UK’s first small modular reactor]]></title><description><![CDATA[Mace and Arup have been brought in to help shape the early engineering and delivery strategy for the UK&rsquo;s first small modular reactor project at Wylfa in North Wales.<br />
Great British Energy&ndash;Nuclear has appointed Arup to lead early phase foundation engineering, while Mace will bring programme management expertise for the Anglesey scheme.<br />
They will work alongside Gleeds, LDA Design and T&Uuml;V S&Uuml;D Nuclear Technologies to develop the site&rsquo;s first integrated design.The team wil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mace-and-arup-land-roles-for-uks-first-small-modular-reactor/</link><pubDate>Thu, 12 Mar 2026 16:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mace-and-arup-land-roles-for-uks-first-small-modular-reactor/</guid></item><item><title><![CDATA[Green light for Sheffield Cole Brothers store revival]]></title><description><![CDATA[Urban Splash has secured planning approval to revive Sheffield&rsquo;s landmark Cole Brothers department store, kick-starting the transformation of one of the city centre&rsquo;s most prominent vacant buildings.<br />
The Grade II-listed 1963 building at Barker&rsquo;s Pool will be converted into a mixed-use destination combining leisure, food and drink, retail and flexible workspace under plans designed by AHMM.<br />
Urban Splash was selected by Sheffield City Council to lead the revival of the landmark b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-sheffield-cole-brothers-store-revival/</link><pubDate>Thu, 12 Mar 2026 15:49:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-sheffield-cole-brothers-store-revival/</guid></item><item><title><![CDATA[Green light for Sheffield Cole Brother store revival]]></title><description><![CDATA[Urban Splash has secured planning approval to revive Sheffield&rsquo;s landmark Cole Brothers department store, kick-starting the transformation of one of the city centre&rsquo;s most prominent vacant buildings.<br />
The Grade II-listed 1963 building at Barker&rsquo;s Pool will be converted into a mixed-use destination combining leisure, food and drink, retail and flexible workspace under plans designed by AHMM.<br />
Urban Splash was selected by Sheffield City Council to lead the revival of the landmark b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-sheffield-cole-brother-store-revival/</link><pubDate>Thu, 12 Mar 2026 15:49:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-sheffield-cole-brother-store-revival/</guid></item><item><title><![CDATA[Former facade boss Lee Marks joins Skanska]]></title><description><![CDATA[Lee Marks is joining Skanska UK next week as Executive Vice President and new leader of the Building business.<br />
He will take over the reins over the next few months from Terry Muckian who will assume executive responsibility at the Infrastructure operations and Cementation Skanska.<br />
Marks&rsquo; last major industry role was as COO at facade speciailist Permasteelisa which he left late last year.Prior to that he held senior roles at NG Bailey, Laing O&rsquo;Rourke and Galliford Try.<br />
Marks also led]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/former-facade-boss-lee-marks-joins-skanska/</link><pubDate>Thu, 12 Mar 2026 13:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/former-facade-boss-lee-marks-joins-skanska/</guid></item><item><title><![CDATA[Vistry boss buys £893k shares after stock slide]]></title><description><![CDATA[Vistry chairman and CEO Greg Fitzgerald has moved to back the business with his own money, snapping up &pound;893,000 of shares just days after the house builder&rsquo;s stock was hammered on margin fears and news of his retirement.<br />
Fitzgerald bought 219,377 shares at &pound;4.072 each yesterday, lifting his total holding to 1,509,167 shares, equal to around 0.47% of voting rights.<br />
The dealing comes after Vistry shares slumped more than 20% last week to a near-decade low after the group warned 2]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-boss-buys-893k-shares-after-stock-slide/</link><pubDate>Thu, 12 Mar 2026 08:50:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-boss-buys-893k-shares-after-stock-slide/</guid></item><item><title><![CDATA[CITB accused of cutting cash for small contractors]]></title><description><![CDATA[The CITB is coming under fire again after announcing more changes to how it hands cash back to contractors.<br />
From April only micro, small, and medium size employers can use the Employer Networks funding route.<br />
The annual budget for the programme has been set at &pound;11.5m for the upcoming financial year with an annual cap on claims for smaller firms of between &pound;1,500 and &pound;4,500.The previous cap was &pound;15,000 and the Enquirer has asked CITB for details of how the total &pound;11.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/citb-accused-of-cutting-cash-for-small-contractors/</link><pubDate>Thu, 12 Mar 2026 08:43:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/citb-accused-of-cutting-cash-for-small-contractors/</guid></item><item><title><![CDATA[Morgan Sindall submits Crystal Palace refurb plans]]></title><description><![CDATA[Morgan Sindall has submitted plans for a transformation of the Crystal Palace National Sports Centre.<br />
The refurbishment project has been procured using the Southern Construction Framework (SCF), with Morgan Sindall appointed main contractor.<br />
Plans will rejuvenate the sports centre &ndash; which originally opened in 1964 &ndash; by bringing the 15-hectare site up to a modern standard while showcasing its heritage and historic features.This will include enhancing facilities to support sports from]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-submits-crystal-palace-refurb-plans/</link><pubDate>Thu, 12 Mar 2026 08:26:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-submits-crystal-palace-refurb-plans/</guid></item><item><title><![CDATA[£25m Dartford town centre housing job heads for tender]]></title><description><![CDATA[Dartford Borough Council is preparing to launch the contest for a contractor to deliver a &pound;25m town centre housing scheme after submitting a planning application for the long-awaited Westgate Village redevelopment.<br />
The council has lodged plans to transform the derelict former Co-op site between Spital Street and Hythe Street into a new neighbourhood delivering 69 homes across a mix of blocks rising to 4 storeys and town houses.<br />
Around 22,000 sq ft of Class E commercial space will also be d]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/25m-dartford-town-centre-housing-job-heads-for-tender/</link><pubDate>Thu, 12 Mar 2026 08:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/25m-dartford-town-centre-housing-job-heads-for-tender/</guid></item><item><title><![CDATA[UK’s biggest AI data centre plan approved]]></title><description><![CDATA[Plans to build the UK&rsquo;s largest data centres near Scunthorpe in North Lincolnshire have gained outline approval.<br />
The massive AI data centre campus would deliver over 1.5m square metres of hyperscale floorspace across a campus of 15 data halls and is expected to cost around &pound;7.5bn to build.<br />
This makes one the most ambitious digital infrastructure projects ever targeting 1,000MW of IT load to serve the accelerating needs of artificial intelligence and cloud computing.<br />
The project is fr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/uks-biggest-ai-data-centre-plan-approved/</link><pubDate>Thu, 12 Mar 2026 08:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/uks-biggest-ai-data-centre-plan-approved/</guid></item><item><title><![CDATA[Galliford back in affordable housing with £28m Chester job]]></title><description><![CDATA[Galliford Try has secured a &pound;28m contract to deliver 126 social rent flats at the City Place development in Chester for Clarion Housing Group.<br />
The job marks the contractor&rsquo;s first standalone affordable housing scheme exiting the sector over six years ago as part of the terms of a deal with Vistry to buy its affording housing and Linden Homes business for &pound;1.1bn.Located beside the Shropshire Union Canal and close to the Grade II-listed Chester Shot Tower, the development will de]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-back-in-affordable-housing-with-28m-chester-job/</link><pubDate>Wed, 11 Mar 2026 17:26:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-back-in-affordable-housing-with-28m-chester-job/</guid></item><item><title><![CDATA[Data centre sites to jump queue for grid connections]]></title><description><![CDATA[Planned data centre schemes will be prioritised for grid connections under new government proposals.<br />
The move is part of a proposed revamp of how grid connection requests are handled after the current system was swamped with speculative applications from developers.<br />
Applications grew 450% last year leaving some developments a 15-year wait to hook-up to the national energy grid.Under the changes schemes like data centres&nbsp;and AI&nbsp;Growth&nbsp;Zones,&nbsp;EV charging hubs and electrified in]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/data-centre-sites-to-jump-queue-for-grid-connections/</link><pubDate>Wed, 11 Mar 2026 11:51:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/data-centre-sites-to-jump-queue-for-grid-connections/</guid></item><item><title><![CDATA[Birmingham sets out high-rise city centre vision]]></title><description><![CDATA[Birmingham has unveiled a major regeneration blueprint centred on the HS2 Curzon Street station that could deliver more than 5,000 new homes alongside a huge new commercial district in the city centre.<br />
The Central Heart prospectus, launched to global investors at MIPIM, sets out plans to transform around four hectares of under-used retail and office space into a high-rise neighbourhood.<br />
Across a cluster of redevelopment sites, the vision includes up to 400,000 sq m of commercial floorspace, spac]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/birmingham-sets-out-high-rise-city-centre-vision/</link><pubDate>Wed, 11 Mar 2026 09:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/birmingham-sets-out-high-rise-city-centre-vision/</guid></item><item><title><![CDATA[Forterra ‘insulated’ from Iran war gas price shocks]]></title><description><![CDATA[Materials giant Forterra said it is covered for short-term gas supplies as energy prices continue to fluctuate during the ongoing war with Iran.<br />
In its full-year results Forterra said: &ldquo;We have around 80% of our gas usage secured for the remainder of 2026 with the month of March 100% covered, insulating us somewhat from the current price volatility caused by the situation in the Middle East.&ldquo;We also have a good level of layered coverage beyond this, with around 70% of our usage secur]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/forterra-insulated-from-iran-war-gas-price-shocks/</link><pubDate>Wed, 11 Mar 2026 09:00:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/forterra-insulated-from-iran-war-gas-price-shocks/</guid></item><item><title><![CDATA[Balfour Beatty construction margin hits 3.5%]]></title><description><![CDATA[Balfour Beatty&rsquo;s UK construction business fired on all cylinders last year as booming energy work helped push margin through the 3% barrier and drove a record &pound;22.7bn order book across the group.<br />
The contractor posted a standout performance from its home construction arm, where turnover rose 3% to &pound;3.1bn and operating profit jumped 36% to &pound;110m.<br />
Margin climbed to 3.5% from 2.7%, beating the division&rsquo;s long-running 3% target a year ahead of plan.That stronger UK show]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-construction-margin-hits-35/</link><pubDate>Wed, 11 Mar 2026 08:50:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-construction-margin-hits-35/</guid></item><item><title><![CDATA[Keepmoat and Cussins to complete £200m South Shields site]]></title><description><![CDATA[Keepmoat and Cussins are set to start the final phase of a &pound;200m regeneration scheme in South Tyneside.<br />
The site at Holborn, South Shields has undergone extensive remediation works including decontamination of the ground, raising of the former dry docks to overcome serious flooding issues, and construction of a new quay edge wall.<br />
The civil engineering is now complete and has been handed over to developers for the final phase of house building.Phases one and two have already delivered 135]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keepmoat-and-cussins-to-complete-200m-south-shields-site/</link><pubDate>Wed, 11 Mar 2026 08:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keepmoat-and-cussins-to-complete-200m-south-shields-site/</guid></item><item><title><![CDATA[Plans unveiled for 70-storey Liverpool tower]]></title><description><![CDATA[Designs have been unveiled for a 70-storey tower to form the centrepiece of the &pound;1bn Kings project on the Liverpool waterfront.<br />
The tower, designed by SimpsonHaugh, will comprise a 5-star hotel and luxury residences managed by the hotel operator.<br />
The latest designs&nbsp;come just weeks after the scheme&rsquo;s first tower of 28 storeys, named No. 1 Kings, received consent from Liverpool City Council.Demolition works are set to start this spring for&nbsp;Davos Property Developments Limited]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-unveiled-for-70-storey-liverpool-tower/</link><pubDate>Tue, 10 Mar 2026 19:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-unveiled-for-70-storey-liverpool-tower/</guid></item><item><title><![CDATA[FRC probes accountants over Vistry South division reporting]]></title><description><![CDATA[The Financial Reporting Council has launched an investigation into the conduct of two accountants linked to the financial reporting and forecasting of Vistry Group&rsquo;s South Division.<br />
The probe will examine work connected to the house builder&rsquo;s financial statements for the years ending 31 December 2023 and 31 December 2024.<br />
The regulator confirmed the investigation will be led by the FRC&rsquo;s Executive Counsel.Vistry issued the first of three profit warnings back in October 2024, li]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/frc-probes-accountants-over-vistry-south-division-reporting/</link><pubDate>Tue, 10 Mar 2026 12:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/frc-probes-accountants-over-vistry-south-division-reporting/</guid></item><item><title><![CDATA[North East Mayor to pump cash into arena and film studio jobs]]></title><description><![CDATA[A &pound;104m public funding package to kick-start a new arena, film studios and cultural infrastructure across the North East is set to unlock major construction work starting this summer.<br />
North East Mayor Kim McGuinness said the investment programme would help to unlock a new film studio complex plan for Sunderland and enabling works for a long-planned arena at Gateshead Quays.<br />
The largest single project is the &pound;39m Crown Works Studios development in Sunderland, where construction prepar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/north-east-mayor-to-pump-cash-into-arena-and-film-studio-jobs/</link><pubDate>Tue, 10 Mar 2026 09:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/north-east-mayor-to-pump-cash-into-arena-and-film-studio-jobs/</guid></item><item><title><![CDATA[Two firms and site manager fined after asbestos blunders]]></title><description><![CDATA[Two Midlands companies and a site manager have been sentenced after a large scale asbestos disturbance and illegal clearance operation was carried out at a Cannock demolition site.<br />
Following concerns about unsafe demolition work, an HSE inspector visited a site at Greenheath Road, Cannock on 7 September 2023. The inspector found that demolition had been halted after asbestos was discovered on site.<br />
A subsequent refurbishment and demolition asbestos survey identified 218m&sup2; of asbestos-contai]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/two-firms-and-site-manager-fined-after-asbestos-blunders/</link><pubDate>Tue, 10 Mar 2026 08:58:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/two-firms-and-site-manager-fined-after-asbestos-blunders/</guid></item><item><title><![CDATA[Race starts for £3bn West Midlands framework]]></title><description><![CDATA[The race has started to secure places on the &pound;3bn third-generation Constructing West Midlands framework.<br />
Acivico, owned by Birmingham City Council, is leading procurement of the CWM3 framework alongside partners Solihull and Sandwell councils.<br />
Contractors fighting to renew places include Galliford Try, Morgan Sindall, Willmott Dixon, Speller Metcalfe, Seddon, Interclass and GF Tomlinson.Twenty contractors will be selected to deliver a pipeline of projects spanning education, housing, healt]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/race-starts-for-3bn-west-midlands-framework/</link><pubDate>Tue, 10 Mar 2026 08:45:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/race-starts-for-3bn-west-midlands-framework/</guid></item><item><title><![CDATA[Bid race starts for £3bn West Midlands framework]]></title><description><![CDATA[The race has started to secure places on the &pound;3bn third-generation Constructing West Midlands framework.<br />
Acivico, owned by Birmingham City Council, is leading procurement of the CWM3 framework alongside partners Solihull and Sandwell councils.<br />
Contractors fighting to renew places include Galliford Try, Morgan Sindall, Willmott Dixon, Speller Metcalfe, Seddon, Interclass and GF Tomlinson.Twenty contractors will be selected to deliver a pipeline of projects spanning education, housing, healt]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bid-race-starts-for-3bn-west-midlands-framework/</link><pubDate>Tue, 10 Mar 2026 08:45:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bid-race-starts-for-3bn-west-midlands-framework/</guid></item><item><title><![CDATA[Persimmon brick factory working 24/7 to meet demand]]></title><description><![CDATA[Persimmon&rsquo;s in-house materials are now the preferred choice across the whole business.<br />
The house building giant has boosted production at its Brickworks, Tileworks and Space4 timber frame operations.<br />
At it&rsquo;s latest results Persimmon said: &ldquo;Further investment across all three facilities will also play a pivotal role in supporting our growth ambitions. Our in-house materials are now the preferred choice throughout the business.&ldquo;This approach delivers significant advantages]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/persimmon-brick-factory-working-247-to-meet-demand/</link><pubDate>Tue, 10 Mar 2026 08:40:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/persimmon-brick-factory-working-247-to-meet-demand/</guid></item><item><title><![CDATA[Costain builds record £7bn order book as profit jumps a third]]></title><description><![CDATA[Costain has laid down a strong platform for its next phase of growth after piling up a record &pound;7bn forward work position and lifting operating profit despite a sharp revenue drop in transport.<br />
The firm posted revenue of &pound;1.05bn for the year to 31 December 2025, down 16% from &pound;1.25bn, as lower road and rail activity dragged back the top line.<br />
Pre-tax profit increased 32% to &pound;48m while net cash rose to &pound;189m from &pound;158m. An improvement in cash flow gave the group]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-builds-record-7bn-order-book-as-profit-jumps-a-third/</link><pubDate>Tue, 10 Mar 2026 08:39:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-builds-record-7bn-order-book-as-profit-jumps-a-third/</guid></item><item><title><![CDATA[Market sounding starts on £46m Mid Wales school]]></title><description><![CDATA[Powys County Council has kicked off early contractor engagement for a &pound;46m all-age school project in Mid Wales.<br />
Firms are being invited to take part in discussions ahead of inviting tenders later this year for the new Ysgol Bro Hyddgen development in Machynlleth.<br />
The project will deliver a net-zero operation education campus for 540 pupils on the existing school grounds, replacing outdated buildings currently spread across two sites.The Ysgol Bro Hyddgen scheme already has full planning co]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/market-sounding-starts-on-46m-mid-wales-school/</link><pubDate>Tue, 10 Mar 2026 08:04:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/market-sounding-starts-on-46m-mid-wales-school/</guid></item><item><title><![CDATA[£150m Cambridge to Cambourne busway job heads for tender]]></title><description><![CDATA[Cambridgeshire County Council is preparing to invite bids for the construction of the &pound;150m Cambourne to Cambridge busway and park-and-ride scheme.<br />
The council plans to invite tender in May for the major transport project, which forms a key part of the Greater Cambridge Sustainable Transport Programme.<br />
The scheme will deliver a new dedicated busway linking the fast-growing settlement of Cambourne with Cambridge, alongside a new park-and-ride site aimed at cutting congestion on the A428 cor]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/150m-cambridge-to-cambourne-busway-job-heads-for-tender/</link><pubDate>Mon, 09 Mar 2026 02:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/150m-cambridge-to-cambourne-busway-job-heads-for-tender/</guid></item><item><title><![CDATA[Muse gets green light for office-to-apartments conversion]]></title><description><![CDATA[The latest two blocks have been given the go-ahead as part of the &pound;500m regeneration of Wythenshawe in Manchester.<br />
Developer Muse and Wythenshawe Community Housing Group submitted three separate planning applications for 422 new affordable homes in December 2025.<br />
Now, works on two of the three new communities &ndash; C2 The Birtles and Brotherton House &ndash; can begin, with the third &ndash; Alpha House &ndash; expected to get the green light in the coming weeks.Brotherton House, a forme]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/muse-gets-green-light-for-office-to-apartments-conversion/</link><pubDate>Sun, 08 Mar 2026 23:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/muse-gets-green-light-for-office-to-apartments-conversion/</guid></item><item><title><![CDATA[Manchester city council JV to build 1,600 homes]]></title><description><![CDATA[Manchester City Council is lining up a new joint venture with the Greater Manchester Pension Fund to accelerate development of 1,600 homes on council-owned brownfield land over the next decade.<br />
The partnership will drive the next phase of schemes under the council&rsquo;s This City housing company, targeting a pipeline of seven sites in north, east and central Manchester.<br />
The collaboration agreement will go before the council&rsquo;s executive for approval at the end of this week.The next scheme]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/manchester-city-council-jv-to-build-1600-homes/</link><pubDate>Sun, 08 Mar 2026 17:40:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/manchester-city-council-jv-to-build-1600-homes/</guid></item><item><title><![CDATA[Graham set for £100m Cardiff Crossrail phase one]]></title><description><![CDATA[Graham is set to be officially signed as principal contractor to build the first phase of Cardiff&rsquo;s long-planned Crossrail tram-train network linking the city centre with Cardiff Bay.<br />
Cardiff Council will ask cabinet members on 19 March to rubberstamp Graham&rsquo;s appointment and finalise the contract value for the opening stage of the scheme.<br />
This would allow construction to begin this summer.<br />
The first phase of the project is backed by &pound;100m in joint funding from the Welsh Govern]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-set-for-100m-cardiff-crossrail-phase-one/</link><pubDate>Sun, 08 Mar 2026 16:55:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-set-for-100m-cardiff-crossrail-phase-one/</guid></item><item><title><![CDATA[Worker electrocuted after cherry picker hits power line]]></title><description><![CDATA[Two companies have been fined after an employee was killed and a colleague left with life-altering injuries when a cherrypicker collided with an overhead powerline.<br />
Willand O&amp;M Ltd and New Wave Marine Ltd were sentenced at Exeter Crown Court last week following an incident on 1 June 2020 at the Willand Biogas site in Devon.<br />
Carl Parsons, 34, was electrocuted and colleague Luke Madavan was left with life-changing injuries.Described by his family as funny, loving, kind and a fantastic father,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-electrocuted-after-cherry-picker-hits-power-line/</link><pubDate>Sun, 08 Mar 2026 16:40:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-electrocuted-after-cherry-picker-hits-power-line/</guid></item><item><title><![CDATA[Go-ahead for 2,300-home scheme at former GSK London HQ]]></title><description><![CDATA[Developer Hadley Property Group has gained planning for a large-scale redevelopment of the former GlaxoSmithKline headquarters in Brentford, West London.<br />
The ambitious scheme at 980 Great West Road spans 13 acres and will see over 2,300 homes built across a mix of tenures, with 35% classed as affordable.<br />
The plans also include around 330,000 sq ft of commercial and retail space, creating a new mixed-use neighbourhood along the M4 corridor.Former Glaxo HQ building at redevelopment site where 96%]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-2300-home-scheme-at-former-gsk-london-hq/</link><pubDate>Sun, 08 Mar 2026 16:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-2300-home-scheme-at-former-gsk-london-hq/</guid></item><item><title><![CDATA[Habiko submits first 240-home scheme in Warrington]]></title><description><![CDATA[Affordable homes partnership Habiko has lodged plans for its first housing scheme of 240-home affordable flats in Warrington town centre.<br />
The affordable homes partnership between Muse, Pension Insurance Corporation and Homes England has submitted proposals to Warrington Borough Council to redevelop land off Academy Way, on the site of the former DW Sports building.<br />
The plans would deliver one and two-bed affordable flats across two six-storey buildings arranged around a central landscaped courty]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/habiko-submits-first-240-home-scheme-in-warrington/</link><pubDate>Fri, 06 Mar 2026 08:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/habiko-submits-first-240-home-scheme-in-warrington/</guid></item><item><title><![CDATA[MTX wins £33m Welsh modular hospital revamp]]></title><description><![CDATA[MTX Contracts has been appointed to deliver the &pound;33m transformation of the historic Royal Alexandra Hospital in Rhyl, North Wales.<br />
The main design and build contract awarded by the Betsi Cadwaladr University Health Board for the three-storey 2,500m&sup2; facility will see MTX employ advanced elements of Modern Methods of Construction<br />
MTX has led the scheme through a two-stage procurement process under a Pre-Construction Service Agreement (PCSA), working closely with NHS Wales Shared Servic]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mtx-wins-33m-welsh-modular-hospital-revamp/</link><pubDate>Fri, 06 Mar 2026 08:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mtx-wins-33m-welsh-modular-hospital-revamp/</guid></item><item><title><![CDATA[North West landlord unveils £428m contractor panel]]></title><description><![CDATA[North West housing association Regenda has picked a raft of contractors for a &pound;428m works and consultancy framework covering construction, refurbishment and professional services across northern England and North Wales.<br />
The four-year framework, set up with Rise Construction Framework, will support projects across Merseyside, Cheshire, Lancashire, Cumbria and Greater Manchester as well as North Wales and Yorkshire.<br />
The biggest slice of work sits in the general construction lot, where 38 fir]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/north-west-landlord-unveils-428m-contractor-panel/</link><pubDate>Fri, 06 Mar 2026 08:05:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/north-west-landlord-unveils-428m-contractor-panel/</guid></item><item><title><![CDATA[McLaren tops contracts league on data boom]]></title><description><![CDATA[McLaren Construction surged to the top of the contractor league tables in February after landing a &pound;500m deal to build a major datacentre campus in East London.<br />
The firm has secured a shell and core contract to deliver the first of three giant datacentre buildings at Ada Infrastructure&rsquo;s Docklands campus, propelling it to the number one spot in the monthly rankings.<br />
Sisk ran McLaren close in a strong month for big-ticket project wins. The contractor secured two major schemes worth an]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-tops-contracts-league-on-data-boom/</link><pubDate>Fri, 06 Mar 2026 08:01:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-tops-contracts-league-on-data-boom/</guid></item><item><title><![CDATA[Probe launched after Falcon tower crane collapse]]></title><description><![CDATA[Full details have been confirmed of the crane collapse in west London on Wednesday first reported by the Enquirer.<br />
The failed machine was a luffing jib tower crane on hire from Falcon Cranes working on a Hill Group housing job at Barlby Road for Kensington and Chelsea Council.<br />
A spokesperson from The Hill Group said: &ldquo;On 4 March, an incident occurred at our Barlby Road site, being constructed on behalf of the Royal Borough of Kensington and Chelsea, involving the jib of a tower crane becom]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/probe-launched-after-falcon-tower-crane-collapse/</link><pubDate>Fri, 06 Mar 2026 05:28:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/probe-launched-after-falcon-tower-crane-collapse/</guid></item><item><title><![CDATA[Housing drags down fledgling construction recovery]]></title><description><![CDATA[Construction buyers have reported an accelerated downturn in February sinking signs of a recovery at the start of this year.<br />
The bellwether S&amp;P Global UK Construction Purchasing Managers&rsquo; Index (PMI) registered 44.5 in February &ndash; down from January&rsquo;s seven-month high (46.4) and the 14th consecutive monthly fall.<br />
Residential building remained the weakest-performing segment in February (index at 37.0) and the rate of decline accelerated since January.Commercial construction ac]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/housing-drags-down-fledgling-construction-recovery/</link><pubDate>Thu, 05 Mar 2026 11:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/housing-drags-down-fledgling-construction-recovery/</guid></item><item><title><![CDATA[Taylor Wimpey to spend £150m this year on safety defects backlog]]></title><description><![CDATA[House builder Taylor Wimpey plans to spend around &pound;150m this year fixing fire safety defects as it ramps up remediation work to fix a backlog of fire safety work.<br />
The firm has now revealed that previously hidden defects involving cavity barriers behind brickwork and render account for up to two-thirds of the steep &pound;222m hike in its cladding remediation provision last year.<br />
The problems only emerged after intrusive investigations and updated Fire Risk Appraisal of External Walls (FRAE]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/taylor-wimpey-to-spend-150m-this-year-on-safety-defects-backlog/</link><pubDate>Thu, 05 Mar 2026 09:10:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/taylor-wimpey-to-spend-150m-this-year-on-safety-defects-backlog/</guid></item><item><title><![CDATA[Tower crane collapses in London]]></title><description><![CDATA[A tower crane jib is understood to have collapsed on a site in west London on Wednesday.<br />
Site photos shared with the Enquirer show the aftermath of the failure on the residential site.<br />
No-one is believed to have been injured in the incident.<br />
The Enquirer has contacted firms understood to have been involved for comment.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tower-crane-collapses-in-london/</link><pubDate>Thu, 05 Mar 2026 09:07:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tower-crane-collapses-in-london/</guid></item><item><title><![CDATA[Near-1,000 homes approved for Isle of Dogs site]]></title><description><![CDATA[London&rsquo;s Tower Hamlets council has approved plans for a near-1,000 home twin-tower scheme on the Isle of Dogs at Mastmaker Court in Millharbour.<br />
The hybrid planning application will see two existing warehouse buildings demolished and replaced with two residential towers delivering co-living and affordable housing alongside community and education facilities.<br />
The development has been designed architect Squire &amp; Partners for site owner Pirin Limited and its development partner Fifth Stat]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/near-1000-homes-approved-for-isle-of-dogs-site/</link><pubDate>Thu, 05 Mar 2026 08:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/near-1000-homes-approved-for-isle-of-dogs-site/</guid></item><item><title><![CDATA[Keltbray lays foundation for HS2 Curzon Street station]]></title><description><![CDATA[HS2 has reached a major construction milestone at its Birmingham terminus after completing the last of 2,011 concrete piles that will support the foundations of Curzon Street station.<br />
The huge piling programme, delivered by the Mace Dragados joint venture with Keltbray marks the end of a critical substructure phase on the 400m-long city centre station.<br />
Each reinforced concrete pile has been sunk between 6m and 24m deep into the ground to form the backbone of the new seven-platform terminus, whic]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keltbray-lays-foundation-for-hs2-curzon-street-station/</link><pubDate>Thu, 05 Mar 2026 08:12:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keltbray-lays-foundation-for-hs2-curzon-street-station/</guid></item><item><title><![CDATA[Go-ahead for Preston 500-home plan at shopping precint]]></title><description><![CDATA[Plans to bulldoze Preston&rsquo;s ageing St John&rsquo;s Shopping Centre and replace it with three residential towers, shops and a new NHS health hub have been given the green light.<br />
Members of Preston City Council&rsquo;s planning committee have just backed the scheme with outline consent, clearing the way for a major reset of the city centre site after more than 60 years of retail use.<br />
Developer Wansfell Ltd will now move forward with outline proposals to demolish the existing precinct and adj]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-preston-500-home-plan-at-shopping-precint/</link><pubDate>Thu, 05 Mar 2026 08:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-preston-500-home-plan-at-shopping-precint/</guid></item><item><title><![CDATA[Go-ahead for Preston 500-home plan at shopping precinct]]></title><description><![CDATA[Plans to bulldoze Preston&rsquo;s ageing St John&rsquo;s Shopping Centre and replace it with three residential towers, shops and a new NHS health hub have been given the green light.<br />
Members of Preston City Council&rsquo;s planning committee have just backed the scheme with outline consent, clearing the way for a major reset of the city centre site after more than 60 years of retail use.<br />
Developer Wansfell Ltd will now move forward with outline proposals to demolish the existing precinct and adj]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-preston-500-home-plan-at-shopping-precinct/</link><pubDate>Thu, 05 Mar 2026 08:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/go-ahead-for-preston-500-home-plan-at-shopping-precinct/</guid></item><item><title><![CDATA[John F Hunt wins Euston Tower demolition]]></title><description><![CDATA[John F Hunt has been appointed by British Land under a PCSA to undertake the demolition and deconstruction package for the redevelopment of London&rsquo;s Euston Tower site.<br />
The specialist previously completed the soft strip back in 2024 and will now bring down the 36-storey building bar the reinforced concrete core which will be retained to its full 126 metres in height.<br />
To enable this, a complex temporary works scheme has been designed by the John F Hunt engineering consultancy RKD, to strengt]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-wins-euston-tower-demolition/</link><pubDate>Wed, 04 Mar 2026 15:33:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/john-f-hunt-wins-euston-tower-demolition/</guid></item><item><title><![CDATA[GMI confirmed for green Manchester office scheme]]></title><description><![CDATA[Developer Bywater has confirmed&nbsp; GMI Construction Group as main contractor at 35 Fountain Street &ndash; a new&#8209;build scheme claimed to be the city&rsquo;s most sustainable office block.<br />
Designed by Bennetts Associates, the building will retain the existing steel frame while incorporating a hybrid structure featuring cross&#8209;laminated timber (CLT) to reduce embodied carbon.<br />
The scheme will comprise 87,000 sq ft across basement, ground and eight upper floors, including two newly con]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gmi-confirmed-for-green-manchester-office-scheme/</link><pubDate>Wed, 04 Mar 2026 12:37:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gmi-confirmed-for-green-manchester-office-scheme/</guid></item><item><title><![CDATA[Former Balfour chief to become Barratt Redrow CEO]]></title><description><![CDATA[Barratt Redrow has appointed Dean Banks as its next Group Chief Executive.<br />
He will join the Group in the final quarter of 2026 and succeed David Thomas who has decided to retire from the business after 11 years as Group Chief Executive and 17 years with the group.<br />
Banks will join from Australian infrastructure specialist Ventia where he has served as Group Chief Executive since 2021.Prior to that Banks was CEO for UK Construction Services at Balfour Beatty.<br />
Banks said: &ldquo;I am proud and priv]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/former-balfour-chief-to-become-barratt-redrow-ceo/</link><pubDate>Wed, 04 Mar 2026 09:15:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/former-balfour-chief-to-become-barratt-redrow-ceo/</guid></item><item><title><![CDATA[Bouygues E&amp;S contracting arm reborn as Equans Sci-Tech]]></title><description><![CDATA[Bouygues Energies &amp; Services Contracting arm has been rebranded as Equans Sci-Tech in a move designed to target the UK&rsquo;s fast-growing life sciences, technology and advanced manufacturing sectors.<br />
The business, now fully integrated into Equans following its acquisition by Bouygues Group in October 2022, will operate as a single-source specialist for mission-critical environments from bases in Glasgow and Manchester.<br />
The refreshed brand will focus on laboratories, cleanrooms and advanced]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bouygues-eamps-contracting-arm-reborn-as-equans-sci-tech/</link><pubDate>Wed, 04 Mar 2026 09:13:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bouygues-eamps-contracting-arm-reborn-as-equans-sci-tech/</guid></item><item><title><![CDATA[Trio bag £1bn concrete road replacement deal]]></title><description><![CDATA[Kier, Graham and Sisk have secured a new six-year framework to rebuild England&rsquo;s ageing concrete motorway and trunk road network.<br />
National Highways&rsquo; near &pound;1bn Legacy Concrete Roads Reconstruction framework will run from 2026 to 2032, spanning RIS3 and the start of RIS4, and will drive a major rebuild of England&rsquo;s roads.<br />
So-called &ldquo;legacy&rdquo; concrete roads &ndash; largely built in the 1960s and 1970s &ndash; are concentrated along the eastern side of England, inc]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/trio-bag-1bn-concrete-road-replacement-deal/</link><pubDate>Wed, 04 Mar 2026 09:12:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/trio-bag-1bn-concrete-road-replacement-deal/</guid></item><item><title><![CDATA[Galliford Try lifts full-year outlook after 20% profit surge]]></title><description><![CDATA[Galliford Try has powered through the first half with a 20% surge in pre-tax profit and margins edging closer to its 2030 target of 4%.<br />
With 98% of this year&rsquo;s orders in hand and improving markets in both building and infrastructure, the contractor said it expected full-year results to exceed market forecasts.<br />
Pre-tax profit climbed by nearly 22% to &pound;24m for the six months to 31 December 2025, on revenue up 1.3% to &pound;935m.<br />
Chief executive Bill Hocking said: &ldquo;I&rsquo;m most]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-lifts-full-year-outlook-after-20-profit-surge/</link><pubDate>Wed, 04 Mar 2026 09:03:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-lifts-full-year-outlook-after-20-profit-surge/</guid></item><item><title><![CDATA[Vistry boss Greg Fitzgerald announces retirement]]></title><description><![CDATA[Greg Fitzgerald is retiring from house builder Vistry.<br />
He will step down as Chair in May but will continue to serve as CEO for up to 12 months, or until a successor is appointed.<br />
Fitzgerald was Chief Executive of Galliford Try PLC from 2005 to 2015, having previously been Managing Director of its house building division. Prior to this, he was a founder and later, Managing Director of Midas Homes, which was acquired by Galliford Try in 1997.As Chief Executive, he transformed Galliford Try from a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/vistry-boss-greg-fitzgerald-announces-retirement/</link><pubDate>Wed, 04 Mar 2026 08:39:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/vistry-boss-greg-fitzgerald-announces-retirement/</guid></item><item><title><![CDATA[Consultation to start on merging CITB and ECITB]]></title><description><![CDATA[The government has announced that it will consult industry on the principle of the Engineering Construction Industry Training Board (ECITB) and the Construction Industry Training Board (CITB) forming a single training body.<br />
The consultation is expected to run over 12 weeks and will be launched later this month.<br />
Tim Balcon CEO of the CITB said: &ldquo;Regardless of the outcome we must continue to work to tackle the joint needs of industry &ndash; we need to be providing standardised levels of com]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/consultation-to-start-on-merging-citb-and-ecitb/</link><pubDate>Wed, 04 Mar 2026 08:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/consultation-to-start-on-merging-citb-and-ecitb/</guid></item><item><title><![CDATA[Galliford Try lands £16m Hartlepool school rebuild]]></title><description><![CDATA[Galliford Try has secured a &pound;16m contract to rebuild St Helens Primary School in Hartlepool as a net zero carbon in operation scheme.<br />
The job has been awarded to Galliford Try Building North East and Yorkshire by the Department for Education and the Northern Lightings Learning Trust.<br />
The Headland-based school caters for 374 pupils, including additional resourced provision for 25 young people with Special Educational Needs.The replacement two-storey building will be delivered as a cost pilo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-lands-16m-hartlepool-school-rebuild/</link><pubDate>Tue, 03 Mar 2026 15:45:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-lands-16m-hartlepool-school-rebuild/</guid></item><item><title><![CDATA[£231m London Barbican Arts Centre overhaul approved]]></title><description><![CDATA[The &pound;231m overhaul of the Barbican Arts Centre in London has been given planning and listed building consent, clearing the way for a major retrofit of one of Britain&rsquo;s best-known post-war landmarks.<br />
The go-ahead from the City of London Corporation unlocks long-awaited works to tackle ageing building fabric, poor accessibility and outdated infrastructure across the Grade II-listed Brutalist complex.<br />
The scheme, designed by Allies and Morrison with Asif Khan Studio and engineer Buro Ha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/231m-london-barbican-arts-centre-overhaul-approved/</link><pubDate>Tue, 03 Mar 2026 15:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/231m-london-barbican-arts-centre-overhaul-approved/</guid></item><item><title><![CDATA[Wates veteran to drive Caddick subcontracting growth]]></title><description><![CDATA[Caddick has strengthened its specialist subcontracting businesses with the appointment of Mark Kearney as commercial director for CCL Facades and Caddick Civil Engineering.<br />
Kearney will head up the commercial functions of both businesses, operating from Caddick&rsquo;s Wakefield and Durham offices and working closely with the respective managing directors to position the firms for sustainable growth.<br />
His remit spans key regions including Yorkshire, the North East, North West and Midlands, where]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/wates-veteran-to-drive-caddick-subcontracting-growth/</link><pubDate>Tue, 03 Mar 2026 09:15:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/wates-veteran-to-drive-caddick-subcontracting-growth/</guid></item><item><title><![CDATA[“Energy and optimism” at Kier after strong set of results]]></title><description><![CDATA[New Kier chief executive Stuart Togwell has unveiled a strong set of half-year results and hailed the &ldquo;real energy and optimism&rdquo; across the group.<br />
Results for the six months to December 31 2025 show pre-tax profits up to &pound;32.6m from &pound;28.6m last time as turnover ticked-up to &pound;2bn from &pound;1.97bn.<br />
Kier also hit its target of an average net cash position during the period for the first time in 13 years.<br />
Togwell &ndash; who took over the firm in November &ndash; said]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/energy-and-optimism-at-kier-after-strong-set-of-results/</link><pubDate>Tue, 03 Mar 2026 08:57:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/energy-and-optimism-at-kier-after-strong-set-of-results/</guid></item><item><title><![CDATA[Scottish Water unveils £13.4bn six-year spend plan]]></title><description><![CDATA[Scottish Water has set out a &pound;13.4bn blueprint to protect and upgrade the water and wastewater network between 2027 and 2033.<br />
The publicly-owned utility said the six-year programme will future-proof ageing assets, tackle climate pressures and maintain what it claims are among the lowest charges in the UK.<br />
Of the &pound;13.4bn total, &pound;8bn is earmarked for maintaining and improving pipes, treatment works and other core infrastructure.<br />
The balance will fund operating and essential costs]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/scottish-water-unveils-134bn-six-year-spend-plan/</link><pubDate>Tue, 03 Mar 2026 08:34:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/scottish-water-unveils-134bn-six-year-spend-plan/</guid></item><item><title><![CDATA[Mears offloads education and health FM arm for £18m]]></title><description><![CDATA[Contractor Mears has sold its facilities management arm for &pound;18m to sharpened its focus on housing.<br />
The group has sold Morrison Facilities Services Limited, which delivers FM work mainly across education and health, following a competitive sales process.The disposal completes another step in Mears&rsquo; strategy to concentrate fully on housing services.The business was sold on a debt and cash-free basis with a normal level of working capital.<br />
Mears bought Morrison Facilities Services back]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mears-offloads-education-and-health-fm-arm-for-18m/</link><pubDate>Tue, 03 Mar 2026 08:23:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mears-offloads-education-and-health-fm-arm-for-18m/</guid></item><item><title><![CDATA[BBA standards body has own accreditation suspended]]></title><description><![CDATA[The British Board of Agrement (BBA) has had its accreditation suspended and cannot currently issue safety certificates to building products manufacturers.<br />
The BBA is construction&rsquo;s leading independent certification body with its approval logo seen as demonstrating fitness-for-purpose and compliance with building regulations.<br />
It is overseen by the government appointed UKAS National Accreditation Body which assesses and accredits certification and testing organisations across all industries.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bba-standards-body-has-own-accreditation-suspended/</link><pubDate>Tue, 03 Mar 2026 08:15:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bba-standards-body-has-own-accreditation-suspended/</guid></item><item><title><![CDATA[Galliford Try wins £60m RAF Lakenheath munitions hub]]></title><description><![CDATA[Galliford Try has been picked to deliver a &pound;60m munitions handling facility at RAF Lakenheath in Suffolk.<br />
The job will be delivered for the Defence Infrastructure Organisation on behalf of the United States Air Force, which operates from the RAF Lakenheath base.<br />
The scheme includes three new munitions handling buildings covering storage, testing, maintenance and administrative functions.It marks the first project Galliford Try will deliver directly for the US Air Force, extending its defen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-wins-60m-raf-lakenheath-munitions-hub/</link><pubDate>Mon, 02 Mar 2026 20:10:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/galliford-try-wins-60m-raf-lakenheath-munitions-hub/</guid></item><item><title><![CDATA[E+S slide rail systems now available from AGD]]></title><description><![CDATA[Hire specialist AGD is making a pioneering trench shoring system available to companies across the industry.<br />
E+S invented the first trench shoring systems in Germany in the 1950s. They were the first company to design the slide rail system which facilitates quick and easy installation of small cofferdams and excavation pits up to 9m depth.<br />
AGD&nbsp; has just installed its first slide rail excavation pit and is now offering the system for sale or hire nationwide throughout the UK and&nbsp; Irelan]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/es-slide-rail-systems-now-available-from-agd/</link><pubDate>Mon, 02 Mar 2026 16:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/es-slide-rail-systems-now-available-from-agd/</guid></item><item><title><![CDATA[Bovis seals £200m London Stock Exchange revamp]]></title><description><![CDATA[Bovis Construction has sealed a pre-construction services agreement to deliver a &pound;200m overhaul of the home to the London Stock Exchange.<br />
The contractor beat rival bids from Structure Tone and Wates to secure the job with Oxford Properties and Hines to deliver the refurbishment, extension and full turnkey tenant fitout of the City landmark.<br />
David Cadiot, chief executive officer at Bovis, said: &ldquo;Having successfully completed the original building in 2003, it&rsquo;s a real privilege t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bovis-seals-200m-london-stock-exchange-revamp/</link><pubDate>Mon, 02 Mar 2026 15:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bovis-seals-200m-london-stock-exchange-revamp/</guid></item><item><title><![CDATA[Byrne Group drops O’Keefe Demolition name]]></title><description><![CDATA[Byrne Group has rebranded its O&rsquo;Keefe Demolition &amp; Groundworks business to&nbsp;Byrne Demolition and&nbsp;Byrne Groundworks.<br />
Michael Byrne, Byrne Group Chief Executive, said: &ldquo;This rebrand marks an exciting new chapter as we bring these specialist divisions under the unified Byrne Group banner. The change reflects our strategic intent to create greater integration, efficiency, and alignment across our services &ndash; enhancing our ability to deliver seamlessly across the full bu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/byrne-group-drops-okeefe-demolition-name/</link><pubDate>Mon, 02 Mar 2026 15:09:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/byrne-group-drops-okeefe-demolition-name/</guid></item><item><title><![CDATA[Winners confirmed on £37bn hospital framework]]></title><description><![CDATA[The ten winning contractors have been confirmed for the &pound;37bn Hospital 2.0 Alliance framework.<br />
The winners are:Bovis<br />
Dragados<br />
Integrated Health Projects (IHP) (Sir Robert McAlpine/VINCI)<br />
John Graham<br />
Kier<br />
Laing O&rsquo;Rourke<br />
Morgan Sindall<br />
Sacyr<br />
Skanska<br />
Willmott DixonThe bid race opened 12 months ago and last summer a shortlist of 16 firms was announced.The firms missing out are BAM, Bouyges, FCC, McLaren, Multiplex and Sisk.<br />
Natalie Forrest, Chief Programme Officer at the New Hospital Pro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winners-confirmed-on-37bn-hospital-framework/</link><pubDate>Mon, 02 Mar 2026 12:55:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winners-confirmed-on-37bn-hospital-framework/</guid></item><item><title><![CDATA[Gateway 2 legacy backlog cut to just three cases]]></title><description><![CDATA[The Building Safety Regulator has slashed its Gateway 2 legacy backlog to just three cases after shifting 18 of the most technically challenging schemes into a specialist complex case process.<br />
Fresh figures covering December to 25 February show the long-running pile of historic applications has all but cleared.At the start of December there were 60 legacy cases sitting in the system.<br />
That number has now fallen to three standard cases, with 18 high-risk or technically intricate schemes moved into]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gateway-2-legacy-backlog-cut-to-just-three-cases/</link><pubDate>Mon, 02 Mar 2026 09:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gateway-2-legacy-backlog-cut-to-just-three-cases/</guid></item><item><title><![CDATA[Major circular construction hub opens in Royal Docks]]></title><description><![CDATA[Ambitious plans to create Europe&rsquo;s largest circular construction hub in London&rsquo;s Royal Docks are underway with the opening of the facilities gates today.<br />
The new facility, delivered with Newham Council and climate charity Tipping Point East, will recycle and reuse construction materials that would otherwise head to landfill.<br />
Backers say it will become the largest circular construction hub in Europe once fully operational and forms the first phase of a wider Circular Economy Village p]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/major-circular-construction-hub-opens-in-royal-docks/</link><pubDate>Mon, 02 Mar 2026 08:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/major-circular-construction-hub-opens-in-royal-docks/</guid></item><item><title><![CDATA[Construction covid loan cheat gets six-year director ban]]></title><description><![CDATA[The director of a south London construction company has narrowly avoided jail after admitting exaggerating his company&rsquo;s turnover to claim &pound;150,000 via three Covid Bounce Back Loans.<br />
Adebanjo Adebayo Talabi, from Walworth, was the director of Bebo Construction Limited.<br />
An Insolvency Service investigation found the 42-year-old applied for three loans,&nbsp;between August and November 2020, from three separate banks.On each occasion, the company&rsquo;s turnover had been exaggerated&nb]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-covid-loan-cheat-gets-six-year-director-ban/</link><pubDate>Mon, 02 Mar 2026 08:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-covid-loan-cheat-gets-six-year-director-ban/</guid></item><item><title><![CDATA[Local authorities sitting on £9bn of developer contributions]]></title><description><![CDATA[Local authorities in England and Wales are sitting on &pound;9bn of developer contributions intended to fund essential local infrastructure such as schools, public transport and affordable housing.<br />
The unspent money paid as part of planning agreements for new housing developments includes &pound;6.6bn from Section 106 agreements and over &pound;2.2bn raised through the Community Infrastructure Levy (CIL).<br />
The cash pile was revealed following a Freedom of Information (FOI) survey by the Home Buil]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/local-authorities-sitting-on-9bn-of-developer-contributions/</link><pubDate>Mon, 02 Mar 2026 08:30:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/local-authorities-sitting-on-9bn-of-developer-contributions/</guid></item><item><title><![CDATA[Kier veteran joins RED leadership team]]></title><description><![CDATA[RED Construction Group has drafted in a Kier finance veteran and a hospitality sector specialist as it targets over &pound;200m turnover.<br />
The specialist main contractor has appointed Alastair Gordon-Stewart as its first full-time group finance director and brought in Michael Walsh as strategic director to strengthen its push into the luxury hotel market.<br />
The twin hires come as RED marks its 10-year anniversary and reshapes its senior team to support what it describes as sustainable long-term gro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-veteran-joins-red-leadership-team/</link><pubDate>Mon, 02 Mar 2026 07:57:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-veteran-joins-red-leadership-team/</guid></item><item><title><![CDATA[Kier veteran joins RED boardroom]]></title><description><![CDATA[RED Construction Group has drafted in a Kier finance veteran and a hospitality sector specialist as it targets over &pound;200m turnover.<br />
The specialist main contractor has appointed Alastair Gordon-Stewart as its first full-time group finance director and brought in Michael Walsh as strategic director to strengthen its push into the luxury hotel market.<br />
The twin hires come as RED marks its 10-year anniversary and reshapes its senior team to support what it describes as sustainable long-term gro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-veteran-joins-red-boardroom/</link><pubDate>Mon, 02 Mar 2026 07:57:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-veteran-joins-red-boardroom/</guid></item><item><title><![CDATA[Farrans starts £30m Bristol Airport terminal extension]]></title><description><![CDATA[Farrans has landed a &pound;30m contract to build a two-storey terminal extension at Bristol Airport as the regional hub advances its &pound;400m investment programme.<br />
Work is under way on the infill scheme between the existing terminal and departure gates, increasing capacity to 12 million passengers a year.<br />
Floor space will rise by almost 45%, with 17 new retail and food outlets taking the total to 38. The design includes island retail units, expanded seating and a hidden speakeasy bar.Arrival]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/farrans-starts-30m-bristol-airport-terminal-extension/</link><pubDate>Mon, 02 Mar 2026 07:57:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/farrans-starts-30m-bristol-airport-terminal-extension/</guid></item><item><title><![CDATA[Costain returns to FTSE 250 index]]></title><description><![CDATA[Costain is returning to the FTSE 250 index for the first time in more than 20 years.<br />
The re-entry comes after years of consistent financial performance and ahead of a results announcement for the year ended 31 December 2025 on 10 March 2026.<br />
Alex Vaughan, Chief Executive Officer of Costain, commented: &ldquo;I am extremely proud of the whole Costain team and the role they have played in achieving Costain&rsquo;s return to the FTSE 250.&ldquo;This significant milestone follows what has been a sus]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/costain-returns-to-ftse-250-index/</link><pubDate>Fri, 27 Feb 2026 14:48:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/costain-returns-to-ftse-250-index/</guid></item><item><title><![CDATA[Hill go-ahead for £850m North London estate rebuild]]></title><description><![CDATA[North London council Enfield has given housing contractor Hill the green light to start its major 2,000 home estate rebuild.<br />
Enfield Council cabinet has approved revised phasing for the &pound;850m, 20-year overhaul of the Edmonton estate, clearing the way for construction of the first 270 affordable homes to start in early summer.<br />
In total, the phased redevelopment of the Joyce Avenue and Snell&rsquo;s Park estates will replace 795 ageing properties with modern homes, around half set to be genu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-go-ahead-for-850m-north-london-estate-rebuild/</link><pubDate>Fri, 27 Feb 2026 09:13:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-go-ahead-for-850m-north-london-estate-rebuild/</guid></item><item><title><![CDATA[Orders drop deepens two-speed civils market]]></title><description><![CDATA[Order books across the civils sector have slumped to their weakest position since 2020 despite workloads edging back into growth at the end of last year.<br />
According to the latest work trends survey from the Civil Engineering Contractors Association a balance of 17% of firms reported higher workloads in Q4 than a year ago, reversing the dip seen in Q3.<br />
But order books barely shifted, with a balance of just 3% reporting growth &ndash; the lowest reading since 2020 Q3 and a warning that the forward]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/orders-drop-deepens-two-speed-civils-market/</link><pubDate>Fri, 27 Feb 2026 09:10:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/orders-drop-deepens-two-speed-civils-market/</guid></item><item><title><![CDATA[Materials firms sound alarm to Rachel Reeves]]></title><description><![CDATA[Leading construction materials firms have written to Chancellor Rachel Reeves warning of a looming production crisis in the sector.<br />
The Mineral Products Association letter states: &ldquo;Right now, our industry is struggling badly. We need you to act quickly to stimulate construction activity in order to prevent long term damage to the nation&rsquo;s ability to build.&rdquo;<br />
The MPA has just recorded the fourth consecutive year of a shrinking market for key construction materials leaving sales v]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/materials-firms-sound-alarm-to-rachel-reeves/</link><pubDate>Fri, 27 Feb 2026 08:55:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/materials-firms-sound-alarm-to-rachel-reeves/</guid></item><item><title><![CDATA[Carey Group powers into third year of recovery with 3.5% margin]]></title><description><![CDATA[Carey Group has completed a decisive turnaround with a third straight year of recovery delivering stronger margins, rising profits and a growing cash buffer.<br />
The civils and construction group has posted pre-tax profit of &pound;11.1m for the year to 30 September 2025 up 50% on last year.<br />
Turnover fell 22% to &pound;303m as the firm stuck to strict contract selection and refused to chase revenue at the expense of return.<br />
The strategy saw operating profit climb 40% to &pound;10.6m pushing operatin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/carey-group-powers-into-third-year-of-recovery-with-35-margin/</link><pubDate>Fri, 27 Feb 2026 08:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/carey-group-powers-into-third-year-of-recovery-with-35-margin/</guid></item><item><title><![CDATA[Salford former union HQ to become uni hub]]></title><description><![CDATA[A long-vacant University of Salford building is poised for a comeback after plans were lodged to refurbish Faraday House as part of the &pound;2.5bn Crescent Salford masterplan.<br />
Development partnership ECF has submitted proposals alongside Salford City Council and the University of Salford to transform the building on the A6 next to Irwell Place Car Park.<br />
The scheme sits within the wider 240-acre Crescent Salford regeneration programme reshaping this stretch of the city.Originally built as headq]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/salford-former-union-hq-to-become-uni-hub/</link><pubDate>Fri, 27 Feb 2026 08:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/salford-former-union-hq-to-become-uni-hub/</guid></item><item><title><![CDATA[Blenheim House creditor claims explode to over £60m]]></title><description><![CDATA[Claims from unsecured creditors to administrators of Surrey-based contractor Blenheim House Construction have rocketed to more than &pound;60m &ndash; more than triple the &pound;19m originally flagged when the firm went under.<br />
The surge has all but wiped out earlier hopes of a 10p-in-the-pound return for suppliers and subcontractors.<br />
In a fresh update, administrators from S&amp;W Partners say unsecured claims received to date &ldquo;far exceed&rdquo; the &pound;19m owed to 578 unsecured credito]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/blenheim-house-creditor-claims-explode-to-over-60m/</link><pubDate>Thu, 26 Feb 2026 08:18:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/blenheim-house-creditor-claims-explode-to-over-60m/</guid></item><item><title><![CDATA[John Lewis ditches plan to be house builder]]></title><description><![CDATA[John Lewis Partnership has scrapped its house building arm and pulled the plug on plans to deliver around 1,000 rental homes across three sites, blaming a &ldquo;fundamental shift in economic conditions&rdquo; for the big U-turn on build to rent.<br />
The employee-owned retailer confirmed it is withdrawing from the build-to-rent sector after concluding the numbers no longer stack up in today&rsquo;s higher-rate environment.<br />
The group had secured planning to build above existing Waitrose stores in Bro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/john-lewis-ditches-plan-to-be-house-builder/</link><pubDate>Thu, 26 Feb 2026 08:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/john-lewis-ditches-plan-to-be-house-builder/</guid></item><item><title><![CDATA[Tilbury3 approval shores-up capital’s aggregates supply]]></title><description><![CDATA[The Port of Tilbury has secured outline planning approval for its 143-acre Tilbury3 expansion, unlocking a major new phase of industrial and logistics growth on the Thames.<br />
Thurrock Council&rsquo;s decision clears the way for a flexible, rail-connected port zone capable of handling container operations, large-scale warehousing, vehicle storage and industrial processing.<br />
Crucially for the construction sector, the consent also covers the import, storage and distribution of aggregates and bulk cons]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tilbury3-approval-shores-up-capitals-aggregates-supply/</link><pubDate>Thu, 26 Feb 2026 08:07:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tilbury3-approval-shores-up-capitals-aggregates-supply/</guid></item><item><title><![CDATA[Highland Council names first £2.1bn contract winners]]></title><description><![CDATA[Highland Council has appointed main contractors for the first projects to be delivered under its new &pound;2.1bn Highland Investment Plan (HIP).<br />
Morgan Sindall, Morrison Construction, Robertson Group and Ogilvie will work on seven&nbsp;key&nbsp;multi-million-pound&nbsp;projects across the&nbsp;region&nbsp;from Thurso to Inverness.<br />
The&nbsp;HIP&nbsp;is a &pound;2.1 billion, 20-year capital investment programme led by&nbsp;the&nbsp;Council to deliver improvements to local infrastructure and servi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/highland-council-names-first-21bn-contract-winners/</link><pubDate>Thu, 26 Feb 2026 08:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/highland-council-names-first-21bn-contract-winners/</guid></item><item><title><![CDATA[Mainland Power fits solar system at recycling centre]]></title><description><![CDATA[Mainland Power has completed the design and installation of a full solar panel system on the roof of a plasterboard recycling shed owned by waste management specialist Countrystyle.<br />
Work involved installation of a 680 kWp rooftop solar PV system comprising 1,400 high-efficiency 490W modules, paired with 10 x 60kW SolaX string inverters and full TIGO optimisation across the arrays.<br />
Due to the site&rsquo;s consistently high energy demand, 100% of the energy generated is consumed on site, with the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mainland-power-fits-solar-system-at-recycling-centre/</link><pubDate>Thu, 26 Feb 2026 00:44:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mainland-power-fits-solar-system-at-recycling-centre/</guid></item><item><title><![CDATA[Willmott Dixon wins London Fire Brigade HQ overhaul]]></title><description><![CDATA[Willmott Dixon Interiors has landed the preconstruction role for a major refurbishment of London Fire Brigade&rsquo;s historic headquarters in the heart of the capital at 8 Albert Embankment.<br />
The contractor will take the Grade II listed building through Stage 3 and 4 design ahead of a full overhaul that will bring the 1937 Art Deco landmark back into full use as the Brigade&rsquo;s HQ for around 840 staff.<br />
Plans include full renewal of mechanical, electrical and public health systems, new life s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-wins-london-fire-brigade-hq-overhaul/</link><pubDate>Wed, 25 Feb 2026 15:28:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-wins-london-fire-brigade-hq-overhaul/</guid></item><item><title><![CDATA[Willmott Dixon wins historic London Fire Brigade HQ overhaul]]></title><description><![CDATA[Willmott Dixon Interiors has landed the preconstruction role for a major refurbishment of London Fire Brigade&rsquo;s historic headquarters in the heart of the capital at 8 Albert Embankment.<br />
The contractor will take the Grade II listed building through Stage 3 and 4 design ahead of a full overhaul that will bring the 1937 Art Deco landmark back into full use as the Brigade&rsquo;s HQ for around 840 staff.<br />
Plans include full renewal of mechanical, electrical and public health systems, new life s]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-wins-historic-london-fire-brigade-hq-overhaul/</link><pubDate>Wed, 25 Feb 2026 15:28:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-wins-historic-london-fire-brigade-hq-overhaul/</guid></item><item><title><![CDATA[30 win £655m Metropolitan Housing remediation deal]]></title><description><![CDATA[Metropolitan Housing Trust has appointed 30 contractors to a &pound;655m fire and structural safety remediation framework spanning its housing stock and wider public sector call-offs.<br />
The Southern and East of England social landlord will use the panel to deliver projects from minor works up to major schemes over &pound;5m over the next seven years.<br />
Amber Construction, Equans Regeneration, Higgins, Mulalley &amp; Co and&nbsp;Thomas Sinden are among the firms securing both larger project lots.The]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/30-win-655m-metropolitan-housing-remediation-deal/</link><pubDate>Wed, 25 Feb 2026 15:07:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/30-win-655m-metropolitan-housing-remediation-deal/</guid></item><item><title><![CDATA[Glencar signs deal for Luton industrial scheme]]></title><description><![CDATA[Glencar has has been engaged at pre-construction stage to progress the Hillwood Park Luton scheme through the next phases of detailed design and delivery.<br />
Developer Hillwood has secured planning for the 16 acre site which will contain 284,575 sq ft of new industrial and logistics accommodation across eight Grade-A units.<br />
Construction is expected to begin in March with units ready for early occupation from January 2027.Glencar has worked on other Hillwood schemes in Crewe and Wigan.<br />
Peter Goodman]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/glencar-signs-deal-for-luton-industrial-scheme/</link><pubDate>Wed, 25 Feb 2026 12:40:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/glencar-signs-deal-for-luton-industrial-scheme/</guid></item><item><title><![CDATA[McLaren confirms supply chain for giant data centre]]></title><description><![CDATA[McLaren has confirmed its main supply chain partners after officially signing the shell and core contract to build the first of three giant data centre buildings at Ada Infrastructure&rsquo;s Docklands campus.<br />
McLaren&rsquo;s contract includes the infrastructure for the whole campus and the interface for a future district heating network.<br />
In addition to the three 70 MW data centre buildings, the project features a community multi-purpose facility and enhanced public spaces around the site, inclu]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mclaren-confirms-supply-chain-for-giant-data-centre/</link><pubDate>Wed, 25 Feb 2026 10:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mclaren-confirms-supply-chain-for-giant-data-centre/</guid></item><item><title><![CDATA[Hydrogen deal for Lower Thames Crossing worth £32m]]></title><description><![CDATA[The value of a contract to supply the largest volume of green hydrogen ever produced for a British construction project has been confirmed at &pound;32m.<br />
British specialist GeoPura has landed the deal at National Highways&rsquo; Lower Thames Crossing project which will be the first major British infrastructure project to be carbon neutral in construction.<br />
Diesel will be replaced with hydrogen, electric and other low-carbon fuels across the project.The eight-year deal with GeoPura has already sta]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hydrogen-deal-for-lower-thames-crossing-worth-32m/</link><pubDate>Wed, 25 Feb 2026 09:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hydrogen-deal-for-lower-thames-crossing-worth-32m/</guid></item><item><title><![CDATA[Morgan Sindall tops £5bn revenue as profit jumps over a third]]></title><description><![CDATA[Morgan Sindall Group passed &pound;5bn revenue for the first time last year as margins widened and pre-tax profit leapt 35% to &pound;233m.<br />
Despite wider industry headwinds the firm&rsquo;s order book climbed to a record &pound;19bn including preferred bidder work, mainly on the back of regeneration and construction successes.<br />
The group posted revenue of &pound;5.02bn for the year to 31 December 2025, up 10% on &pound;4.55bn last time.Adjusted operating profit, driven by an outstanding year for]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-tops-5bn-revenue-as-profit-jumps-over-a-third/</link><pubDate>Wed, 25 Feb 2026 08:56:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-tops-5bn-revenue-as-profit-jumps-over-a-third/</guid></item><item><title><![CDATA[Morgan Sindall gets start date for new railway line]]></title><description><![CDATA[The go-ahead has been given to start main construction in April on the restoration of the Portishead Line.<br />
The passenger rail link between Bristol and Portishead was closed in 1964 but 5.5km of disused line will now be restored and new stations built.<br />
The restored railway will provide an hourly direct train from Portishead to Bristol Temple Meads in around 25 minutes.The deal was originally let to VolkerFizpatrick in 2023 but Morgan Sindall will carry out the work as part of the wider &pound;80m]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-gets-start-date-for-new-railway-line/</link><pubDate>Wed, 25 Feb 2026 08:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-gets-start-date-for-new-railway-line/</guid></item><item><title><![CDATA[Contractors get start date for new railway line]]></title><description><![CDATA[The go-ahead has been given to start main construction in April on the restoration of the Portishead Line.<br />
The passenger rail link between Bristol and Portishead was closed in 1964 but 5.5km of disused line will now be restored and new stations built.<br />
The restored railway will provide an hourly direct train from Portishead to Bristol Temple Meads in around 25 minutes.The deal was originally let to VolkerFizpatrick in 2023 but Morgan Sindall will carry out the work as part of the wider &pound;80m]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-get-start-date-for-new-railway-line/</link><pubDate>Wed, 25 Feb 2026 08:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-get-start-date-for-new-railway-line/</guid></item><item><title><![CDATA[Olympian clears gateway 2 for UK’s tallest co-living scheme]]></title><description><![CDATA[Olympian Homes has secured Gateway 2 approval for a planned 46-storey co-living tower at 56 Marsh Wall on London&rsquo;s Canary Wharf.<br />
The 833-studio room project is the tallest scheme of its kind in the UK to clear the Building Safety Regulator hurdle.<br />
Contractor RG Group will deliver the developer&rsquo;s first wholly co-living scheme under its new Vivus Living brand, which will be rolled out with further planned London projects.Leeds-based Demolition Service is now expected to start site clea]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/olympian-clears-gateway-2-for-uks-tallest-co-living-scheme/</link><pubDate>Wed, 25 Feb 2026 08:15:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/olympian-clears-gateway-2-for-uks-tallest-co-living-scheme/</guid></item><item><title><![CDATA[Winvic wins £112m Digbeth resi tower scheme]]></title><description><![CDATA[Clarion Housing Group&rsquo;s development arm Latimer has awarded Winvic Construction the &pound;112m main works contract to deliver a 481-home mixed-tenure scheme in Digbeth, Birmingham.<br />
Work on the 34-storey block will start in October once demolition contractor PJ Careys clears the 1.3-acre Clyde Street/High Street site.The site is home to a former Safestore industrial facility and surrounding hard-standing car parking. Demolition will get underway next month.The scheme will provide 288 affor]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/winvic-wins-112m-digbeth-resi-tower-scheme/</link><pubDate>Tue, 24 Feb 2026 16:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/winvic-wins-112m-digbeth-resi-tower-scheme/</guid></item><item><title><![CDATA[Dalkia lands £33m British Museum energy centre job]]></title><description><![CDATA[Dalkia has clinched a &pound;33m deal to deliver a flagship low-carbon energy centre at the British Museum as part of its sweeping masterplan overhaul.<br />
The firm will act as principal contractor on the Energy Centre Programme, overseeing civils, architectural fit-out and a full upgrade of the museum&rsquo;s ageing infrastructure across the Bloomsbury estate.<br />
The project forms a critical strand of the British Museum&rsquo;s long-term redevelopment, aimed at reshaping the historic institution for t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dalkia-lands-33m-british-museum-energy-centre-job/</link><pubDate>Tue, 24 Feb 2026 15:04:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dalkia-lands-33m-british-museum-energy-centre-job/</guid></item><item><title><![CDATA[Whitehall heavyweights drafted into CLC board shake-up]]></title><description><![CDATA[The Construction Leadership Council has pulled senior Whitehall figures into its boardroom in a governance shake-up designed to hard-wire the industry more tightly into Government decision-making.<br />
The reset gives formal board seats to the National Infrastructure and Service Transformation Authority and the Cabinet Office, embedding senior civil servants inside the body that helps steer construction strategy.<br />
Becky Wood, CEO of NISTA, and Clare Gibbs, Director of Markets, Sourcing &amp; Suppliers]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/whitehall-heavyweights-drafted-into-clc-board-shake-up/</link><pubDate>Tue, 24 Feb 2026 08:55:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/whitehall-heavyweights-drafted-into-clc-board-shake-up/</guid></item><item><title><![CDATA[CITB tells contractors no more money for training courses]]></title><description><![CDATA[The CITB has run out of&nbsp; funding for training courses booked under its Employer Network initiative.<br />
Contractors are now being told no training bookings can be made until after March 31 leaving firms in limbo for more than a month.<br />
One angry contractor said: &ldquo;We received no warning about this &ndash; we were just hit with an email saying they had run out of funds.&rdquo;The email &ndash; shared with the Enquirer &ndash; states: &ldquo;Thanks for sending the training request through.<br />
&l]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/citb-tells-contractors-no-more-money-for-training-courses/</link><pubDate>Tue, 24 Feb 2026 08:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/citb-tells-contractors-no-more-money-for-training-courses/</guid></item><item><title><![CDATA[Bouygues sues DfE over mega schools framework award]]></title><description><![CDATA[Bouygues has issued a High Court challenge after being edged out of the Government&rsquo;s &pound;15bn schools mega-framework by a scoring gap of just 0.13% from its nearest bid rival.<br />
The contractor claims flawed scoring and a botched moderation process cost it a place with the panel of firms on the coveted southern region major projects lot.<br />
It alleges the Department for Education failed to assess bids properly under the Procurement Act 2023 by making manifest scoring errors and applying undis]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bouygues-sues-dfe-over-mega-schools-framework-award/</link><pubDate>Tue, 24 Feb 2026 08:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bouygues-sues-dfe-over-mega-schools-framework-award/</guid></item><item><title><![CDATA[Enquirer joins forces with construction film maker]]></title><description><![CDATA[The Enquirer is teaming-up with a leading London film maker to offer pioneering construction firms the chance to showcase their latest innovations.<br />
The new Construction Enquirer Originals series will be produced by brand storytelling specialist Superbeam.<br />
The video-led series will highlight the best the industry has to offer and how firms are shaping the future of construction.Videos are the perfect way to reach a modern audience with Superbeam bringing cinematic values to construction stories.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/enquirer-joins-forces-with-construction-film-maker/</link><pubDate>Tue, 24 Feb 2026 08:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/enquirer-joins-forces-with-construction-film-maker/</guid></item><item><title><![CDATA[Height trim at London Silk Street in bid to win City approval]]></title><description><![CDATA[Lipton Rogers and LaSalle Investment Management have slashed the height of their controversial London 1 Silk Street office scheme in a fresh attempt to win over planners and Barbican residents.<br />
Revised plans submitted to the City of London Corporation cut more than 10m from the western side of the Skidmore, Owings &amp; Merrill-designed block, removing three storeys from earlier proposals facing Cromwell Tower.<br />
The move follows strong criticism over daylight loss and massing impacts on the neigh]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/height-trim-at-london-silk-street-in-bid-to-win-city-approval/</link><pubDate>Tue, 24 Feb 2026 08:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/height-trim-at-london-silk-street-in-bid-to-win-city-approval/</guid></item><item><title><![CDATA[£33m lifeline for stalled Rhyl hospital health hub]]></title><description><![CDATA[A long-delayed upgrade of the Royal Alexandra Hospital in Rhyl is finally moving after the Welsh Government confirmed &pound;33m to kickstart construction of a new health hub.<br />
The funding unlocks the first phase of a wider &pound;60m transformation of the site and sees modular specialist MTX Contracts appointed to deliver the centre.<br />
The funding commitment follows more than a decade of false starts.<br />
Back in 2013, ministers backed plans for a &pound;22m, 30-bed hospital on the Royal Alex site tha]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/33m-lifeline-for-stalled-rhyl-hospital-health-hub/</link><pubDate>Mon, 23 Feb 2026 18:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/33m-lifeline-for-stalled-rhyl-hospital-health-hub/</guid></item><item><title><![CDATA[Didcot demolition disaster probe enters eleventh year]]></title><description><![CDATA[Thames Valley Police have issued an update on the investigation into the partial collapse at Didcot Power Station which killed four men ten years ago.<br />
Today marks the decade anniversary of the tragedy on February 23 2016 which cost the lives of Ken Cresswell, John Shaw, Michael Collings and Christopher Huxtable.<br />
A force statement said: &ldquo;Our dedicated team, alongside the Health and Safety Executive (HSE), continues its investigation, which is expected to be completed this year.&ldquo;Furthe]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/didcot-demolition-disaster-probe-enters-eleventh-year/</link><pubDate>Mon, 23 Feb 2026 09:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/didcot-demolition-disaster-probe-enters-eleventh-year/</guid></item><item><title><![CDATA[Ealing to flatten 105 half-built homes after Henry collapse]]></title><description><![CDATA[London&rsquo;s Ealing Council is set to bulldoze 105 part-built affordable homes after concluding it is cheaper to start again than salvage schemes left stranded by Henry Construction&rsquo;s collapse.<br />
The homes were being delivered under a &pound;40m contract awarded in January 2022 to build Passivhaus-standard housing across six small infill sites in Greenford, Southall and West Ealing.<br />
Work began later that year but ground to a halt in June 2023 when Henry Construction went into administratio]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ealing-to-flatten-105-half-built-homes-after-henry-collapse/</link><pubDate>Mon, 23 Feb 2026 09:18:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ealing-to-flatten-105-half-built-homes-after-henry-collapse/</guid></item><item><title><![CDATA[TClarke targets £1bn revenue and beefs up board]]></title><description><![CDATA[Building services specialist TClarke has set its sights on breaking through the &pound;1bn annual revenue barrier as it strengthens its board for the next phase of expansion.<br />
Group chief executive Mark Lawrence unveiled the ambition as the building services contractor confirmed three senior managing directors will join the board of TClarke Contracting from March.<br />
The appointments see Clive Carr, managing director for built environment, Lee Crozier, managing director for data centres and infrastr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tclarke-targets-1bn-revenue-and-beefs-up-board/</link><pubDate>Mon, 23 Feb 2026 08:46:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tclarke-targets-1bn-revenue-and-beefs-up-board/</guid></item><item><title><![CDATA[Green light to complete Derbyshire warehouse park]]></title><description><![CDATA[Clowes Developments has secure planning from South Derbyshire District Council for two units of 542,000 sq ft to complete its Dove Valley Park development in Foston.<br />
The final phase will also provide 329 car parking spaces and 42 HGV docking bays alongside an Innovation Centre designed as a central hub for businesses across Dove Valley Park and the wider area.<br />
Marc Freeman, Director at Clowes Developments, said: &ldquo;This is an exciting opportunity for South Derbyshire to secure much-needed jo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-to-complete-derbyshire-warehouse-park/</link><pubDate>Mon, 23 Feb 2026 08:39:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-to-complete-derbyshire-warehouse-park/</guid></item><item><title><![CDATA[Telford Living plan in for 520-bed London student scheme]]></title><description><![CDATA[Telford Living has lodged plans for a 520-bed student block in East London&rsquo;s Bethnal Green area.<br />
The UK residential arm of CBRE-owned Trammell Crow Company has lodged a planning application with the London Borough of Tower Hamlets for the scheme on the former LEB Building site off Cambridge Heath Road.<br />
Designed by Allford Hall Monaghan Morris, the proposals include a mix of cluster flats and studios, plus student amenity space. Ground-floor community and affordable retail units are also pl]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/telford-living-plan-in-for-520-bed-london-student-scheme/</link><pubDate>Mon, 23 Feb 2026 08:31:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/telford-living-plan-in-for-520-bed-london-student-scheme/</guid></item><item><title><![CDATA[M&amp;E delay pushes Hinkley C first reactor start up back a year]]></title><description><![CDATA[Mechanical and electrical headaches have pushed first power at Hinkley Point C back yet another year &ndash; with the price tag swelling by &pound;1.4bn to &pound;48bn at today&rsquo;s prices.<br />
EDF has confirmed lower than expected productivity on the vast electromechanical installation programme means Unit 1 is now scheduled to start up in 2030.<br />
That is a year later than the previous best-case 2029 target, itself already two years behind the earlier 2027 revised timetable and five years adrift o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mampe-delay-pushes-hinkley-c-first-reactor-start-up-back-a-year/</link><pubDate>Sun, 22 Feb 2026 13:30:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mampe-delay-pushes-hinkley-c-first-reactor-start-up-back-a-year/</guid></item><item><title><![CDATA[Quartet wins London council £570m home estate revamp]]></title><description><![CDATA[London&rsquo;s Haringey council has selected a quartet of contractors to deliver its &pound;570m Estate Renovation Plan to drive a decade-long upgrade of 20,000 council homes.<br />
The borough has split the programme into four geographic patches in a bid to speed up delivery and tighten accountability.<br />
Equans Regeneration will cover the west of the borough, United Infrastructure takes central areas, Hugh LS McConnell will handle the east (south), and Mulalley and Company has secured the east (north)]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/quartet-wins-london-council-570m-home-estate-revamp/</link><pubDate>Fri, 20 Feb 2026 09:11:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/quartet-wins-london-council-570m-home-estate-revamp/</guid></item><item><title><![CDATA[Drone squad to fight fly tippers]]></title><description><![CDATA[The Environment Agency is launching an upgraded 33-strong fleet of drones to fight fly tippers.<br />
The drones will carry laser mapping technology to capture evidence to help secure successful prosecutions of waste criminals.<br />
The agency has also developed a new screening tool that enables officers to scan and cross-check lorry licence applications against waste permit records &ndash; with suspect operators flagged before they have a chance to move waste illegally.The new capabilities are backed by a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/drone-squad-to-fight-fly-tippers/</link><pubDate>Fri, 20 Feb 2026 08:57:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/drone-squad-to-fight-fly-tippers/</guid></item><item><title><![CDATA[Bradford’s 1,000-home City Village gets green light]]></title><description><![CDATA[Bradford&rsquo;s long-awaited City Village regeneration scheme has cleared planning to pave the way for up to 1,000 homes in the city&rsquo;s former commercial heart.<br />
The flagship scheme, driven by Bradford Council and regeneration specialist ECF &ndash; the partnership between Homes England, Legal &amp; General and Muse &ndash; will transform the &lsquo;Top of Town&rsquo; area covering Chain Street and both Oastler and Kirkgate closed shopping centres.<br />
Phase one has now been waved through and w]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bradfords-1000-home-city-village-gets-green-light/</link><pubDate>Fri, 20 Feb 2026 08:32:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bradfords-1000-home-city-village-gets-green-light/</guid></item><item><title><![CDATA[Signs of a building recovery as pipeline begins to stir]]></title><description><![CDATA[The first flicker of recovery is beginning to show across the building sector, with consultants and architects pointing to early signs that a market held back by delay and uncertainty may finally be edging forward.<br />
Cost consultant Gardiner &amp; Theobald has revised its 2026 average tender price inflation forecast up to 3.0%, from 2.5%, reflecting persistent cost pressures and a pipeline that is starting to stir rather than stall.<br />
It is not a demand surge driving the upgrade, but a combination o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/signs-of-a-building-recovery-as-pipeline-begins-to-stir/</link><pubDate>Fri, 20 Feb 2026 08:31:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/signs-of-a-building-recovery-as-pipeline-begins-to-stir/</guid></item><item><title><![CDATA[Contractors being conned by fake skills cards checks]]></title><description><![CDATA[Fraudsters have set-up a network of bogus websites in a bid to cheat the CSCS skills card checking system.<br />
The scam was rumbled by construction identity validation specialist PPAC Systems and some of the fake sites have been been shut down.<br />
But the sophisticated fraud could still see more unqualified workers get on sites because of its complexity.The scam involves setting up replica sites posing as the official place to validate CSCS cards offered by qualification body GQA.<br />
Each bogus card has a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-being-conned-by-fake-skills-cards-checks/</link><pubDate>Fri, 20 Feb 2026 08:15:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-being-conned-by-fake-skills-cards-checks/</guid></item><item><title><![CDATA[Kier lands £120m delayed Edinburgh eye hospital job]]></title><description><![CDATA[Kier has been appointed to deliver the long-awaited &pound;120m replacement for the Princess Alexandra Eye Pavilion in Edinburgh, ending years of uncertainty over the troubled project.<br />
The contractor will act as principal supply chain partner for NHS Lothian on the new specialist facility at the Edinburgh BioQuarter in Little France.<br />
The project will replace the ageing Eye Pavilion, which was first declared &ldquo;not fit for purpose&rdquo; in 2014.<br />
Since then the scheme has been hit by funding]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-120m-delayed-edinburgh-eye-hospital-job/</link><pubDate>Thu, 19 Feb 2026 16:56:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-lands-120m-delayed-edinburgh-eye-hospital-job/</guid></item><item><title><![CDATA[Bidders days for £5.4bn Southern Construction Framework]]></title><description><![CDATA[Southern Construction Framework is stepping up early market engagement ahead of tendering its &pound;5.4bn work programme with a pair of regional Suppliers&rsquo; Days next month.<br />
The sixth generation framework, jointly re-procured by Devon County Council and Hampshire County Council, will replace the current Southern Construction Framework when it expires in 2027.<br />
Free events will be held in Exeter and Winchester, giving contractors and supply chain firms an early steer on how SCF-6 will be str]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bidders-days-for-54bn-southern-construction-framework/</link><pubDate>Thu, 19 Feb 2026 11:15:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bidders-days-for-54bn-southern-construction-framework/</guid></item><item><title><![CDATA[BAM Construction UK returns to profit]]></title><description><![CDATA[BAM&rsquo;s UK construction arm has bounced back into the black after swinging from a &pound;24m loss to a &pound;27m profit in 2025.<br />
In a turnaround year for the building business turnover at the construction division edged up 7% to &pound;979m, driving the recovery in adjusted EBITDA after the prior year&rsquo;s red ink, stemming mainly from the Co-op Live job in Manchester.<br />
The UK civils arm again proved the engine room. BAM Nuttall generated &pound;81m profit on &pound;1.55bn revenue, delive]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bam-construction-uk-returns-to-profit/</link><pubDate>Thu, 19 Feb 2026 09:09:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bam-construction-uk-returns-to-profit/</guid></item><item><title><![CDATA[City skyline revealed after record planning approvals]]></title><description><![CDATA[The City of London Corporation has revealed a new skyline CGI showcasing what the Square Mile&rsquo;s tall buildings cluster will look like in around six years&rsquo; time.<br />
The computer-generated images show what the City of London&rsquo;s financial district will look like from above, once all of the buildings that have either been granted planning permission, or are already under construction are completed following a record year of planning approvals in 2025.<br />
The Corporation said 2026 had seen]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/city-skyline-revealed-after-record-planning-approvals/</link><pubDate>Thu, 19 Feb 2026 08:34:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/city-skyline-revealed-after-record-planning-approvals/</guid></item><item><title><![CDATA[Acheson staff win 90-day wage payout a year after firm folded]]></title><description><![CDATA[Thirty-one former staff at collapsed Dorset contractor Acheson construction have secured a 90-day pay award after a tribunal found the firm failed to properly consult before making redundancies.<br />
The court ruling follows Acheson&rsquo;s slide into administration on 18 February 2025, when administrators were appointed after the business filed a notice of intention the previous day.<br />
At the time, around 40 redundancies were made immediately, with most of the firm&rsquo;s 48-strong workforce losing t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/acheson-staff-win-90-day-wage-payout-a-year-after-firm-folded/</link><pubDate>Thu, 19 Feb 2026 08:25:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/acheson-staff-win-90-day-wage-payout-a-year-after-firm-folded/</guid></item><item><title><![CDATA[Balfour Beatty to start £200m Lincoln link road in March]]></title><description><![CDATA[Balfour Beatty will break ground next month on Lincoln&rsquo;s long-awaited North Hykeham Relief Road after ministers confirmed more than &pound;110m of funding for the &pound;200m job.<br />
The dual carriageway will link the A46 Pennells Roundabout to the Lincoln Eastern Bypass, finally completing the city&rsquo;s full ring road and relieving pressure on the A46 corridor.<br />
Backed by the Department for Transport, the scheme is designed to unlock 4,500 homes and 7 hectares of employment land while easi]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-to-start-200m-lincoln-link-road-in-march/</link><pubDate>Thu, 19 Feb 2026 08:22:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-beatty-to-start-200m-lincoln-link-road-in-march/</guid></item><item><title><![CDATA[Employee-owned Kilnbridge delivers record year]]></title><description><![CDATA[Concrete frame and structures specialist Kilnbridge Group has delivered its strongest results since switching to employee ownership, with pre-tax profit jumping 81% to &pound;6.7m on the back of surging turnover and a &pound;300m forward pipeline.<br />
The group posted a 50% rise in turnover to &pound;129m in the year to June 2025 on the back of HS2 work, commercial and energy schemes.A &pound;300m order book (2024: &pound;200m) now underpins the next phase of growth, giving the business strong visib]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/employee-owned-kilnbridge-delivers-record-year/</link><pubDate>Thu, 19 Feb 2026 08:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/employee-owned-kilnbridge-delivers-record-year/</guid></item><item><title><![CDATA[Worker killed on Norfolk housing site]]></title><description><![CDATA[A construction worker has died after an accident on a housing site in Sprowston, Norfolk.<br />
Emergency services were called to the Tilia Homes site on Tuesday morning where a new estate is under construction.<br />
Site sources told the Eastern Daily Press that the victim suffered a broken neck when roof trusses fell on him.The source said. &ldquo;Trusses fell on him and broke his neck. I am unsure whether they were being delivered using cranes.&rdquo;<br />
A spokesman for Tilia Homes said the victim had been]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/worker-killed-on-norfolk-housing-site/</link><pubDate>Wed, 18 Feb 2026 17:00:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/worker-killed-on-norfolk-housing-site/</guid></item><item><title><![CDATA[Starmer backs £14bn vision for Welsh rail overhaul]]></title><description><![CDATA[The Prime Minister has signed off a sweeping &pound;14bn vision to overhaul Welsh rail, confirming seven new stations and almost &pound;445m of immediate funding to get schemes moving.<br />
Keir Starmer will today formally endorsed Transport for Wales&rsquo; long-term blueprint for railway improvement alongside First Minister for Wales Eluned Morgan.<br />
The Spending Review cash will kickstart a pipeline designed to support 12,000 jobs across Wales and drive a decade of rail construction.Seven new statio]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/starmer-backs-14bn-vision-for-welsh-rail-overhaul/</link><pubDate>Wed, 18 Feb 2026 08:56:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/starmer-backs-14bn-vision-for-welsh-rail-overhaul/</guid></item><item><title><![CDATA[Cardo snaps up painting and fire coating specialist]]></title><description><![CDATA[Private equity-backed housing maintenance contractor Cardo Group has sealed its sixth takeover in 12 months after snapping up employee-owned decorating specialist Trident Maintenance Services.<br />
The painting and fire coatings specialist employs around 100 staff and operates across England and Scotland.<br />
Last year the firm turned over &pound;18m and more than doubled pre-tax profit to &pound;1.7m, underlining its strong position in the compliance-driven coatings and refurbishment market.The deal str]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cardo-snaps-up-painting-and-fire-coating-specialist/</link><pubDate>Wed, 18 Feb 2026 08:39:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cardo-snaps-up-painting-and-fire-coating-specialist/</guid></item><item><title><![CDATA[Keenan saves 54 jobs as FK Group falls into administration]]></title><description><![CDATA[Keenan Holdings has rescued 54 jobs and key live contracts from the collapse of facade specialist FK Group into administration.<br />
Administrators from BTG Begbies Traynor were appointed over FK Group &ndash; comprising FK Group, FK Facades and FK Construction &ndash; last Friday after the business was hit by sustained inflationary pressures and wider market challenges.<br />
In the run up to the appointment of administrators to the Altrincham business, 57 redundancies were made.A further 54 employees hav]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keenan-saves-54-jobs-as-fk-group-falls-into-administration/</link><pubDate>Wed, 18 Feb 2026 08:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keenan-saves-54-jobs-as-fk-group-falls-into-administration/</guid></item><item><title><![CDATA[Keenan saves 54 job as FK Group falls into administration]]></title><description><![CDATA[Keenan Holdings has rescued 54 jobs and key live contracts from the collapse of facade specialist FK Group into administration.<br />
Administrators from BTG Begbies Traynor were appointed over FK Group &ndash; comprising FK Group, FK Facades and FK Construction &ndash; last Friday after the business was hit by sustained inflationary pressures and wider market challenges.<br />
In the run up to the appointment of administrators to the Altrincham business, 57 redundancies were made.A further 54 employees hav]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/keenan-saves-54-job-as-fk-group-falls-into-administration/</link><pubDate>Wed, 18 Feb 2026 08:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/keenan-saves-54-job-as-fk-group-falls-into-administration/</guid></item><item><title><![CDATA[Jerram Falkus Construction files administration notice]]></title><description><![CDATA[Historic London contractor Jerram Falkus Construction Ltd has filed an administration notice.<br />
The notice of appointment to appoint an administrator was lodged yesterday and comes after the firm&rsquo;s sites suddenly shut this week.<br />
One supplier told the Enquirer: &ldquo;We turned up at one of their jobs to make a scheduled delivery on Monday and the gates were locked.&ldquo;Their people seemed in total shock as to what was going on.&rdquo;<br />
The firm has been in business since 1884 operating acro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jerram-falkus-construction-files-administration-notice/</link><pubDate>Wed, 18 Feb 2026 08:00:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jerram-falkus-construction-files-administration-notice/</guid></item><item><title><![CDATA[Green light for first tower on £1bn Liverpool scheme]]></title><description><![CDATA[Planning approval has been granted for the first phase of the &pound;1bn King Edward development adjacent to Liverpool&rsquo;s Pier Head.<br />
Demolition works starting this spring will be followed by construction of a 28-storey residential tower on the regeneration site&rsquo;s first plot.<br />
A demolition contractor will be appointed imminently while the Enquirer understands talks are now set to start with a shortlist of contractors for the first tower.Hugh Frost of developer Beetham Davos said: &ldquo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-first-tower-on-1bn-liverpool-scheme/</link><pubDate>Tue, 17 Feb 2026 22:36:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-first-tower-on-1bn-liverpool-scheme/</guid></item><item><title><![CDATA[TCC lands historic conversion]]></title><description><![CDATA[Birmingham-based The Construction Consultants (TCC) has been appointed as project managers, quantity surveyors and employers agents to oversee the &pound;5m restoration of a local historic building for developer ETME Group.<br />
The Grade II-listed Derwent Works pressings and stampings building in Constitution Hill in the Jewellery Quarter had fallen into disrepair but will now be transformed into apartments and retail units.<br />
The factory was built in the late 19th century by Taylor &amp; Challen, a c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/tcc-lands-historic-conversion/</link><pubDate>Tue, 17 Feb 2026 18:34:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/tcc-lands-historic-conversion/</guid></item><item><title><![CDATA[Bauer Technologies lands Metro piling deal]]></title><description><![CDATA[Bauer Technologies has been appointed to deliver specialist piling works as part of Phase 2 of the Wednesbury to Brierley Hill Metro extension &ndash; a major infrastructure scheme forming a key element of Transport for West Midland&rsquo;s (TfWM) investment in the West Midlands Metro network.<br />
Subcontracted by MPB Structures, Bauer Technologies will undertake foundation piling works for a series of new structures along the route, supporting the delivery of this strategically important transport]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/bauer-technologies-lands-metro-piling-deal/</link><pubDate>Tue, 17 Feb 2026 18:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/bauer-technologies-lands-metro-piling-deal/</guid></item><item><title><![CDATA[Watkin Jones clears Gateway 2 for Bristol student halls]]></title><description><![CDATA[Watkin Jones has secured Gateway 2 approval for a 201-bed purpose-built student accommodation scheme in Bristol, allowing construction to push ahead on the Freestone Road site.<br />
The &pound;60m scheme is being delivered for a joint venture between Moorfield Group and Tiger Developments, and is targeting EPC A, BREEAM Excellent, and featuring PV panels alongside a district heating connection.<br />
The Freestone Yards development will transform a brownfield plot in the Temple Quarter into four blocks pro]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-clears-gateway-2-for-bristol-student-halls/</link><pubDate>Tue, 17 Feb 2026 16:26:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/watkin-jones-clears-gateway-2-for-bristol-student-halls/</guid></item><item><title><![CDATA[Plan for 240 flats at Nottingham Station gateway site]]></title><description><![CDATA[Plans have been unveiled for a 244-home build-to-rent scheme on railway land beside Nottingham railway station.<br />
Developer blocwork has teamed up with Network Rail&rsquo;s property arm Platform 4 and listed landlord Grainger to bring forward the brownfield redevelopment at the junction of Station Street and London Road.<br />
The scheme, which will be submitted for planning shortly. will deliver one- and two-bedroom flats for rental living on the underused rail-side plot.Richard Thomas, director at blo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plan-for-240-flats-at-nottingham-station-gateway-site/</link><pubDate>Tue, 17 Feb 2026 16:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plan-for-240-flats-at-nottingham-station-gateway-site/</guid></item><item><title><![CDATA[Battersea Power Station masterplan reset for final 16 acres]]></title><description><![CDATA[The developer behind the vast Battersea Power Station redevelopment in London has pressed the reset button on its masterplan, appointing Studio Egret West to steer the final 16 acres of the 42-acre riverside regeneration.<br />
The move will unlock up to 3.2m sq ft of homes, offices, cultural and leisure space across the remaining half of the central London scheme.<br />
Studio Egret West will recast the original blueprint drawn up more than 15 years ago by Rafael Vi&ntilde;oly, reshaping the future phases]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/battersea-power-station-masterplan-reset-for-final-16-acres/</link><pubDate>Tue, 17 Feb 2026 08:58:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/battersea-power-station-masterplan-reset-for-final-16-acres/</guid></item><item><title><![CDATA[Fit-out firm Artemis files administration notice]]></title><description><![CDATA[Fit-out and refurbishment specialist Artemis Interior Services Ltd has filed a notice to appoint an administrator.<br />
The London-based contractor filed the notice yesterday.<br />
Latest results for Artemis for the year to December 31 2024 show a turnover of &pound;21.6m generating a pre-tax loss of &pound;2.1m.The firm blamed the &ldquo;disappointing year&rdquo; on &ldquo;two challenging projects which resulted in significant losses.&rdquo;<br />
It added: &ldquo;This is the first year in the history of the b]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/fit-out-firm-artemis-files-administration-notice/</link><pubDate>Tue, 17 Feb 2026 08:38:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/fit-out-firm-artemis-files-administration-notice/</guid></item><item><title><![CDATA[£100m Eden Project Morecambe gets green light]]></title><description><![CDATA[Lancaster councillors have waved through revised plans for the &pound;100m Eden Project Morecambe backing a dramatically slimmed-down version of the long-awaited seafront attraction.<br />
Lancaster City Council granted planning permission for the second time after developers halved the size of the scheme and cut the number of signature domes from four to two.<br />
The rethink follows years of cost inflation that stalled the original programme, which had targeted a 2024 completion.Designed by Grimshaw Arch]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/100m-eden-project-morecambe-gets-green-light/</link><pubDate>Tue, 17 Feb 2026 08:38:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/100m-eden-project-morecambe-gets-green-light/</guid></item><item><title><![CDATA[Ferrovial bags £80m Slough sewage works revamp]]></title><description><![CDATA[Ferrovial has landed an &pound;80m job to overhaul Slough Sewage Treatment Works for Thames Water.<br />
The scheme will be delivered through an integrated joint venture between Ferrovial Construction and sister company Cadagua, which specialises in water treatment.<br />
The project will upgrade the Berkshire works to meet tighter Environment Agency wastewater standards and boost operational resilience.Planned works include expanding treatment capacity to hit tougher ammonia and phosphorous limits and impr]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ferrovial-bags-80m-slough-sewage-works-revamp/</link><pubDate>Tue, 17 Feb 2026 08:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ferrovial-bags-80m-slough-sewage-works-revamp/</guid></item><item><title><![CDATA[Police swoop on skills card test centre]]></title><description><![CDATA[Four men have been arrested following a police probe into a suspected fraudulent construction skills card test centre.<br />
Officers from Hampshire and Isle of Wight Constabulary&rsquo;s Economic Crime Unit raided the independent testing centre in Winchester over the weekend.<br />
The swoop was the culmination of an ongoing investigation following a tip-off from the Construction Industry Training Board (CITB) that the centre was accepting payment to help people fraudulently pass CSCS skills card safety te]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/police-swoop-on-skills-card-test-centre/</link><pubDate>Tue, 17 Feb 2026 00:05:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/police-swoop-on-skills-card-test-centre/</guid></item><item><title><![CDATA[Police swoop on site safety test centre]]></title><description><![CDATA[Four men have been arrested following a police probe into a suspected fraudulent construction test centre.<br />
Officers from Hampshire and Isle of Wight Constabulary&rsquo;s Economic Crime Unit raided the independent testing centre in Winchester over the weekend.<br />
The swoop was the culmination of an ongoing investigation following a tip-off from the Construction Industry Training Board (CITB) that the centre was accepting payment to help people fraudulently pass safety tests to help gain CSCS cards.F]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/police-swoop-on-site-safety-test-centre/</link><pubDate>Tue, 17 Feb 2026 00:05:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/police-swoop-on-site-safety-test-centre/</guid></item><item><title><![CDATA[Former Carillion chief Richard Howson fined £237,000]]></title><description><![CDATA[Former Carillion group chief executive Richard Howson has been fined &pound;237,700 for his part in misleading statements issued by the failed contractor.<br />
The fine from the FCA comes after Howson withdrew his challenge to the financial watchdog&rsquo;s decision after a probe into Carillion&rsquo;s 2018 collapse<br />
He was originally fined &pound;397,800 in 2022 but the fine has been reduced after the FCA said it had overstated his &ldquo;relevant income&rdquo; and his co-operation with the investiga]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/former-carillion-chief-richard-howson-fined-237000/</link><pubDate>Mon, 16 Feb 2026 19:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/former-carillion-chief-richard-howson-fined-237000/</guid></item><item><title><![CDATA[Graham clinches £286m Manchester student scheme]]></title><description><![CDATA[Contractor Graham has sealed the job to redevelop Cambridge Halls student campus for Manchester Metropolitan University.<br />
The &pound;286m project to create over 2,300 new student bedrooms is being delivered through a joint venture between the University and Unite Students.<br />
The project includes the demolition of the existing 1990s-era accommodation and the construction of two new multi-storey buildings rising to 30 storey&rsquo;s across two phases, providing a mix of cluster apartments and studios]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/graham-clinches-286m-manchester-student-scheme/</link><pubDate>Mon, 16 Feb 2026 09:16:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/graham-clinches-286m-manchester-student-scheme/</guid></item><item><title><![CDATA[Chippenham £50m town centre reset go-ahead]]></title><description><![CDATA[Developer Acorn Property Group has secured planning approval to redevelop Chippenham&rsquo;s ageing Emery Gate Shopping Centre with a &pound;50 mixed-use riverside quarter of 225 homes.<br />
The scheme, branded Chippenham Riverside and designed by HNW Architects, will strip out the inward-facing mall and replace it with a network of streets and public squares to reconnect the High Street to Island Park and the River Avon.<br />
New streets and homes plan<br />
The approved masterplan will also deliver around 4,0]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/chippenham-50m-town-centre-reset-go-ahead/</link><pubDate>Mon, 16 Feb 2026 09:05:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/chippenham-50m-town-centre-reset-go-ahead/</guid></item><item><title><![CDATA[Green light for Italian plaster factory in Derbyshire]]></title><description><![CDATA[The planning green light has been given for an Italian materials giant to build a major factory near Ilkeston in Derbyshire.<br />
Erewash Borough Council has approved plans by&nbsp;Fassa Bortolo to house its new UK headquarters at the site of the old Stanton Ironworks.<br />
Fassa Bortolo specialises in pre-mix renders and plasters and its new plant will cover 170,000 square feet at the New Stanton Park.Erewash&rsquo;s leader Cllr James Dawson said: &ldquo;It&rsquo;s about more than just construction &ndas]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-italian-plaster-factory-in-derbyshire/</link><pubDate>Mon, 16 Feb 2026 08:47:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-italian-plaster-factory-in-derbyshire/</guid></item><item><title><![CDATA[Contractors wanted for £75m coastal civils deal]]></title><description><![CDATA[Portsmouth City Council will this month start market engagement on a new &pound;75m coastal and flood works framework spanning the south coast.<br />
The council is acting as host authority on behalf of the Southern Coastal Group and SCOPAC, consisting of a dozen south coast local authorities.<br />
The six-year framework deal worth around &pound;75m is due to come into force in December 2026, and replace the current 2022&ndash;2026 Minor Works Framework.Four contractors will be appointed to a primary tier]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/contractors-wanted-for-75m-coastal-civils-deal/</link><pubDate>Mon, 16 Feb 2026 08:28:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/contractors-wanted-for-75m-coastal-civils-deal/</guid></item><item><title><![CDATA[MTX signs deal for health campus near Cardiff]]></title><description><![CDATA[Offsite specialist MTX Contracts Ltd has signed a Pre-Construction Services Agreement to deliver Phase 1 of a new healthcare campus for South East Wales in Llantrisant, Rhondda Cynon Taf.<br />
The scheme will transform the former British Airways Avionics Engineering site near Cardiff into a state-of-the-art healthcare campus, delivering a c.17,300m&sup2; new build development across three buildings with supporting infrastructure to create a Community Diagnostics Hub and Treatment Centre.<br />
Phase 1 of t]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/mtx-signs-deal-for-health-campus-near-cardiff/</link><pubDate>Mon, 16 Feb 2026 08:26:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/mtx-signs-deal-for-health-campus-near-cardiff/</guid></item><item><title><![CDATA[HBC breaks ground on £24m Sheffield co-living scheme]]></title><description><![CDATA[Construction has begun on a &pound;24m co-living development in Kelham Island set to become Sheffield&rsquo;s largest purpose-built scheme of its kind in the city.<br />
Developer Grantside has appointed HBC Construction as main contractor, with EDGE acting as employer&rsquo;s agent and project manager.<br />
Designed by Cartwright Pickard, with Arup as structural engineer and Hoare Lea on MEP, the scheme will deliver 100 studio flats and shared amenities including a gym, yoga studio, co-working hub and roo]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hbc-breaks-ground-on-24m-sheffield-co-living-scheme/</link><pubDate>Mon, 16 Feb 2026 08:08:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hbc-breaks-ground-on-24m-sheffield-co-living-scheme/</guid></item><item><title><![CDATA[Gateway 3 delays leave thousands of homes empty]]></title><description><![CDATA[Thousands of completed flats are still sitting empty as developers face continued delays at the final Gateway 3 stage of the building safety approval process.<br />
New FOI data obtained by legal firm Irwin Mitchell revealed 44 schemes remain undecided more than three months after submission, with the longest case waiting 550 days for approval.<br />
Across these delayed schemes, 5,594 completed units are currently unoccupied, despite being ready for residents.Under the building safety regime for higher&#82]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gateway-3-delays-leave-thousands-of-homes-empty/</link><pubDate>Mon, 16 Feb 2026 00:04:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gateway-3-delays-leave-thousands-of-homes-empty/</guid></item><item><title><![CDATA[Gateway 3 delays leave legacy homes still empty]]></title><description><![CDATA[Thousands of completed flats are still sitting empty as developers face continued delays at the final Gateway 3 stage of the building safety approval process.<br />
New FOI data obtained by legal firm Irwin Mitchell revealed 44 schemes remain undecided more than three months after submission, with the longest case waiting 550 days for approval.<br />
Across these delayed schemes, 5,594 completed units are currently unoccupied, despite being ready for residents.<br />
The Building Safety Regulator said the delays]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/gateway-3-delays-leave-legacy-homes-still-empty/</link><pubDate>Mon, 16 Feb 2026 00:04:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/gateway-3-delays-leave-legacy-homes-still-empty/</guid></item><item><title><![CDATA[Plans ramp-up for Wythenshawe £500m town centre revamp]]></title><description><![CDATA[Muse has submitted plans for a new food hall as the latest addition to its &pound;500m transformation of Wythenshawe town centre.<br />
The new food hall is part of wider plans to regenerate Wythenshawe Civic shopping centre in Manchester.<br />
They include construction of a new &pound;32m Culture Hub being built by Kier.Joel Chandler, senior development manager at Muse, said: &ldquo;We&rsquo;re moving at pace with our plans to give the town centre the regeneration it deserves.<br />
&ldquo;The food hall will be]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/plans-ramp-up-for-wythenshawe-500m-town-centre-revamp/</link><pubDate>Fri, 13 Feb 2026 09:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/plans-ramp-up-for-wythenshawe-500m-town-centre-revamp/</guid></item><item><title><![CDATA[Cheshire M&amp;E specialist Gilks files administration notice]]></title><description><![CDATA[Cheshire mechanical and electrical engineering contractor Gilks (Nantwich) has filed a notice of intention to appoint administrators.<br />
Established over 60 years ago, the firm employs around 60 staff and last year delivered revenue of around &pound;11m, down from &pound;15m in the prior year.<br />
Staff were first told the business was heading for administration on Monday but by Wednesday the said they were informed that the company would be liquidated and they would no longer have jobs.One insider sai]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/cheshire-mampe-specialist-gilks-files-administration-notice/</link><pubDate>Fri, 13 Feb 2026 09:03:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/cheshire-mampe-specialist-gilks-files-administration-notice/</guid></item><item><title><![CDATA[Jackson wins race for £22m East Sussex bridge]]></title><description><![CDATA[Jackson Civil Engineering Group has been confirmed winner of a three-way race to build the new &pound;21.7m Exceat Bridge in East Sussex.<br />
The firm beat-off competition from rivals Costain and Volker and was confirmed main contractor by East Sussex County Council this work.<br />
Jackson will now finalise a construction timetable with the council and main works are expected to start later this year.Cllr Claire Dowling said: &ldquo;With the bridge sitting in the middle of the South Downs National Park,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jackson-wins-race-for-22m-east-sussex-bridge/</link><pubDate>Fri, 13 Feb 2026 08:54:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jackson-wins-race-for-22m-east-sussex-bridge/</guid></item><item><title><![CDATA[Kier set to bag £35m Bristol station car park job]]></title><description><![CDATA[Kier Construction is poised to seal a &pound;35m deal to deliver a landmark seven-storey multi-storey car park and standalone cycle hub at Bristol Temple Meads.<br />
The contractor beat off competition from Vinci, GMI Construction, Goldbeck Construction and Huber Parking UK for the Southern Gateway scheme.<br />
Contract signature is expected at the end of the month following completion of the standstill period.The project is a critical enabling package within the Temple Quarter masterplan and will shift r]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/kier-set-to-bag-35m-bristol-station-car-park-job/</link><pubDate>Fri, 13 Feb 2026 08:10:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/kier-set-to-bag-35m-bristol-station-car-park-job/</guid></item><item><title><![CDATA[Leeds £1bn Eastgate Quarter vision moves up a gear]]></title><description><![CDATA[Leeds&rsquo; &pound;1bn Eastgate Quarter has shifted up a gear after the developer JV appointed its consultant line-up to crack on with the city&rsquo;s last big inner-core regeneration site.<br />
Leeds-based Khalbros and Torsion Group JV has appointed the professional team to shape the four-hectare mixed-use scheme stretching from Vicar Lane to Bridge Street and up to the A64(M).<br />
The long-neglected patch of surface car parks and tired plots is earmarked for a dense new neighbourhood of homes, worksp]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/leeds-1bn-eastgate-quarter-vision-moves-up-a-gear/</link><pubDate>Thu, 12 Feb 2026 17:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/leeds-1bn-eastgate-quarter-vision-moves-up-a-gear/</guid></item><item><title><![CDATA[Severfield facing strike action next week]]></title><description><![CDATA[More than 100 workers are set to strike next week at the UK&rsquo;s largest structural steelwork contractor Severfield.<br />
Welders, platers and machine operators at the Lostock factory in Bolton will walk out after not being offered a pay rise by the firm which posted losses in its latest results.<br />
More than 90% of GMB members voted in favour of strike action after an overtime ban this week.Industrial action will start with one full day of strike action on Monday 16 February, followed by two full da]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/severfield-facing-strike-action-next-week/</link><pubDate>Thu, 12 Feb 2026 16:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/severfield-facing-strike-action-next-week/</guid></item><item><title><![CDATA[Construction grew 1.8% last year despite sharp Q4 fall]]></title><description><![CDATA[Construction firms ended 2025 in growth territory despite a poor final quarter that saw output fall sharply in the final months<br />
Latest data from the Office for National Statistics shows total construction output rose 1.8% in 2025 compared with 2024 &mdash; the fifth consecutive year of annual expansion.<br />
But momentum faded sharply in the final three months of the year, according to official figures published this morning.Total output fell 2.1% in Quarter 4 (October to December) compared with Quar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/construction-grew-18-last-year-despite-sharp-q4-fall/</link><pubDate>Thu, 12 Feb 2026 09:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/construction-grew-18-last-year-despite-sharp-q4-fall/</guid></item><item><title><![CDATA[Firms fined after two killed when MEWP overturns]]></title><description><![CDATA[Two companies have been fined following an incident which resulted in the deaths of two workers in West Yorkshire.<br />
Lee Horton, 58, and Daron Pickstock, 43, were killed when an industrial warehouse racking system collapsed as it was being tested at Castefields Industrial Estate in Bingley on 29 October 2020.<br />
The racking was being tested at a site belonging to Space Productiv Ltd, of which Horton, from Ilkley, was the managing director. Pickstock, who was from Chorley, was self-employed and workin]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/firms-fined-after-two-killed-when-mewp-overturns/</link><pubDate>Thu, 12 Feb 2026 08:57:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/firms-fined-after-two-killed-when-mewp-overturns/</guid></item><item><title><![CDATA[Salford set for record £525m wastewater reset]]></title><description><![CDATA[Costain, Jacobs, Murphy, MWH, Mott MacDonald Bentley and VolkerStevin are gearing up to deliver the biggest ever overhaul of Salford&rsquo;s sewer network under United Utilities&rsquo; new AMP8 enterprise model.<br />
The integrated team will spearhead a &pound;525m programme to modernise wastewater assets across the city over the next five years &ndash; slashing storm overflows, boosting resilience and tightening environmental performance.<br />
At the heart of the push are two flagship treatment works upg]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/salford-set-for-record-525m-wastewater-reset/</link><pubDate>Thu, 12 Feb 2026 08:48:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/salford-set-for-record-525m-wastewater-reset/</guid></item><item><title><![CDATA[Morgan Sindall eyes bumper 2026 on record workload]]></title><description><![CDATA[Morgan Sindall has lined up another profit upgrade after its high-flying Fit Out arm roared into 2026 ahead of plan.<br />
The group said trading momentum has accelerated since the turn of the year, putting 2026 on course to beat previous expectations.<br />
A 17% jump in secured order book and preferred bidder work to &pound;19.1bn has given the contractor its strongest ever opening position for a new financial year.In a trading update ahead of releasing 2025 full-year results due in a fortnight, the firm]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-eyes-bumper-2026-on-record-workload/</link><pubDate>Thu, 12 Feb 2026 08:46:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/morgan-sindall-eyes-bumper-2026-on-record-workload/</guid></item><item><title><![CDATA[Funding agreed for £220m Paddington overstation job]]></title><description><![CDATA[The joint venture between Helical and TfL&rsquo;s property company Places for London has agreed a &pound;220m&nbsp;development financing facility with PIMCO Prime Real Estate for the Paddington Over Station Development.<br />
The deal will allow main construction to start on the Grimshaw designed scheme which will see 235,000 sq ft new&#8209;build office development positioned directly above the northern entrance to Paddington station overlooking the Grand Union Canal.<br />
Enabling works started last June]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/funding-agreed-for-220m-paddington-overstation-job/</link><pubDate>Thu, 12 Feb 2026 08:31:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/funding-agreed-for-220m-paddington-overstation-job/</guid></item><item><title><![CDATA[Hill bags £45m Kent high-rise flats job]]></title><description><![CDATA[Hill Partnerships has landed a &pound;45m deal to build 103 flats for Maidstone Borough Council on the former Springfield Library site in the Kent town.<br />
The firm beat rival bids from Higgins and Lovell to secure the two-block scheme, which includes&nbsp; a 10-storey tower.<br />
The contract runs from an anticipated start date of 6 March 2026 through to 1 December 2029.Approved plans comprise 43% one-bed flats, 47% two-beds and 11% three-beds. The development also includes 68 basement parking spaces a]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hill-bags-45m-kent-high-rise-flats-job/</link><pubDate>Thu, 12 Feb 2026 08:25:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hill-bags-45m-kent-high-rise-flats-job/</guid></item><item><title><![CDATA[Willmott Dixon gets start date for £43m Kent leisure job]]></title><description><![CDATA[Willmott Dixon will move on site this spring to start demolition works for Gravesend&rsquo;s long-awaited new Cascades Leisure Centre.<br />
The &pound;43m project will feature a 25m main pool, 17m learner pool, aqua play and flume, spectator seating, a six-court sports hall, multi-level soft play, party and community rooms and a caf&eacute;.<br />
Willmott Dixon was named construction partner last September under a direct award via the Pagabo framework, initially taking the scheme through pre-construction.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-gets-start-date-for-43m-kent-leisure-job/</link><pubDate>Thu, 12 Feb 2026 08:09:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/willmott-dixon-gets-start-date-for-43m-kent-leisure-job/</guid></item><item><title><![CDATA[Barratt Redrow £1bn safety upgrade works shift up a gear]]></title><description><![CDATA[Barratt Redrow has stepped up remediation works across its building safety and concrete frame legacy portfolio, with more than &pound;1bn of costs set to flow over the next four years.<br />
The house builder said this morning it is pressing ahead at pace, shifting decisively from investigation to delivery.<br />
Its building safety provision fell to &pound;829m at the half year after &pound;73m was spent on remediation in the six months to December. Crucially, no new issues emerged that required an uplift]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-1bn-safety-upgrade-works-shift-up-a-gear/</link><pubDate>Wed, 11 Feb 2026 09:20:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barratt-redrow-1bn-safety-upgrade-works-shift-up-a-gear/</guid></item><item><title><![CDATA[Two arrested after 999 construction fly-tipping call]]></title><description><![CDATA[Two men have been arrested after construction waste was dumped in a field near Romford.<br />
Essex Police responded to a 999 call after waste was left on private land close to the M25&rsquo;s junction with the M11, in the village of Stapleford Tawney.<br />
Officers swooped on the field on last week arresting a 55-year-old from Horley in Surrey, and a 25-year-old from Mullaghbawn in County Armagh.They were taken to a police station and questioned by officers on behalf of the Environment Agency, which is le]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/two-arrested-after-999-construction-fly-tipping-call/</link><pubDate>Wed, 11 Feb 2026 08:42:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/two-arrested-after-999-construction-fly-tipping-call/</guid></item><item><title><![CDATA[Green light for Liverpool Street Station revamp]]></title><description><![CDATA[The City of London Corporation has approved plans for a major redevelopment of Liverpool Street Station.<br />
The proposals will deliver a state-of-the-art, fully accessible station, alongside new commercial, cultural and public spaces.<br />
Policy Chairman of the City of London Corporation, Chris Hayward, said: &ldquo;This redevelopment of Liverpool Street station is a major step forward for the Square Mile.&ldquo;It will support the City&rsquo;s dynamic business ecosystem with state-of-the-art infrastru]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-liverpool-street-station-revamp/</link><pubDate>Wed, 11 Feb 2026 08:39:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/green-light-for-liverpool-street-station-revamp/</guid></item><item><title><![CDATA[D-Day for £37bn NHS hospital framework]]></title><description><![CDATA[Contractors are expecting a decision shortly on the winners for the &pound;37bn Hospital 2.0 Alliance framework.<br />
The deal will deliver the new hospital building programme over the next 12 years.<br />
The Enquirer understands that contractors are expecting a decision this month.One said: &ldquo;A lot of people have been on tenterhooks over this since the start of the year but it looks like a decision is imminent.&rdquo;<br />
The bid race opened 12 months ago and last summer a shortlist of 16 firms was anno]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/d-day-for-37bn-nhs-hospital-framework/</link><pubDate>Wed, 11 Feb 2026 08:34:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/d-day-for-37bn-nhs-hospital-framework/</guid></item><item><title><![CDATA[Severfield hires ex-ISG finance chief to steer turnaround]]></title><description><![CDATA[Severfield has appointed former ISG finance boss Andrew Page as chief financial officer and executive director in a key boardroom move as it pushes ahead with its transformation plan.<br />
Page joins the steelwork specialist next week, succeeding interim finance chief Jan Bramall, who has held the role since 1 November 2025.<br />
The board ran a full external search before landing on Page, who most recently served as interim chief financial officer at ISG.He brings heavyweight listed company experience, h]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/severfield-hires-ex-isg-finance-chief-to-steer-turnaround/</link><pubDate>Wed, 11 Feb 2026 08:19:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/severfield-hires-ex-isg-finance-chief-to-steer-turnaround/</guid></item><item><title><![CDATA[Barhale secures hat-trick of Thames Water sewer schemes]]></title><description><![CDATA[Barhale has landed a hat-trick of development-driven sewer upgrade scheme for Thames Water at Brent Cross, Basingstoke and Benson.<br />
The civils specialist has secured the trio of jobs under Thames Water&rsquo;s &pound;200m-plus AMP8 Major Projects framework for Developer Services and Infrastructure Programmes.<br />
The framework targets complex infrastructure needed to unlock development, covering diversions, requisitions and lateral drainage tied to third-party schemes.At Brent Cross, adjacent to the]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/barhale-secures-hat-trick-of-thames-water-sewer-schemes/</link><pubDate>Tue, 10 Feb 2026 10:22:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/barhale-secures-hat-trick-of-thames-water-sewer-schemes/</guid></item><item><title><![CDATA[Subcontractors wanted across the Midlands]]></title><description><![CDATA[Subcontractors and suppliers can find work opportunities across the Midlands at the latest event hosted by Constructionline.<br />
Its latest Marketplace Live will be held in Birmingham on Thursday 26 February at Villa Park.<br />
The regional networking event features several of the UK&rsquo;s leading contractors, public-sector authorities and other organisations.Exhibitors will include Seddon Construction, United Infrastructure and Wates Construction.<br />
Registration for Marketplace Live is open to paid memb]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/subcontractors-wanted-across-the-midlands/</link><pubDate>Tue, 10 Feb 2026 09:09:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/subcontractors-wanted-across-the-midlands/</guid></item><item><title><![CDATA[Muse go-ahead for 1,600-home Solihull town centre reset]]></title><description><![CDATA[Muse has secured the planning green light for a wholesale remake of Mell Square in Solihull town centre, paving the way for a 10-year, 1,600-home regeneration anchored by new retail, leisure and public realm.<br />
The Solihull Council-approved scheme will be taken forward by Muse under a new name &ndash; Holbeche Place &ndash; marking the start of a full-scale reset for the ageing mid-20th-century shopping precinct.<br />
Alongside new homes spanning build-to-rent and affordable tenures, the plans include]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/muse-go-ahead-for-1600-home-solihull-town-centre-reset/</link><pubDate>Tue, 10 Feb 2026 08:45:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/muse-go-ahead-for-1600-home-solihull-town-centre-reset/</guid></item><item><title><![CDATA[JRL lands £68m North London housing tower job]]></title><description><![CDATA[JRL Group has landed a &pound;68m contract to build a 30-storey housing block in North London after Clarion Housing Group stepped in to rescue a long-stalled development.<br />
A different tower project at the Argenta House site in Stonebridge Park was originally started by Henry Construction Projects. This ground to a halt during foundation works when the contractor fell into administration in June 2023, leaving the site dormant.<br />
Since then, Clarion Housing Group, through its Latimer development arm]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/jrl-lands-68m-north-london-housing-tower-job/</link><pubDate>Tue, 10 Feb 2026 08:44:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/jrl-lands-68m-north-london-housing-tower-job/</guid></item><item><title><![CDATA[Skanska seals £273m delayed Broadgate office overhaul]]></title><description><![CDATA[Skanska has got the go-ahead to overhaul and extend one of the last major offices at the Broadgate campus upgrade in London.<br />
The contractor has finally signed off a deal worth &pound;273m with British Land and GIC under their Broadgate joint venture to deliver the delayed 1 Appold Street office revamp.<br />
The project will see the tired 1980s office block stripped back and rebuilt into a low-carbon workplace designed by Piercy&amp;Company.A major sustainability push sits at the heart of the scheme,]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/skanska-seals-273m-delayed-broadgate-office-overhaul/</link><pubDate>Tue, 10 Feb 2026 08:43:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/skanska-seals-273m-delayed-broadgate-office-overhaul/</guid></item><item><title><![CDATA[School building winners to give apprentice guarantees]]></title><description><![CDATA[Contractors looking to win school building projects will have to show that they are providing opportunities for apprentices and T Level students.<br />
The government is looking to create 13,000 new placements as part of the upcoming education estates strategy overseeing the &pound;20bn School Rebuilding Programme through to 2034-35.<br />
It said: &ldquo;The government&rsquo;s commitment to long-term funding through to 2034-35 means construction firms can plan ahead and invest in training.&ldquo;A longer c]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/school-building-winners-to-give-apprentice-guarantees/</link><pubDate>Tue, 10 Feb 2026 08:37:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/school-building-winners-to-give-apprentice-guarantees/</guid></item><item><title><![CDATA[DfT tests market for privately financed HS2 Euston station job]]></title><description><![CDATA[The Department for Transport has fired the starting gun on private sector involvement at HS2 Euston, launching early market engagement for a design, build, finance and maintain partner on the long-delayed London terminus.<br />
The move signals the Government&rsquo;s intention to push ahead with a public-private partnership to deliver the HS2 Euston station itself, alongside confirmed public funding to bring the high-speed line into Euston.<br />
Under the emerging model, a private sector partner would take]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/dft-tests-market-for-privately-financed-hs2-euston-station-job/</link><pubDate>Mon, 09 Feb 2026 15:32:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/dft-tests-market-for-privately-financed-hs2-euston-station-job/</guid></item><item><title><![CDATA[Long-empty Southend HMRC tower set for 557-flat rebirth]]></title><description><![CDATA[Developer Comer Homes has secured full permission to proceed with one of Southend&rsquo;s biggest residential conversions clearing the decks for construction to start on the long-stalled major office to flats scheme.<br />
The firm has sealed final Section 106 legal agreement with Southend Council allowing it to a redevelop the former HMRC tower on Victoria Avenue.<br />
The green light unlocks plans to convert the vacant 1960s Alexander House office block into 557 flats above ground-floor commercial space]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/long-empty-southend-hmrc-tower-set-for-557-flat-rebirth/</link><pubDate>Mon, 09 Feb 2026 09:17:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/long-empty-southend-hmrc-tower-set-for-557-flat-rebirth/</guid></item><item><title><![CDATA[RED starts revamp of Lincoln’s Inn Fields]]></title><description><![CDATA[RED Construction Group has been appointed for the first &pound;13m phase of refurbishment work at 20-23 Lincoln&rsquo;s Inn Fields in central London by developer Dorrington.<br />
RED Construction&rsquo;s London team will deliver the first phase of works as part of a wider redevelopment of the five historic interconnected buildings spanning 15-23 Lincoln&rsquo;s Inn Fields, totalling around 70,000 sqft, on the north side of the square.<br />
Works include a back to frame refurbishment, core extension, roof]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/red-starts-revamp-of-lincolns-inn-fields/</link><pubDate>Mon, 09 Feb 2026 08:53:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/red-starts-revamp-of-lincolns-inn-fields/</guid></item><item><title><![CDATA[Glencar tipped for latest London data centre]]></title><description><![CDATA[Glencar is understood to have won the race for a new &pound;100m+ data centre in north London.<br />
The Enquirer understands that Glencar is set to sign a deal with Pure Data Centres for the next phase of its &pound;1bn campus at Brent Cross.<br />
The site will contain one of the world&rsquo;s largest living walls wrapping around the scheme spanning 7,400 square metres and featuring over 750,000 plants.Sources close to the project said the latest building had been a straight race with Winvic which Glencar]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/glencar-tipped-for-latest-london-data-centre/</link><pubDate>Mon, 09 Feb 2026 08:24:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/glencar-tipped-for-latest-london-data-centre/</guid></item><item><title><![CDATA[Muse to lead redevelopment of Wakefield shopping centre]]></title><description><![CDATA[Morgan Sindall&rsquo;s urban regeneration arm Muse is set to steer the demolition-led redevelopment of The Ridings shopping centre in Wakefield.<br />
The local Council has announced it is pressing ahead with plans to remake the city centre around housing, leisure and culture.Under the long-term vision, The Ridings would be flattened and replaced by a new Cathedral Quarter delivering more than 1,000 homes, wrapped around new public squares, green space, leisure uses and major cultural facilities.The o]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/muse-to-lead-redevelopment-of-wakefield-shopping-centre/</link><pubDate>Mon, 09 Feb 2026 08:22:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/muse-to-lead-redevelopment-of-wakefield-shopping-centre/</guid></item><item><title><![CDATA[Robertson Construction bounces back into the black]]></title><description><![CDATA[Scottish and North of England contractor Robertson Construction Group has pulled off a sharp turnaround, bouncing back into the black after a bruising prior year.<br />
The Elgin-based contractor posted a pre-tax profit of &pound;31m for the year to 30 June 2025, reversing a near &pound;13m pre-tax loss the year before.<br />
Turnover slipped back to &pound;575m from &pound;627m, but the softer top line was more than offset by a strong recovery in operating performance as tighter project control and improve]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/robertson-construction-bounces-back-into-the-black/</link><pubDate>Mon, 09 Feb 2026 08:21:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/robertson-construction-bounces-back-into-the-black/</guid></item><item><title><![CDATA[Developer Salboy opens construction division to wider market]]></title><description><![CDATA[Developer Salboy is making its construction arm available to the wider market with a focus on time-critical and distressed housing schemes.<br />
Salboy Construction was established in April 2024 initially focused on supporting some of the group&rsquo;s own developments as well as select sites financed by the groups&rsquo; investment arm Salboy Capital.<br />
The contracting division has grown to a team of 16 construction professionals, quantity surveyors and procurement specialists and has delivered 120 ho]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/developer-salboy-opens-construction-division-to-wider-market/</link><pubDate>Fri, 06 Feb 2026 14:43:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/developer-salboy-opens-construction-division-to-wider-market/</guid></item><item><title><![CDATA[15 firms bag £175m works Cumberland works deal]]></title><description><![CDATA[Cumberland Council has lined up 15 contractors on a &pound;175m capital works construction framework covering building, civils and combined schemes across its region.<br />
Regional contractors Cubby Construction, Story Contracting, and Thomas Armstrong (Construction) fared best in the procurement race securing spots on all three lots.Capital Works (Construction) FrameworkGeneral Building Works (&pound;0.2m&ndash;&pound;3m)Cubby Construction<br />
Equans Regeneration<br />
Michael Thompson (Public Works Contracto]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/15-firms-bag-175m-works-cumberland-works-deal/</link><pubDate>Fri, 06 Feb 2026 08:49:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/15-firms-bag-175m-works-cumberland-works-deal/</guid></item><item><title><![CDATA[Ardmore turns corner after bruising two years]]></title><description><![CDATA[Ardmore Group has signalled a sharp turnaround in fortunes, saying it is on track to return to profitability after two punishing years dominated by legacy construction problems and the collapse of its former contracting arm.<br />
The London-based contractor has just published delayed statutory results for the year to 30 September 2024, showing a &pound;41m loss on turnover down 16% at &pound;346m.<br />
The result was dragged down by losses on legacy projects, years of remedial works and a &pound;15m adjud]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/ardmore-turns-corner-after-bruising-two-years/</link><pubDate>Fri, 06 Feb 2026 08:26:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/ardmore-turns-corner-after-bruising-two-years/</guid></item><item><title><![CDATA[£3bn early works plan to lift Parliament renewal out of limbo]]></title><description><![CDATA[MPs and Peers are being pressed to back a &pound;3bn fast-start works package to finally get ahead of the spiralling repair bill at the Palace of Westminster and tee up the biggest restoration project in its history.<br />
A new report from the Parliamentary Restoration and Renewal Client Board calls for a seven-year &ldquo;phase one&rdquo; programme of early and enabling works to halt the cash drain on patch repairs and ageing systems, while kicking the hardest political decision on delivery to 2030.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/3bn-early-works-plan-to-lift-parliament-renewal-out-of-limbo/</link><pubDate>Fri, 06 Feb 2026 08:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/3bn-early-works-plan-to-lift-parliament-renewal-out-of-limbo/</guid></item><item><title><![CDATA[£3bn early works plan to kick-start major Parliament restoration]]></title><description><![CDATA[MPs and Peers are being pressed to back a &pound;3bn fast-start works package to finally get ahead of the spiralling repair bill at the Palace of Westminster and tee up the biggest restoration project in its history.<br />
A new report from the Parliamentary Restoration and Renewal Client Board calls for a seven-year &ldquo;phase one&rdquo; programme of early and enabling works to halt the cash drain on patch repairs and ageing systems, while kicking the hardest political decision on delivery to 2030.]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/3bn-early-works-plan-to-kick-start-major-parliament-restoration/</link><pubDate>Fri, 06 Feb 2026 08:14:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/3bn-early-works-plan-to-kick-start-major-parliament-restoration/</guid></item><item><title><![CDATA[Balfour powers back to top of contracts league]]></title><description><![CDATA[Balfour Beatty supercharged its way to the top of the contracts league in January after securing a blockbuster contract to deliver the world&rsquo;s first gas-fired power station with carbon capture and storage.<br />
The Net Zero Teesside power station project is valued as &pound;833m and sees Balfour deliver major onshore works for the plant as construction partner to Technip Energies.<br />
It marks a return to pole position in the monthly work won rankings after a long absence and lifted the firm to fou]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/balfour-powers-back-to-top-of-contracts-league/</link><pubDate>Fri, 06 Feb 2026 08:13:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/balfour-powers-back-to-top-of-contracts-league/</guid></item><item><title><![CDATA[Hinkley MEH contractors ordered to fix fire safety failings]]></title><description><![CDATA[The Office for Nuclear Regulation has served fire enforcement notices on five contractors working at the Hinkley Point C project after inspectors uncovered serious fire safety failings during a targeted inspection.<br />
The notices have been issued to members of the MEH alliance responsible for mechanical, electrical, heating, ventilation and air conditioning works on the Somerset nuclear new build: Altrad Babcock, Altrad Services, Balfour Beatty Kilpatrick, Cavendish Nuclear and NG Bailey.<br />
ONR carri]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/hinkley-meh-contractors-ordered-to-fix-fire-safety-failings/</link><pubDate>Thu, 05 Feb 2026 15:06:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/hinkley-meh-contractors-ordered-to-fix-fire-safety-failings/</guid></item><item><title><![CDATA[Buyers believe construction has “exited its tailspin”]]></title><description><![CDATA[Construction buyers are at their most optimistic for months and believe the industry has &ldquo;exited its tailspin&rdquo;.<br />
The latest bellwether S&amp;P Global UK Construction Purchasing Managers&rsquo; Index shows and industry still in contraction.<br />
But the decline in out put is getting slower and buyers see sunnier times ahead.The index reading was 46.4 in January &ndash; up sharply from December&rsquo;s five-and-a-half year low of 40.1.<br />
The latest reading was the highest since June 2025, but]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/buyers-believe-construction-has-exited-its-tailspin/</link><pubDate>Thu, 05 Feb 2026 13:22:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/buyers-believe-construction-has-exited-its-tailspin/</guid></item><item><title><![CDATA[Caddick wins first deal on Wolverhampton city centre regen]]></title><description><![CDATA[Caddick Construction has won the first main contract on a major Wolverhampton regeneration scheme of over 1,000 new homes and 20,000 sq ft of retail, leisure and commercial space<br />
The Smithgate scheme is being developed by ECF &ndash; a partnership between Homes England, L&amp;G and Muse &ndash; working with City of Wolverhampton Council to transform the 12 acre site.<br />
Caddick will build the first phase &ndash; known as Bicycle Works &ndash; which will deliver 331 quality new homes.ECF has secured]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/caddick-wins-first-deal-on-wolverhampton-city-centre-regen/</link><pubDate>Thu, 05 Feb 2026 12:37:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/caddick-wins-first-deal-on-wolverhampton-city-centre-regen/</guid></item><item><title><![CDATA[£1bn London Cancer Hub expansion gets green light]]></title><description><![CDATA[Aviva Capital Partners and developer Socius have secured planning for a &pound;1bn cancer research and treatment campus in Sutton.<br />
Plans include major buildings for global pharma firms, manufacturing space, wet labs, and collaborative offices. A &lsquo;Learning Lab&rsquo;, caf&eacute;s, creche and 220 affordable flats for key workers are also included.Construction is expected to follow as the project moves into delivery, with the scheme positioned as nationally significant science infrastructure]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/1bn-london-cancer-hub-expansion-gets-green-light/</link><pubDate>Thu, 05 Feb 2026 08:48:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/1bn-london-cancer-hub-expansion-gets-green-light/</guid></item><item><title><![CDATA[Muck away firm fined after digger bucket hits worker]]></title><description><![CDATA[A grab hire company has been fined after a mechanic suffered life-changing injuries when a JCB bucket fell on him while he was helping to repair a tipper truck.<br />
On the 24 October 2023, the employee of Salford Grab Hire Limited was assisting a colleague in repairing a broken lifting mechanism on a tipper truck body. A JCB was being used to prop up the tipper body in the raised position when the one-tonne bucket became dislodged and fell.<br />
The worker suffered multiple fractures to his hand, shoulde]]></description><link>https://www.newslocker.com/en-us/profession/construction_news/muck-away-firm-fined-after-digger-bucket-hits-worker/</link><pubDate>Thu, 05 Feb 2026 08:36:00 +0100</pubDate><guid>https://www.newslocker.com/en-us/profession/construction_news/muck-away-firm-fined-after-digger-bucket-hits-worker/</guid></item></channel></rss>